Test of the cleaning gas mixtures.

Slides:



Advertisements
Similar presentations
Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
Advertisements

Ignition System Trouble Diagnosis. Trouble Shooting Ignition System Failure of an engine to start could be due to a fuel system problem which we will.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
9 Jan Irradiation Tests Module 3B Many tests, see last slide for overview Irradiate small area: 2x2 cm 2, with 2 mCu 90 Sr, 2 cm distance (~200.
Outer Tracker Comments Aging Review Report: Ulrich Uwer University of Heidelberg LHCb Week May 27, 2004.
Mass Production of GEMs (Chicago/Purdue/3M) Aging of mass produced GEMS (Purdue) Operation of GEMS in Negative Ion Gases (Purdue/Temple/WSU) Towards mass.
Outer Tracker Comments Aging Review Report: Ulrich Uwer University of Heidelberg LHCb Week May 27, 2004.
Overview of Research in the Optics Working Group Gregory Harry, on behalf of the OWG Massachusetts Institute of Technology July 25, 2007 LSC Meeting –
M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano 2, P. de Simone 1, F.Murtas 1, D.Pinci 3, M. Poli-Lener 1, D. Raspino 2 and B.Saitta.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
Passive Investors and Managed Money in Commodity Futures Part 2: Liquidity Prepared for: The CME Group Prepared by: October, 2008.
19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
This study has been performed with an apparatus consisting of two identical standard MWPCs, a clean gas system, an outgasing box, a Copper X-ray generator.
9 Jan Ageing History 2005 Niels, Gras, Eduard & Sebastian 18 January 2006 TestModWireDateSourceCurrent/st raw DurationTests 90 Sr Scans I002A24L20-31.
September 9, 2003A. Cardini / INFN Cagliari1 M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini 2, C. Deplano 2, P. de Simone 1, F. Murtas 1, D.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Top Down Manufacturing
31 May 2006Update ageing measurements at NIKHEF - LHCb week - Niels Tuning 1/37 Update ageing measurements at NIKHEF 31 May 2006 Niels Tuning, Gras van.
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
Feb ’02, TRT Meetings Jack Fowler – Duke University SEM Analysis of Wire from Aging Test #5 Jack Fowler.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
22 Aug Ageing studies: the Miracle HV training.
May’02, TRT Workshop Jack Fowler – Duke University SEM Analysis of Wire from Aging Test #7 at Duke University Jack Fowler.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
How to Use Technical Analysis to Maximize Your Gains Presented by Peter Krauth.
12 July 2006Update ageing measurements at NIKHEF - Ageing Workshop - Niels Tuning 1/25 Update ageing measurements at NIKHEF 12 July 2006 Niels Tuning,
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
Chiho Wang Technical Training Duke University May, Stringing 101 Chiho Wang Duke University.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
BigBite Gas Cherenkov Update July 21, 2008 Brad Sawatzky (& Doug Higinbotham) ● I apologize for being out of town for this meeting – I booked my trip before.
Climate Change Observation, Inference & Prediction
Hardware considerations about Ar vs. Ne
A particle detector for educational purposes
Part 2: Colloids and Surfactants
Condition of electron beam welding toward a high gradient application
S.Movchan Straw prototype beam test into the NA48 infrastructure
Acceptance test at Duke
An extensive aging study of bakelite RPC
Effective substrate cleaning before deposition
Partial Warm-Ups at CLS
IEEE Symposium 2003, Portland
Jack Fowler Duke University Spain Workshop
Llea Nasira Samuel Benedict College Charlotte Wood-Harrington
Long irradiation at the side
Investigation on tray MID 063 Back
Alhussain Abuhozaa,b, S. Biswasb, U. Frankenfeldb, J. Hehnerb, C. J
DT Infrastructure: LV, HV, Gas
Gas Detectors Aging Review
“MUON” Collaboration meeting
Ageing workshop - N.Tuning
Objectives Identify three subatomic particles
Unique properties of water
Module Failures on RODs
Phase 2 R&D – Brief Introduction –
Atoms, Molecules, and Ions
(2) Incorporation of IC Technology Example 18: Integration of Air-Gap-Capacitor Pressure Sensor and Digital readout (I) Structure It consists of a top.
Transition Radiation Studies with Xe GlueX Collaboration Meeting
SEM Analysis of Wire from Aging Test #7 at Duke University
Single rate plateau curve with different gas mixture
CHAPTER 18: Inference about a Population Mean
Significance Tests: The Basics
Presentation transcript:

