1 HOSIP Research Project, Gate 3 12/17/2008 Snow Model Intercomparison Project Phase 2 Victor Koren, Hydrology Group.

Slides:



Advertisements
Similar presentations
1 Operational Strategy and Climate Change Operational Programs.
Advertisements

Climate Prediction Applications Science Workshop
I3/CA Europlanet - EC Contract EUROPLANET in FP-7 Tentative overall structure of Europlanet in FP7 and further Preparations.
CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
MSIP Accountability Plan
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, April 2007 ENSEMBLES in Helsinki WELCOME / TERVETULOA!
DISAT-Contribution R. Ferrise, M. Moriondo and M. Bindi 1. What are the main objectives of our study? –Select/Test impact models to simulate different.
Ministry of Food, Agriculture and Fisheries Danish Institute of Agricultural Sciences ENSEMBLES Tove Heidmann & Jørgen E. Olesen, DIAS.
ENSEMBLES General Assembly, Prague, Czech Republic, November 2007 Potential WP Participants (known absentees underlined): DJF, DISAT, FMI, FUB, LUND,
Final Report Anton Schrag REGIO D1
1 Establishing Performance Indicators in Support of The Illinois Commitment Presented to the Illinois Board of Higher Education December 11, 2001.
DRC 2006.Presenters Name.March 7-9.p 1 Californias enormous computing resources allow climate simulations at unprecedented resolution capturing Californias.
ZAE BAYERN Techniken für Energiesysteme und Erneuerbare Energien Dipl. Phys. Manfred Reuß 05/2012 IEA ECES ExCo in Lleida IEA ECES Annex 27.
Gaining Senior Leadership Support for Continuity of Operations
ACCREDITATION Community Day February 1, Significance of Accreditation Accreditation – Accreditation – Allows the students at KC to apply for Federal.
1 ASIAN INSTITUTE OF TECHNOLOGY SUMMARY REPORT OF THE AUDIT COMMITTEE MARCH, 2006.
Overview of the EPRI Groundwater Assessment Program
Course Introduction: Overview of Water Supply Forecasting Practices Kevin Werner, CBRFC.
WASC Review: Whats happened so far. May 19, 2008 In-service.
© WRI & WBCSD, 2010 Metropolitan Washington Council of Governments (COG) Recycling Committee Meeting March 18, 2010 Greenhouse Gas Protocol Product/Supply.
Workforce Opportunity Services An Overview 1 Dr Art Langer.
Layout Optimisation Brings Step Change in Wind Farm Yield Dr Andrej Horvat, Intelligent Fluid Solutions Dr Althea de Souza, dezineforce Come and visit.
An Evaluation of Economic and Non-economic Techniques for Assessing the Importance of Biodiversity and associated Ecosystem Services to People in Developing.
IMPACT ~ Breach Formation (WP2) Overview of Breach Work Programme.
World’s Largest Educational Community
Mid-term Evaluation Implementation of the EU Structural Funds in R&DI and Higher Education, Stage 1: Strategic view
1 CODATA 2006 October 23-25, 2006, Beijing Cryospheric Data Assimilation An Integrated Approach for Generating Consistent Cryosphere Data Set Xin Li World.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
Globally distributed evapotranspiration using remote sensing and CEOP data Eric Wood, Matthew McCabe and Hongbo Su Princeton University.
Hydrological Modeling FISH 513 April 10, Overview: What is wrong with simple statistical regressions of hydrologic response on impervious area?
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Moving Forward after the Colorado River Basin Water Supply & Demand Study Urban Water Institute’s 21 st Annual Conference San Diego, CA August 14, 2014.
1 Comparison of forest-snow process models (SnowMIP2): uncertainty in estimates of snow water equivalent under forest canopies Nick Rutter and Richard.
MODELING OF COLD SEASON PROCESSES Snow Ablation and Accumulation Frozen Ground Processes.
Office of Research and Development National Exposure Research Laboratory, Atmospheric Modeling and Analysis Division S.T. Rao Director, Atmospheric Modeling.
Advanced Metropolitan GIS Plan Final Report Presentation December 14, 2000 Jerry Happel – PlanSight LLC Fargo-Moorhead Council of Governments.
Advances in Macroscale Hydrology Modeling for the Arctic Drainage Basin Dennis P. Lettenmaier Department of Civil and Environmental Engineering University.
Earth Science Division National Aeronautics and Space Administration 18 January 2007 Paper 5A.4: Slide 1 American Meteorological Society 21 st Conference.
COST 717 USE OF RADAR OBSERVATIONS IN HYDROLOGICAL AND NWP MODELS The main objective of the Action is the assessment, demonstration and documentation of.
Who are we? -Group of active climate researchers with diversified expertise in a wide range of disciplines relevant to climate science, including atmosphere,
ZLOT Prototype Assessment John Carlo Bertot Associate Professor School of Information Studies Florida State University.
Preliminary Applications of the HL-RDHM within the Colorado Basin River Forecast Center Ed Clark, Hydrologist Presented July 26 th, 2007 as part of the.
Margaret Martin Gardiner Assessment Librarian The University of Western Ontario LibQUAL+2007 Canada 25 October 2007.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
AWIPS II Update Unidata Policy Committee Meeting J.C. Duh Chief, Program & Plans Division, Office of Science & Technology, NWS April 15, 2010.
Evaluating Utah Energy Balance Snowmelt Model in Operational Forecasting John A Koudelka David Tarboton Utah State University 3/26/2015.
Implementation and preliminary test of the unified Noah LSM in WRF F. Chen, M. Tewari, W. Wang, J. Dudhia, NCAR K. Mitchell, M. Ek, NCEP G. Gayno, J. Wegiel,
National Weather Service Water Science and Services John J. Kelly, Jr. Director, National Weather Service NOAA Science Advisory Board November 6, 2001.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Parameterisation by combination of different levels of process-based model physical complexity John Pomeroy 1, Olga Semenova 2,3, Lyudmila Lebedeva 2,4.
Improving and Focusing a Training Course using GroupSystems Electronic Meeting Technology Alan Weatherall Ventana UK
FY07 Hydro Group Proposals to AHPS SLF Theme Team Mike Smith October 12, 2006.
Advancing Water Supply Forecasts in the Colorado River Basin for Improved Decision Making.
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
Performance Comparison of an Energy- Budget and the Temperature Index-Based (Snow-17) Snow Models at SNOTEL Stations Fan Lei, Victor Koren 2, Fekadu Moreda.
WMO CIMO Survey National Summaries of Methods and Instruments for Solid Precipitation Measurement - Preliminary results - R Nitu Meteorological Service.
Focus areas of the NWS Missouri/Souris River Floods of May-August 2011 Service Assessment – Per the NOAA and NWS Strategic Plans, gather stakeholder input.
An advanced snow parameterization for the models of atmospheric circulation Ekaterina E. Machul’skaya¹, Vasily N. Lykosov ¹Hydrometeorological Centre of.
Demographic Full Count Review Presentation to the FSCPE March 26, 2001 Washington D.C.
COST Action and European GBIF Nodes Anne-Sophie Archambeau.
Predicting the hydrologic implications of land use change in forested catchments Dennis P. Lettenmaier Department of Civil and Environmental Engineering.
Modernization Maturity Model and Roadmap
Asian Cooperation in KEK
GFDL Climate Model Status and Plans for Product Generation
Utah Water Research Laboratory
Analysis of influencing factors on Budyko parameter and the application of Budyko framework in future runoff change projection EGU Weiguang Wang.
Presentation transcript:

