FNAL Hybrid Testing Status

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
WEEK 1 You have 10 seconds to name…
LDR 531 Week 1 Summary To purchase this material click on below link 531/LDR-531-Week-1-Summary For more details
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
LDR 531 Week 5 Summary To purchase this material click on below link R-531/LDR-531-Week-5-Summary For more details
LDR 531 Week 6 Summary To purchase this material click on below link 531/LDR-531-Week-6-Summary For more details
UCSB Hybrid Bonding & Testing
On behalf of the US TOB testing group
Hybrid & Module Testing Status
US Module Production Status
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Results from module testing
Recent TOB Developments
Vienna Module Production
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
UCSB Qualification Module Grading
Hybrid Status/Deliveries
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Encapsulation Studies
Module Testing Status Week of 6/14-6/20.
Noise in TOB modules and sensor quality
US Module Testing Progress Report
Production Status 39 modules produced
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Status of 44 ARCS tested TOB modules, June 24, 2004
FNAL Hybrid Testing Status
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Hybrid & Module Testing Status

Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

FNAL Hybrid Testing Status Week of 12/5-12/9

FNAL Hybrid Summary As of 12/9/2005

TOB Hybrid Testing Failures This (Last) Week 1 Global shorts and noise 1 few shorts and noisy Cumulative 7 Shorts in PA 2 Shorts on APV 6 Noisy channels-usually entire chip or chips 2 a few open and noisy channels 3 too many shorts 4 shorts & noisy channels 3 many noisy and short channels 3 scratched PA 2 Too many opens 2 Opens & shorts 1 Damaged during testing 1 many open & noisy channels 6 Global failure

TEC Hybrid Testing Failures This (Last) Week 1 global shorts 1 too many shorts, noisy 1 few shorts and noisy Cumulative 2 damaged at repair 2 too many noisy one open 1 two chips noisy and shorted 3 too many noisy channels 2 all chips noisy 5 global failure 9 shorts and noisy channels 9 scratch on PA 2 messy PA 3 too many open, noisy, short channels 2 too many shorts

Fermilab Hybrid Test Details A new graduate student/technician……