Test of the cleaning gas mixtures

Purpose Find out the safe operating limit of the glass wire-joint in mixtures with CF4 in case silicon cleaning is necessary. Run parameters Upper chamber 14 glass wire-joints – 5 were pulled out on July 25. The rest was pulled out on Sept 27. June/July/August : Ar-CO2-CF4 (70-14-16) : 16% mixture September : Ar-CO2(70-30) Lower chamber 11 glass wire-joints – 4 were pulled out on July 25. The rest was pulled out on Sept 27 Ar-CO2-CF4 (70-22- 8) : 8% mixture Moisture level : 700 ppm on average Gain June/July/August - ~30,000-40,000 September ~ 70,000-80,000 Current draw Average : 10 nA/cm – 30 nA/cm Around wire-joints : 30 nA-100nA/cm

Test module 2

Test setup

16% Results Failure (do not hold HV) occurred when the integrated charge was 0.2-0.3 C/cm. 0.22, 0.19, 0.26, 0.21, 0.27, 0.34 C/cm Tension loss proceeded the failure. All glass beads exhibited heavy etching reasonably proportional to the integrated charge. Despite the etching, there was no evidence of silicon deposit downstream (SEM & Gain measurement). This test ended at the end of August. At the time, there were two surviving wire-joints (#30, #31). The gas mixture was changed to Ar-CO2 (70-30) to study the residual effect of CF4 (more later).

Failed wire-joints (~0.3C/cm)16%

16% Wire #25. 0.27C/cm. Broken (8/25)

Wire-joints in 16% Note that there is no Silicon peak. Si is replaced by F.

Wire surface scan (16%) Left : “normal”. Right : somewhat smooth

16% Left : “normal”. Right : somewhat smoother

Wire Downstream of a wire-joint. There is no silicon deposit

Wire #26 (0.27C/cm). Broken 8/18

8% Results One failure occurred when the integrated charge was ~0.45 C/cm. Tension loss happened as early as ~0.3 C/cm. Etching on the failed joint was also evident. However compare to the failed ones in 16%, the etching was less. There was also no evidence of silicon deposit downstream (SEM & Gain measurement).

Failed wire-joint (~0.45C/cm)8%

8% (#10) Wire #10. 0.31 C/cm. Lost 22 grams of tension

Wire-joint (8%) There is still some silicon peak

Wire #12 (0.45C/cm) Broken 9/14

Residual effect of CF4 The 16% mixture was changed to Ar-CO2 (70-30) on September 3. The gas gain : ~70,000 (from ~30,000) Current Draw : ~17 nA/cm (=> ~50 nA around the wire-joints) Charge accumulation The integrated charge at the time of the switch : ~0.15 C/cm The integrated charge since the switch : ~0.1 C/cm Results The degree of etching was consistent with ~0.15C/cm rather than ~0.25 C/cm. No gain change was observed after the switch

0.15C/cm in 16%+0.1C in Ar-CO2 Wire #30, 31

16% -> 0% Wire #30 and #31

Wire-joint #30

16% -> 0% 4 cm downstream of wire-joint

16% -> 0% 20 cm downstream of wire-joint. The chunks are gold.

Wire #31

Summary Integrated charge From the 16% and 8% test, it seems that the failure integrated charge is roughly proportional to the CF4 fraction when the moisture level of ~700 ppm. 16% : fail at 0.2-0.3 C/cm 8% : fail at 0.4-0.5 C/cm Including the earlier measurement (CF4 ~20%, H2O ~ 2000-3000 ppm, integrated charge at the failure ~ 0.1 C/cm), it seems that the failure also roughly proportional to the H2O level. There is no silicon deposit or gain change. There is no gross residual effect when the gas is switched to non CF4 mixture.

Proposal Test 4% mixture – (may not be necessary) Test the effectiveness of the cleaning mixtures Produce silicon deposit with Ar-CO2 (70-30) <=> gain drop of ~10% Bubble through silicon oil? Use contaminated straws? Switch the gas to one of the cleaning mixtures. Determine the integrated charge necessary to restore the gain. Parameters CF4 fraction Moisture level Gain Irradiation level