1 HOSIP Research Project, Gate 3 12/17/2008 Snow Model Intercomparison Project Phase 2 Victor Koren, Hydrology Group

2 Outline 1.Overview of the project –Project goals –Evaluation 2.Milestones and Deliverables 3.Research Future plans

3 1.Overview

4 Project Background Collaborative project involving international team of snow modeling scientists from: –France, Japan, Canada, US, UK, Switzerland, Sweden, Finland, Russia, China, Germany, Portugal Continuation of initial SnowMIP 1 project that started in 2000 and concluded in 2002

5 Project Goals Address the need for advanced Snow modeling capabilities in a wide range of geographic areas and ecosystems. Evaluate snow processes including: –Accumulation and melt in forested areas Enable RFCs to gain thorough understanding of the effects of forest cover on snow accumulation and ablation Promote collaboration between academic institutions and international researchers in the field of snow science Gain further understanding on snow science models to determine potential benefits, identify gaps in snow model techniques and make recommendations for future improvements

6 Evaluation

7 Project Contributors Victor Koren, HSMB Scientist Mike Smith, HSMB Hydrology Group Lead Eric Anderson

8 Research Approach & Techniques Use the Noah energy budget model and NWS Snow17 temperature index parameterization in the project Made minor changes to the models to mimic canopy effects Generate snow accumulation/ablation results for all SnowMIP2 pared (forested and open) sites using Noah and Snow17 models Prepare simulation results and submit to the SnowMIP2 organizing committee Present preliminary results at the IUGG conference and discuss the project progress with attending SnowMIP2 participants Interact with the committee in analysis of results and preparation of overall summary, prepare journal paper and presentations, and consult with NCEP scientists on findings and recommendations.

9 Deliverables & Milestones DeliverableStart & End DatesStatus Develop Project Plan03/31/2007Completed HOSIP Gate Approval of Research PlanJune 2007Completed Develop IUGG SnowMIP 2 PresentationJune 2007Completed Attend IUGG conference in Perugia ItalyJuly 2007Completed Analysis of SnowMIP 2 resultsOct-2007Completed Discuss research results with NCEPJuly 2007 – Dec 2007Completed Write Journal paperOctober 2008Submitted to Journal of Geophysical Research, Atmosphere Develop recommendation for SSST and NCEP Quarter 1 Fiscal year 09Completed HOSIP Gate 3 review and final presentation December 17,2008

10 Critical Success Factors Timely distribution of all SnowMIP 2 results to participants for analysis (release of SnowMIP 1 results was delayed somewhat) Full attendance and participation of SnowMIP 2 participants at IUGG meeting to discuss results

11 Findings & Recommendations Assessment of individual model performances indicates there is no universal best model or subset of better models When all models are considered collectively, it is harder to model SWE at forested sites than open sites A model that performs well for one year at an open site is more likely to perform well in the subsequent year. However, at forest sites there is more variability in relative model performance between years A good performance by a model at a forest site is unlikely to guarantee a good model performance by the same model at an open site (and vice versa) Conversely, and contrary to experience in some previous land surface model intercomparisons, the multi-model mean does not perform consistently better than the individual models

12 Findings & Recommendations, cont. Parameterization tools and physic improvements for Snow17 (e.g., use of simulated snow depth, wind effect, a priori parameters, MODs combined with NOHRSC, etc.) will be important in river runoff prediction for an extended time period It is critical to perform more rigorous tests, including data sensitivity, of energy models, particularly the NOHRSC model Forest effect is significant for snowmelt timing at very dense forest canopy. There is a need to develop simple parameterizations of forest canopy effects on snow ablation/accumulation

13 Future Plans Improve and evaluate Snow-17 a priori parameters: –Via existing HOSIP project "Lumped and Distributed Model Parameterization" –Leverage CONUS-wide simulations from NCEP-OHD project Prepare recommendation for a new HOSIP project on an improvement of Snow-17 physics