6.3 Sediment management options

Slides:



Advertisements
Similar presentations
6.5 River Stability and Bank Protection John Ratsey
Advertisements

6.6 Canals and Command Area Structures. (1) Canals in Spate Schemes  traditional systems are diverted to short, steep canals in the upstream areas (with.
1.3Economic Costs and Benefits. Spate irrigated areas are often among the poorest areas in a country and therefore require special attention.
CASE STUDY OF WADI LABA AND WADI MAI ULE (ELWDP – ERITREA) Lesson 5
DAMS.
Department of Civil Engineering, I.T.U
Module 1 : Understanding the Wadis John Ratsey
6.13 Design experiences in Tigray:
Objectives Describe how surface water can move weathered materials.
HOW DO RIVERS CONVEY EARTH MATERIALS TO THE OCEAN? If the “objective” of all these landscape shaping processes is to take earth materials from high locations.
Miscellaneous Structures Stilling Basin Stilling Basin Stilling basin is used at the end of an Ogee type weir to reduce the velocity of the running water.
1D SEDIMENT TRANSPORT MORPHODYNAMICS with applications to RIVERS AND TURBIDITY CURRENTS © Gary Parker November, CHAPTER 13: THE QUASI-STEADY APPROXIMATION.
Chapter 6.2 The Work of Streams.
Flood management. Flood Management Floods occur when discharge exceeds bankfull capacity. Water leaves channel to cover adjacent land – the flood plain.
6.4 Improving Diversion Works
SPATE ENGINEERING GASH RIVER - SUDAN Lesson 4
Sediment transport in wadi systems
Chapter 11 River Systems and Landforms
CASE STUDY: SHEEB FARMERS ASSOCIATION, ERITREA 2.3.
Chapter 13 Surface Water.
NIRAV JAYANTIBHAI DHANDHUKIA SHELADIA MIHIRKUMAR KISHORBHAI
Sediment Transport in Wadi Systems Part 1: Overview
Surface Water Chapter 9.
Sediment transport in wadi systems Part 3 - Sediment management structures and canal design
Module 2 (part 1) Improving Diversion Works John Ratsey
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
6.10 SHARC Software usage for Spate irrigation John Paul van der Ham.
1.6 Experience and challenges of spate irrigation projects in Tigray (By Demisew Abate)
Head works.
SOIL MANAGEMENT AND MOISTURE CONSERVATION
6.7 Improved Traditional Systems
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
2.2 Spate water rights and distribution rules. This is Anambar Weir, Balochistan (Pakistan) What happened here?
3.1 Participatory Design. WHY PARTICIPATORY DESIGN?  To understand and agree priorities and make the best design for the system accordingly  To tap.
6.11 Case: Wadi Labka – What to Do When Traditional System Becomes Unsustainable.
EARTH SCIENCE Prentice Hall EARTH SCIENCE Tarbuck Lutgens 
7. Bedforms in coarse-grained channels Step-pool units Cluster bedforms Riffle-pool sequences.
Transpiration Similar to evaporation, this is the loss of water through plants. – Pores in leaves (stomata) are opened to release oxygen and water vapor.
Journal #4 Why are river system constantly changing? The narrow depression that a stream follows downhill is called its _________. What causes the formation.
6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.
4.3 Groundwater management in Spate Irrigation Systems.
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
River Systems Section 2 Section 2: Stream Erosion Preview Key Ideas Parts of a River System Channel Erosion Development of River Channels Tributary, River.
Unit 1.3B_4 River Landforms. Now you know a bout the processes that enable the river to change What does the river look like?
HYDROLOGY & WATER RESOURCES ENGINEERING TYPES OF SPILLWAYS
CONTENTS 1. Intakes for Collecting Surface Water Page no. (1) (3) (5)
Assoc. Prof. Dr. Tarkan Erdik
1.2 Typology of spate irrigation systems
6.12b Belilo Spate Irrigation System
Spate Irrigation.
Improving Diversion Works
Chapter 9 Surface Water Runoff- water flowing downslope on Earth’s surface. Factors: Vegetation- ↓ runoff due to pore space & slows down precipitation.
CASE STUDY: SHEEB FARMERS ASSOCIATION دراسة حالة: جمعية مزارعي شيب
6.2 Sedimentation Issues: Overview
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
The Work of Streams.
Discharge, stream flow & channel shape
UNIT 8 CANAL HEAD WORKS SANDEEP LECTURER IN CIVIL ENGG. GP MEHAM.
The shapes of stream channels
1. 6 Experience and challenges of spate irrigation projects in Tigray
REGULATION WORK UNIT – 10 LECTURER IN CIVIL ENGG. GP MEHAM SANDEEP.
ECONOMIC COST AND BENEFITS
Part 4 - Sediment management options + exercise
2.2 Spate water rights and distribution rules
Running Water Earth Science Chapter 6
IMPROVED TRADITIONAL SYSTEMS
BASIC SEDIMENT TRANSPORT AND RIVER MORPHOLOGY
SPATE WATER RIGHTS AND DISTRIBUTION RULES
Field water distribution
FIELD WATER DISTRIBUTION
Presentation transcript:

