Kolb Road Sabino Canyon to Sunrise Drive

Slides:



Advertisements
Similar presentations
Chris Raykos Project Director Infrastructure Delivery Directorate
Advertisements

New Elementary School Project Overview of Dept. of Ed Role  Project Review/Approval Cycle Project applications submitted to DOE – June 2004 DOE construction.
Cost Estimation System Tool
Consulting + Engineering + Technology + Construction Page 1 5/1/2015 Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities Sharp Grossmont Hospital.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
Crestmoor Neighborhood Reconstruction Project Community Meeting January 26, 2012.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
ART IN THE LANDSCAPE Dr. Lou Mills LARC 1302 Spring 2014.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Proposed DRAFT New City Ordinance for Water Use in Landscaped Areas Public Meeting September 15, 2009.
Greater Cleveland Rapid Transit Authority Puritas Rapid Transit Station “Eclecticity, Connectivity, Comfort and Direction” A Functional Art Proposal by.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Brio Rapid Transit System Update on Stations and Timetables July 10, 2012.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Created by J. Walker & L. McHugh 9/06. Here is the artist in his studio and at work. In fact, it may surprise you to know that Piet Mondrian.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
Phase 2: 30% Design Plans September 4 th, 2012.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
CARSON CITY FREEWAY PHASE 2B-1 PHASE 2 PHASE 2A PHASE 2B.
Artist Research Project Write an artist biography (three pages) Page 1 - Biography is in understandable outline - Typed, 12 point Arial Font, Full sentences.
July Accomplishments: Authority and Design Build Contractor staff conducted the 3rd Urban Design committee meeting. Committee members viewed proposed station.
Residential Site Plan Considerations
Created by J. Walker & L. Rice 9/05. Abstract Art Is: artwork based on objects (ex. Flowers, landscapes, buildings) but the artist leaves out.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Freedom Park aka Gordon River Water Quality Park.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
SITE/PLOT PLANS APPLICATIONS OF TECHNOLOGY. DESIGNING A BUILDING ON A SITE Architects must consider the following about a site when designing a building.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
PORT OF TACOMA. [Insert Project photo as background] Project Update Parcel 88 Combined Habitat Project.
PORT OF TACOMA. Authorization for 3 actions: 1. Purchase acres at 1300 Taylor Way in the amount of $2,930,000; and, 2. Execute Agreement with City.
Whiteland & Graham Roundabout Project Update Trent Newport, PE,LS.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
Gilbert Road Light Rail Extension
Project Status & Right-of-Way Acquisition
Hemo Gorge Sculpture.
Jemtegaard Trail Project was originally funded by a Safe Routes to School (SRTS) which is a federal grant administered by WSDOT Total funding for design,
Col. Pike Multimodal: About the Project
Ensuring outstanding teaching in art & design
UCLA SCI | ART MANOLAB Summer Institute 2017
Campus Master Plan.
Fred George Basin Greenway
IA 122 RECONSTRUCTION PRE-BID MEETING
Ensuring outstanding teaching in art & design
Mertarvik Relocation Project
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
Woodinville-Duvall Road Widening Project Update
SE 12th Street Roadway Improvements February 8, 2005.
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
1200 West Widening and Reconstruction Project
Year 12 transition task ART 2018.
Public Art for Public Good
U.S. EPA Clean Air Markets Division
Brackish Water Desalination Project
Physical Space - LANDSCAPES
GALVESTON COUNTY WCID NO BOND PROGRAM
Licton Springs P-Patch Food for Thought
Antietam Road Sidewalk
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Richland Creek Water Supply Program Program Update
November Bond Election
Presentation transcript:

Kolb Road Sabino Canyon to Sunrise Drive September 20, 2018 CAC Update Meeting

Kolb Road Project Topics Project Status Update Project Art Update Landscape Update Open Discussion Comments/Discussion

Project Status Update Final Plans Under Review Artwork – Being Finalized Landscape - Being Finalized Major Utility Efforts Starting CenturyLink, SWG, TEP, Comcast, Tucson Water Right of Way Acquisition - Ongoing Federal Funding Authorization – Spring 2019 Project Bidding – Summer 2019 – Utility Relocation Driven Construction Kick Off Meeting – After Award

Project Art Update Same concept, new shape: an abstract, organic sculpture inspired by nature Placement: 3 large-sized shapes in roundabout and 2-3 smaller-size along Kolb next to sidewalks Medium: metal with mosaic inlay

Project Art Update Sample views: Proposed size: large 11’ and small 5-7’

Landscape Update Landscape to feature native, low water use plantings Plant palette based on native plants found on site Two example areas of landscape plan Proposed slope treatments and examples Collaboration with public artist at Roundabout

Landscape Update Landscape Palette

Landscape Update Landscape Plan Example Area

Landscape Update Landscape Section Example Area.

Landscape Update Landscape Plan Example Area

Landscape Update Landscape Section Example Area

Landscape Update Slope Treatments

Landscape Update Landscape Plan Roundabout Area

Landscape Update Landscape Plan Roundabout Area

Landscape Update Landscape Section Roundabout Area

Comments/Discussion