HV capacitor Testing.

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

Shift Move to ACR Shifts are taken solo since Aug. 1, 2010 – The shifter stays alone without anyone nearby from the late night though the.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Unit 21 Capacitance in AC Circuits. Objectives: Explain why current appears to flow through a capacitor in an AC circuit. Discuss capacitive reactance.
Initial Assistance Team Meeting Academic/Behavioral Interventions (Use One Section And Complete Progress Monitoring Chart for Each Area of Concern) Specific.
VLF Sinus 45 + Booster Product presentation
26 September 2000 High Voltage Plates and Capacitors Jack Fowler.
Objectives: 1. Define and calculate the capacitance of a capacitor. 2. Describe the factors affecting the capacitance of the capacitor. 3. Calculate the.
THIS PRESENTATION HAS BEEN UPLOADED TO THE WIKI. Motors, Controllers, and Regenerative Braking.
Start S2S2 S3S3 S4S4 S5S5 Goal S7S7 S8S8 Arrows indicate strength between two problem states Start maze … Reinforcement learning example.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Blinking LED Lab David Luong Herrick Chang. Recall Capacitor Flash in disposable camera.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
Goal: To understand the basics of capacitors Objectives: 1)To learn about what capacitors are 2)To learn about the Electric fields inside a capacitor 3)To.
CLIC Breakdown Workshop – CERN, May / 13 Delay Times in Breakdown Triggering CERN, TS-MME Antoine Descoeudres, Sergio Calatroni, Mauro Taborelli.
Charge collection studies on heavily diodes from RD50 multiplication run G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
Components in Series, Parallel, and Combination. Resistors in Circuits Series Looking at the current path, if there is only one path, the components are.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
CAREER PLANNING Is a life long process a person goes through to learn about himself, develop self concept & learn about career choices.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Procedure for Pro4 using Keithley
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Test of HV Prototype Boards for LHCb Outer Tracker NIKHEF, Amsterdam The Netherlands
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
WEEK 1 You have 10 seconds to name…
HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock,
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
ATLAS TRT Duke University CERN, Feb Barrel Capacitors  With socket and bent pin, forms capacitor assembly  Duke supplies capacitors, Hampton assembles.
FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.
7. Direct Current circuits. 11 Find the currents, which flow in all the wires of the circuit in this figure 12  9 V 6 V b a cd 18 
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
CH Poll Bulb 1 10  20  Bulb 2 Which bulb will be brighter? 1.Bulb 1 2.Bulb 2 3.Neither; they will have the same brightness.
Energy Stored by Capacitors Last lesson we plotted the graph of Charge against voltage for a capacitor and learnt that the gradient of the graph represented.
Objectives: 1. Define and calculate the capacitance of a capacitor. 2. Describe the factors affecting the capacitance of the capacitor. 3. Calculate the.
Objectives: 1. Define and calculate the capacitance of a capacitor. 2. Describe the factors affecting the capacitance of the capacitor. 3. Calculate the.

Diamond Sensor Tests for the CMS BCM Alexandr Ignatenko FCAL collaboration meeting May 7, 2008.
EdTechNJ eBoard STEM Education Platform The Symbols of Electric Components.
2005-Apr-04MPI Calorimeter Plans for SLHC1 ATLAS at SLHC Calorimeter R&D at MPI Three possible routes being investigated: Verify feasibility for high intensities.
LESSON 08 Using the gyro Sensor. LESSON 08 Using the gyro Sensor.
Rad hardness tests – Sept. 2003
Electric Circuits Fall, 2014
LESSON 08 Using the Gyro Sensor. LESSON 08 Using the Gyro Sensor.
BSS Prep work at CERN and Acceptance of Parts
Some proposals on HV circuits realization for segmented straw detector
196 HVC ENYCAPTM Hybrid Energy Storage Capacitor
Radiant Technologies, Inc. March 29, 2018
Barth CDM Measurement Components Improve Repeatability With Accurate Characteristics “Measure what is measurable; make measurable what is not” Galileo.
الأستاذ المساعد بقسم المناهج وطرق التدريس
Capacitor Assembly K. McFarlane 9/30/02 9/30/2002 TRT meeting Oct 2002
זכויות סוציאליות.
EDLC(Embedded system Development Life Cycle ).
First choice Experiment Or Quasi-experiment.
Work Breakdown Structure Tasks and Sub-Tasks
C.2.10 Sample Questions.
xPCgear.com MCE Remote Control Transceiver Learning Procedure
C.2.8 Sample Questions.
T-489: Induced Activity and Residual Dose Rates
C.2.8 Sample Questions.
Concept 0 - Capacitance C = q V C = capacitance (Farads)
Lesson 3. Controlling program flow. Loops. Methods. Arrays.
Presentation transcript:

HV capacitor Testing

Capacitors under testing Two tasks Capacitor testing (Duke) Capacitor preparation (Hampton) Capacitors under testing Johanson surface mount 1000pf, rated 2000 V, size 821. Material : X7R Choices are limited due to space Capacitors from four different lots (batches). ~Two years ago, the same capacitors (from different lots) were radiation tested at CERN and the results were mixed.

HV testing HV cycle Results Conclusion : Pass Connect 30 capacitors from each batch to HV=2000 V and discharge. Measure the total capacitance every 50 discharges. Number of cycles : 2000 Results Batch 1 One capacitor Surface HV breakdown during 1500-1550 cycles Inner HV breakdown during 1600-1650 cycles Batch 2/3/4 : No problem Conclusion : Pass

Test setup

Plan Repeat the same test with capacitors from HU (encapsulated and legs are attached) Long term test 30 capacitors from each batch connected to HV=2000 V and current is monitored. Irradiation test – CERN Requirement : All capacitors from all batches should pass. Decision by the end of 2002. There should be no problem in getting the capacitors (~6 weeks). Radiation test on ~100 random samples once the production batch is available Option in case of failure Go to lesser capacitance with different material (NPO)