6.3 Sediment management options Phil Lawrence (p.lawrence@sediments.plus.uk)

Summary sediment management strategy Limit the diversion of coarser sediments Transport fine sediments through canals to the fields Make provision for the inevitable rise in command levels

Limiting the diversion of coarser sediments: four options Locate intakes at outside of bends Sediment excluding intakes Limit diversion when wadi flows high –throttling structures or close gates Secondary sediment control

(1) Location of intakes at bends The low flow channel carrying flood recession flows forms at the outside of a wadi bend. (Traditional intakes are placed at the outside of wadi bends for this reason.) In floods bed load sweep will move the largest sediments towards the inside of a bend and away from an intake.

Bed load sweep at a channel bend

Traditional intake showing location at the outside of a wadi bend

Limiting the diversion of coarser sediments Locate intakes at outside of bends (2) Sediment excluding intakes Limit diversion when wadi flows high –throttling structures or close gates Secondary sediment control

Example of a spate sediment excluding intake

Features of the “spate” intake No divide wall, flows can approach from any direction including parallel to the weir Intake aligned to minimise the diversion angle Curved channel with floor set lower than the intake gate sill encourages coarser sediments to move through the sluiceway In this case a fuse plug was used

Limitations of sediment excluding intakes in spate schemes Spate intakes divert all the wadi flows except for the short periods, sometimes only minutes, during flood peaks when wadi flows exceed the intake capacity. Sediment exclusion only effective during these periods. Sluice gates have to be operated in response to rapidly varying spate flows – mechanised gates desirable but not often affordable. It is not unusual for farmers to block the sluice gate as they do not want to loose water – in some systems however the downstream farmers take their water from the sluice gate and this makes the sluice gate operated

Downstream area irrigated from scour sluice

Limiting the diversion of coarser sediments Locate intakes at outside of bends Sediment excluding intakes (3) Limit diversion when wadi flows high –throttling structures or close gates Secondary sediment control

Basic intake

Limit diversion from flood peaks For simple un-gated intakes use flow throttling structures with a rejection spillway to limit the flows entering a canal. For gated intakes consider closing canal gates during short periods of high flow. (There are problems of responding to rapidly varying flows, and farmers reluctance to “waste” water) Flow throttling structures with a rejection spillway are also used with gated intakes to ensure that canals are not damaged by excessive flows if the gates are left open during very large floods .

Limitation to throttling structures May not be like by farmers – too much of the flow is lost May attract trash and become clogged

Limiting the diversion of coarser sediments Locate intakes at outside of bends Sediment excluding intakes Limit diversion when wadi flows high –throttling structures or close gates (4) Secondary sediment control

Secondary sediment control Settling basins Canal sediment extractors

Wadi Mawr settling basins

Models are used design settling basins/gravel traps Model predictions include: Variation in sediment concentrations and grain sizes passing through a basin it fills with sediment. Estimates of the frequency of sediment sluicing or de-silting operations. The time period required to flush the basin and the volume of water needed for flushing. The dimensions of an escape channel to convey sediment flushed from a basin to the river or disposal point.

Minimising trapping fine sediments A disadvantage of settling basins in spate schemes is their high trap efficiency for fine sediments at low flows or when basins are empty. To minimise the trap efficiency for fine sediments: Basins should be relatively narrow, with sediment storage obtained by increasing the length, rather than the width or depth of the basin. If it is considered necessary substantial reductions in the trap efficiency for fine sediments can be made if the tail water level in the basin is lowered for very low basin discharges. One possibility is to provide a notched weir at the basin exit, so that tail water levels are substantially lowered when the basin discharge is very low.

Secondary sediment control for spate schemes Settling basins – Mechanically excavated or flushed basins can provide high sediment trap efficiencies with a low, or in the case of mechanically excavated basin, zero, “wastage” of water for sediment flushing. But sediment trap efficiency varies as a basin fills, and also with the basin discharge which varies from zero to full supply discharge in spate schemes. Canal sediment extractors – Trap coarse sediment with a relatively constant trap efficiency but require continuous flushing flows of between 10% and 15 % of the canal discharge. Conventional extractors not suitable for use in spate schemes.

Limitations to secondary sedimentation control Not easy to get it right – i.e. catching the coarse and not the fine sediment Requires space, esp. if sediment loads are high – this space may not be there Cleaning requires adequate organization In case of flushing systems, farmers may object on water being used for this

Desilting a small basin