Key Biscayne Substation

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

National Grid Local System Plan 2009 LSP Presentation Related Questions and Answers.
Solar Photovoltaic Power Stations. Fully Commissioned in Months Phased-In Generation Within One Month 99%+ Availability Offset Substation and Feeder Expansion.
Purpose overview of the form and use of the AER’s augex tool Not
Effects of high penetration levels of photovoltaic generation Observations from field data Amir Toliyat, Alexis Kwasinski and Fabian Uriarte The University.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
CLECO TRANSMISSION RATE CASE. AGENDA Welcome and Introduction Purpose of Meeting Transmission System Update Formula Rate Overview Formula Rate Protocols.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Load Forecasting Eugene Feinberg Applied Math & Statistics Stony Brook University NSF workshop, November 3-4, 2003.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Using Transformations to Graph the Sine and Cosine Curves The following examples will demonstrate a quick method for graphing transformations of.
Getting Planning Tools Closer To Real-Time and Operation CIM User Group Meeting Austin, TX October 23-26, 2007 Loris Arnold (516)
Smart Substation Transport Services for the Distribution Grid Operator Josco C.P. Kester
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
What is a business cycle? How do we measure employment, unemployment, and how it changes over the business cycle The Meaning of inflation/deflation Why.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Distributed Generation Benefits and Planning Challenges CREPC/SPSC Resource Planners’ Forum October 3, 2012 Arne Olson.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Lyndonville Electric Department Feasibility Analysis Review December 2,
Load Forecast and Base Case Development
Options to Manage Electricity Demand and Increase Capacity in Santa Delano County Jon Cook Jeff Kessler Gabriel Lade Geoff Morrison Lin’s Lackeys.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
December 2008 Sandia Advanced Microgrid R&D Program Advanced Microgrids – Supporting Use of Renewable, Distributed, and Smart Grid Technologies for Assured.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Transit Capacity Constraint Presented to: TPB Technical Committee April 1, 2005 Lora Byala Washington Metropolitan Area Transit Authority Office of Business.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
CustomerLeviton Project Name / Applicationoccupancy sensor Power Level2 watts continuous, 5 watts peak (not thermally significant) Transformer Part NumberRLC-1449.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
Frankfurt (Germany), 6-9 June 2011 Jukka Lassila – Finland – Session 6 – Paper 0773 Network Effects of Electric Vehicles Case from Nordic Country LUT Jukka.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
National Integrated Power Project Update Presentation to the Presidential Power Sector Workshop on May Niger Delta Power Holding Company Limited.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Dated: 17 February 2016 Instructor :Kashif Mehmood.
Power distribution and utilization Lecture 2 Instructor :Kashif Mehmood.
PJM ©2007 NERC LTRA Workshop August 16, 2007 Paul McGlynn Manager, Transmission Planning Department.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Power Transmission Components Market Share & Industry Analysis, 2016 –
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Middle East Distribution Transformer Market Price, Packaging Trends, Industry.
“Electricity Supply Reliability Project - Additional Financing”
Director, Transmission Services
Electric Utility Master Plan Update
NWA Suitability Criteria
the high-voltage network of CERN ToMORROW
I-5 Corridor Reinforcement Project
The Management of Renewable Energy
Power System Generation Expansion Plan
Chapter 7 Capacity Planning and Management
CHILE CALIFORNIA COUNCIL
Pacific Power Seismic Preparedness Update
Solid Waste Division - Operations
Irvine Smart Grid Demonstration Distribution Volt / Var Control
Appendix: 2017 RTEP Report Key Graphics and Information
Load Forecast and Base Case Development
Paris distribution system
TVA RC 2017 Summer Outlook TVA RC July 27, 2017.
Load Forecast and Base Case Development
NERC LTRA Workshop August 16, 2007
California Solar Initiative RD&D PV Integrated Storage: Demonstrating Mutually Beneficial Utility-Customer Business Partnerships Deepak Aswani May 4, 2017.
Review of Distribution Network Protection
Transmission System Update
Injection Substations
Presentation transcript:

Key Biscayne Substation Armando Fernandez February 14th 2018

Key Biscayne Substation Key Biscayne’s Transformers show no distribution capacity constraints and there are no significant load growth projections in the area Key Biscayne Substation Key Biscayne Distribution details 2 Transformers  (138 – 13 kV) 45 MVA TX #2759 – load 26.6 MVA  45 MVA TX #2760 – load 14.3 MVA   7 – 13kV distribution feeders Feeder MVA Rating 805331 5.1 10.2 805332 8.8 12.7 805333 5.7 11.3 805334 3.9 10.0 805335 8.5 10.5 805336 4.7 805337 4.3

In comparing the data,  the 2017 peak for the island reflects only 1MVA growth since the 2006 peak Planning Cases 2006 Planning case Substation 2006 Actual 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 KEY BISCAYNE 39.4 40.1 40.9 42.1 45.0 46.4 47.7 49.1 50.4 51.8 53.1 54.5 The request to expand Key Biscayne Substation in 2007 was centered on the 2006 planning case which forecasted tremendous growth out of this substation based on some of the highest growth years at FPL 2006 demand projections forecasted FPL would exceed the MVA rating of one of our transformers FPL must always have the ability to handle the load requirements on one of our transformers for redundancy Construction and permitting timetables, drove the need to apply for the expansion of Key Biscayne Substation Due to a 2008 pause on the rate of construction and new services, revised forecast demonstrate more stabilized growth curve which demonstrates no capacity constraints 2017 Planning case Substation 2017 Actual 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 KEY BISCAYNE 40.9 41 41.1 41.3 41.6 42.0 42.4 42.9 43.5 Key Biscayne Substation - there are no distribution capacity constraints and there are no significant load growth projections in the area