ILIMA Experiments in the CR

Slides:



Advertisements
Similar presentations
The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
Advertisements

HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Magnets for the ESRF upgrade phase II
ALPHA Storage Ring Indiana University Xiaoying Pang.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Alignment and Beam Stability
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PPAC in ZDC for Trigger and Luminosity Edwin Norbeck University of Iowa Luminosity Workshop November 5, 2004.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Oleksiy Dolinskyy 23 rd October, FAIR layout of accelerators Collector Ring.
Muons, Inc. Feb Yonehara-AAC AAC Meeting Design of the MANX experiment Katsuya Yonehara Fermilab APC February 4, 2009.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
PPAC Jonathan Olson University of Iowa HCAL November 11-13, 2004.
for the HADES Collaboration
CR Time-of-Flight detector Present status
Oleksiy Dolinskyy 1st December, 2014
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Oleksiy Dolinskyy December 1st, 2014
Phase Feed-Forward Piotr Skowroński (CERN)
Overview of SuperB Particle identification, and work towards the TDR
GSI IPMs.
Physics opportunities with heavy-ion detectors in the CR
Status of HESR 18th March Gießen Dieter Prasuhn.
Performance of timing-RPC prototypes with relativistic heavy ions
Status of the CLIC DR wiggler design and production at BINP
The Budker Institute of Nuclear Physics
Test of Optical Stochastic Cooling in CESR
Simulation of Luminosity Variation
Low Emittance Rings 2014 Workshop
Isochronous Mode of the CR
Justus-Liebig-University Giessen
the s process: messages from stellar He burning
Test of Optical Stochastic Cooling in CESR
Beam Collector Ring Dmitry Shwartz BINP, Novosibirsk 6th BINP-GSI-FAIR workshop
Acceleration of Polarized Protons and Deuterons at HESR/FAIR
6th BINP-GSI-FAIR workshop
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
CHEN, Fusan KANG, Wen November 5, 2017
Design of the MANX experiment
Magnets for the ESRF upgrade phase II
Wakefield Accelerator
Bunch Separation with RF Deflectors
Overview Multi Bunch Beam Dynamics at XFEL
The new 7BA design of BAPS
ERL accelerator review. Parameters for a Compton source
Advanced Research Electron Accelerator Laboratory
CLIC damping rings working plan towards the CDR
SPEAR3 Lower Emittance & Nonlinear Dynamics
Physics Design on Injector I
Feedforward correction to injection bump error in the SPring-8
Pulsed Sextupole Injection for Beijing Advanced Photon Source
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Kicker and RF systems for Damping Rings
Implantation detector as active stopper Rakesh Kumar, P. Doornenbal, I
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

ILIMA Experiments in the CR Helmut Weick, GSI Budker-GSI collab. workshop Novosibirsk, 8th Nov 2018 Goals of Experiments Detector Systems (Schottky, ToF, Heavy-Ion) Integration into the CR Requirements on CR

ILIMA = Isomeres, LIfetimes and MAsses - Total binding energies - Nuclear decay modes - Separation energies - Driplines - Pairing correlations - Deformations - Shell closures - Reaction Q-values - Testing and improving nuclear theories

ILIMA = Isomeres, LIfetimes and MAsses - Total binding energies - Nuclear decay modes - Separation energies - Driplines - Pairing correlations - Deformations - Shell closures - Reaction Q-values - Testing and improving nuclear theories - Path ways of nucleosynthesis

horizontal and longitudinal Schottky pickups horizontal and longitudinal Detector pockets TOF-2 16.8m TOF-1

EC decay in ESR cooling, 2 EC and 2 b+ -decays Dm/m = 3.7x10-5 4.9 MeV b+ 142 59+ 142 59+ Nd Pm EC + b+ cooling

Resonant Schottky Pickup (with transverse position measurement) Use pill box cavity in T010 monopole mode fR tunable, quality factor Q also adjustable. Elliptical cavity possible to introduce gradient in R/Q, signal strength gives position R/Q [Ω] 168cm y/cm 14 cm x/cm S. Sanjari, X. Chen

New prototype Symmetric design Made of 100% stainless steel Vacuum friendly Easy construction No movable parts in the support No ceramic gap (hence no reliance on ceramic spec) Variable sensitivity (Q value) “follow” the beam during cooling Dynamic loading Variable Frequency (ca. 4 MHz at 410 MHz) S.Sanjari et. al. GSI SciRep 2017

Detector Pockets e.g. for b delayed neutron emission CR in RIB mode, x-width = sqrt(bx ex) CR TDR, Annex 1, 2016 pocket out during injection  fast drive with servo motor Dx = -72 mm for Z=50, m=132 Dx = -130 mm for Z=82, m=126 cooled beam (ex = 1 mm mrad)  x-width = 2.2 – 3.2 mm R. Gernhäuser

CsISiPHOS Heavy Ion Detector S/DSSD stack for DE, x active area 40mm x 60mm with CsI calorimeter + Si photo diode to identity Z and A by DE, E. Ali Najafi et al. NIM A836 (2016) 1. b+ decay: 142Pm60+  142Nd59+, electron capture 142Pm59+ position DE Mesytec amplifiers, Digital readout with FEBEX cards free running multi-event read out fast PCI to optical -> to MBS TRIXOR to create trigger.

Detector Positions ISO-K adaptor flange space for resonator or detector ISO-K flange adaptor A. Krasnov, BINP

TOF Detector System for CR d =80 mm MCP and carbon foil Isochronous electron transport by crossed E, B fields. ion yoke diameter 900mm magnet hom. DB/B = 10-3 Electron transport efficiency ≈ 98% Timing accuracy ≈ 35 ps Active area d=80mm wanted, accepted emittance (x * y) scales with d^4 ! Simulations + Tests for detector show even better timing than ESR detector M. Diwisch thesis, University Giessen 2014, N. Kuzminchuk et al., NIM B 821, 160 (2016), accepted TDR 2018.

ToF Detector Signals 400 ms 2 V U 238U beam on improved ToF detector in ESR, Oct 2014 old detector but new channel plates, new field settings, Almost no decrease of pulse height even after 800 turns.

ToF Detector Signals 2 t / ms 212.4 223.4 233.4 244.4 2.5 V U A good signal from every turn on both sides (blue and red), in the past only shorter sequences with gaps.

Installation in ring CR02EK3 Bellow CF200 CF400 Extension tube 153 CF200 CF400 Extension tube Bellow: 6 Convolutions, CR-standard thickness Chamber + Bellow 129,5 Installation in ring 255 1462

Decapole Corrector B(4)L = 80 Tm/m4 at best position With full correction Sextupoles, octupoles are foreseen, but also a 4th order corrector is needed. DB/B [10-4] from CR TDR-annex in GICOSY simulation B(4)L = 80 Tm/m4 at best position over one turn for Br = 13Tm, e.g. B = 0.02 T on r0 = 0.235 m, L = 0.5m (Y-steerers have larger B-field)

CR Arc from DMU from TDR annex

Power Supply Stability ~ DI/I Dm/m = correlation resolution Specs : DI / I = ±0.5x10- 5

Conclusion Scheme for integration of Heavy-ion detectors and Schottky pickups found. Also just enough space for ToF detectors. Heavy-ion and ToF TDR approved, Schottky still under approval, asked for German in-kind funding at FAIR Council (Nov 2018). 740 k€ German project money (2005 prices) + few other sources ToF detectors and some pockets can be provided at first installation, Schottky pickups probably not all -> dummy tubes needed. Still looking for decapole corrector, weak but very useful to increase acceptance. Find a position!