Schedule after Shutdown

Slides:



Advertisements
Similar presentations
Summery of Cooling System Teflon Leaks* *This is independent of the internal problems Rob Pisani.
Advertisements

4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
8/7/2014 PHENIX WEEKLY PLANNING August 7, 2014 Don Lynch 1.
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
Jun 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
System Test Assembly 20th Oct 2009 M. Kurosawa. Current Status Performed system test with new FEM and software. Visit VICRISE on 13th Oct. 2-L and 8-R.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Stability Hidemitsu Asano. pixel unstable point seg#
Si Sensors for Additional Tracker
Berkeley status Aug 10th, 2012.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
<workgroup name>
Add to Table of Contents
Gas system Commissioning procedures and status
RIKEN VTX Software Meeting
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Do Now! 1-Find Waldo 2- Describe how to find him!
Radiation Laboratory Meeting
Maki KUROSAWA VTX Group 2014 Feb 20
ScECAL+AHCAL+TCMT Combined Beam FNAL
Current status of run14 VTX alignment
Alignment of the PHENIX Silicon Vertex Tracker (VTX) in 2014
This Presentation Pack is brought to you by
Weekly Report Maya SHIMOMURA Run dependent check for VTX alignment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
VTX readiness for RUN15 Y. Akiba.
CSC Turn ON Status Report by Fred B.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
East West Move to Table 2 N/S
1 2 Table No Table No 5 Table 5 Table ¾ Howell Movement
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Three Bridges Estates HOA Meeting
Presentation transcript:

Schedule after Shutdown Pixel Status in RUN13 and Schedule after Shutdown 10th Jun 2013

Pixel Operation Status in RUN13 Leak problem was found at top section of barrel 1 on 29th Apr. Stoped the cooling for this section. Decided to operate remained ladders since current for LV and HV looked normal for remained ladders after the leak. Behavior of several ladders became unstable after 29th Apr. Hit disappeared and several hot pixels appeared during run. We did replacement of FEM module, switch the FEM slots, reinitialize of chips and LV recycling but they not fixed the issue. Now investigating for this issues.

Hot Dead Map from RUN386773(3/10) to RUN398149(6/10) Sensor 3 Sensor 2 Sensor 1 Sensor 0 Chip 3 Chip 2 Chip 1 Chip 0 Normal Powered off B1 Ladder 5 – Ladder 9 Hot B1-L4-S Dead Known dead Chip ID = Layer*5*4*4 + Ladder*4*4 + sensor*4 + chip B1: Ladder 0 – Ladder 4 B0 : Ladder 0 – Ladder 4 B0-L2-S, B0-L3-N/S, B0-L4-N/S RUN ID 3/10 6/10 Leak problem was found for B1 top (manifold for ladder5 – ladder9) 4/29

Summary Table of Unstable Sensor Modules Unstable half ladders (magenta circled area in previous slide) : B0-L2-S, B0-L3-N/S, B0-L4-N/S and B1-L4-S. Those six half ladders became unstable after leak problem of Barrel1 (ladder5 – ladder9). Failed to initialization of readout chip. Now investigating Barrel Ladder N/S Sensor Rate (%) 2 S 91 3 N 90 1 89 88 4 84 92

Repair Status Ladder Encapsulation Location Status Arrival at BNL 18 Y Test O.K. 19 To be tested 21 22 9 N HAYASHI Encapsulating 6/19 – 22 23 25 RIKEN 7/10 – 13 26 Testing 12 Wiring 7/24 – 27 27 28 8/7 – 10 29 31 8/21 – 24 33 14 8/28 – 31

Two ladders that were installed in EAST 6 Ladders at Chemistry Lab Repaired Ladders Two ladders that were installed in EAST

Schedule Assembly of B0 and B1 can be started middle of Aug and Sep, respectively. Attaching of manifold. Pressure test. Electrical test without Big Wheel. Mating of B0 and B1 can be started end of Sep (after finishing of installation of B1). After mating, final test will be done with Big Wheel.

RIKEN side BNL side Man Power Hisayuki Torii (RIKEN) Takayuki Sumita (RIKEN) Testing and shipping of repair ladder. BNL side Taebong Moon (Yonsei Uni.) Hiroshi Nakagomi (Tsukuba Uni.) Hidemitsu Asano (Kyoto Uni.) Maki Kurosawa (RBRC) Testing, assembly, etc.

Back Up Slids

B0 Ladder0-4 (NORTH) 4/29 Leak was found Leak Current (uA) Date

B0 Ladder0-4 (SOUTH) 4/29 Leak was found Leak Current (uA) Date

B1 Ladder0-4 (NORTH) 4/29 Leak was found Leak Current (uA) Date

B1 Ladder5-9 (NORTH) Powered OFF 4/29 Leak was found Leak Current (uA) Date

B1 Ladder0-4 (SOUTH) 4/29 Leak was found Leak Current (uA) Date

B1 Ladder5-9 (SOUTH) Powered OFF 4/29 Leak was found Leak Current (uA) Date

WEST EAST B3-L11 B3-L12 B2-L7 B1-L8 B1-L9 B1-L10 Power off B0-L4 B0-L5

Hit Map of RUN386733-0000.PRDFF (9th Mar 2013)

Hit Map of RUN386733-0000.PRDFF (9th Mar 2013)

Hit Map of RUN394406-0126.PRDFF (10th May 2013)

Hit Map of RUN394406-0126.PRDFF (10th May 2013) Powered OFF