(WBS ) Alan Wootton, LLNL April 24, 2002

Slides:



Advertisements
Similar presentations
Red: Berm PipeYellow: G2 Vac pump St.Blue: G2 EnclosureGreen: Bermpipe Flange Vacuum Issue Feb 1stMarch 1stApril 1stMay 1stJune 1st Michael Geelhoed 2/20/12.
Advertisements

February 17-18, 2010 R&D ERL David Pate R&D ERL Photocathode Deposition and Transport System David Pate February 17-18, 2010 Photocathode Deposition and.
E-Zapper Exit - Plasma Window 18 MeV Electron Accelerator Plasma Igniter Plasma Window Beam in Atmosphere Fast- Acting Valve 2 um Be Window Mechanical.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
Progress and Plan for Superconducting RF Cavity RF Group.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Stewart Shen April 20, 2006 UCRL-PRES-xxxx LCLS X-Ray Absorber Richard Bionta, Keith Kishiyama, Donn McMahon, Marty Roeben Dimitri Ryutov,
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
Stewart Shen October 27, LCLS-XTOD Gas Attenuator LCLS FAC Meeting October 27, 2005 Stewart Shen, Keith Kishiyama and Marty Roeben.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
ELI-NP The Way Ahead-Workshop March 10-11, 2011 Vacuum System for Beam Transport Catalin M. Ticos National Institute for Lasers, Plasma and Radiation Physics.
Ion Source Test Stand Vacuum Control System Johnny Tang.
PEEM III Endstation Design Review
Bubble Chamber Planning Meeting 04 September
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
PHYSICS 225, 2 ND YEAR LAB VACUUM TECHNOLOGY G.F. West Thurs, Jan. 12.
Donn H. McMahon XTOD Configuration October 24-26, 2005 UCRL-PRES X Ray Transport, Optics, and Diagnostics Overview FAC.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Bubble Chamber Planning Meeting 07 August
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
XFEL Vacuum System Commissioning
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
Action People Time [h] Shutting down the SR 2 1
Hall C Down Stream Beam Pipe And Dump Interface Design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
CF Organization & Schedule
J. Seeman Assistant Director for PPA/LCLS
e-Beams Systems Update
Installation of Photon Beam Transport to FEH
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Diagnostics Richard M. Bionta, LLNL April 24, 2002
Hall C Dump Status Beam Resuscitation Review
Far Experimental Hall - Hutches
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Mechanical Engineering progress for the Front End Test Stand
Project Management Issues John N. Galayda, SLAC April 24, 2002
Endstation Systems, Installation Costs and Schedule J. Hastings
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
Experimental Program and Endstations System (WBS ) J
X-Ray Endstation Design & Management/Commissioning
XTOD Attenuator Status
LCLS Lehman Review February 7-9, 2005
LCLS XTOD Mechanical and Vacuum Systems; Gas Attenuator
Lehman Review: XTOD Beam Transport
Vacuum Control System for Monolith Vacuum
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Vacuum System Design for the Target Monolith System
LCLS Photon Systems Overview
Keith Kishiyama, Marty Roeben Dimitri Ryutov, John Trent and
Presentation transcript:

(WBS 1.3.1.2) Alan Wootton, LLNL April 24, 2002 Mechanical and Vacuum (WBS 1.3.1.2) Alan Wootton, LLNL April 24, 2002 Requirements Components Costs Schedule LCLS DOE Review, April 24, 2002 Alan Wootton, Richard Bionta, LLNL

The requirements are specified Pipe pressure less than 10-7 Torr, pump life ~ 10 years, standard components 20 ft x 2 in diam pipe, 200 T-L/s ion pumps, bellows, ion guages, 8 keV operation possible during pump-down Be windows on some isolation valves Moveable roughing / turbo pump and leak detection stations Spools for future tanks; tanks supplied by user (I.e. another wbs) Protect upstream vacuum system in event of downstream vacuum failure fast close valve Earthquake supports Remove components without disturbing system isolation valves LCLS DOE Review, April 24, 2002 Alan Wootton, Richard Bionta, LLNL

8” port for additional pump Vacuum Section 8” port for additional pump Gate valve 2” dia x 20’ max ss pipe SS Cross Bellows Port for ion guage Valve for Rough pump (rear) Stand Ion Pump LCLS DOE Review, April 24, 2002 Alan Wootton, Richard Bionta, LLNL

1.3.1.2 Mech and Vac Cost Estimate (FY02 Dollars, Thousands) Name PED Construction Contingency Total 1.3.1.1.2 $ 1,408 - $ 243 $ 1,651 1.3.1.2.1 Front End Enclosure $ 185 $ 32 $ 218 1.3.1.2.2 Electron Dump $ 73 $ 13 $ 85 1.3.1.2.3 Hutch A1 $ 130 $ 25 $ 155 1.3.1.2.4 Hutch A2 $ 102 $ 19 $ 121 1.3.1.2.5 Hutch A3 $ 84 $ 15 $ 99 1.3.1.2.6 Hutch A4 $ 99 $ 18 $ 117 1.3.1.2.7 Tunnel $ 1,121 $ 206 $ 1,327 1.3.1.2.8 Hutch B1 $ 131 $ 14 $ 146 1.3.1.2.9 Hutch B2 $ 121 1.3.1.2.10 Hutch B3 $ 158 $ 26 $ 185 1.3.1.2.11 Hutch B4 $ 103 $ 123 1.3.1.2.12 Vac/Mech Systems $ 231 $ 58 $ 289 LCLS DOE Review, April 24, 2002 Alan Wootton, Richard Bionta, LLNL

A schedule has been developed Hall B occupancy Hall A occupancy FEE occupancy k$, FY02 FY03 FY04 FY05 FY06 FY07 Totals LCLS DOE Review, April 24, 2002 Alan Wootton, Richard Bionta, LLNL

Summary The vacuum components and costs are in hand PED will be used to more accurately determine the pumping requirements LCLS DOE Review, April 24, 2002 Alan Wootton, Richard Bionta, LLNL