Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
1 Welcome Safety Regulatory Function Handbook April 2006.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Excel Functions. Part 1. Introduction 2 An Excel function is a formula or a procedure that is performed in the Visual Basic environment, outside the.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Software in Legacy Systems
Student & Work Study Employment Facts & Time Card Training
Break Time Remaining 10:00.
Chapter 5 – Enterprise Analysis
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
AEMCPAGE Relaunch 1 June 2009.
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
© 2005 KPMG IFRG Limited, a UK registered company, limited by guarantee, and a member firm of KPMG International, a Swiss cooperative. All rights reserved.
Audit Reports Chapter 3.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Doc.: IEEE tvws Submission September 2009 Stanislav Filin et al, NICTSlide 1 Comments to WS coexistence draft PAR Notice: This document.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
LACPA ISA Presentation
Mod 26_12 Notification Time for updating Interconnector Technical Data.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
1 Loss Adjustment When Exporting Mod 24_11 Reflection of Physical Fixity of Interconnector Flows in Operational Data Transactions hen Exporting Modifications.
MOD_17_12 Report on Offered Capacity in Implicit Auctions.
Select a time to count down from the clock above
Make Whole Payments Modification Proposals Modifications Committee Meeting 04 December 2014.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Modifications Committee Mod_18_10: Intra-Day Trading 25 November 2010.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
INTRA-DAY TRADING Modification Development 5 April 2011.
INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.
1 Mod_18_10 : Intra Day Trading in the SEM Working Group 4 August 19 th 2010 SEMO High-Level Impact Assessment.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Mod_02_13 Registration of Charges WG Update 03 April 2014.
* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Interim Suspension Delay Periods
Credit Cover Signage and Subscript Correction
Correction to No Load Cost - “and” vs “or”
Presentation transcript:

Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011

2 Mod_18_10_v2 provides the legal drafting for the SEM Intra-Day Trading (IDT) Provisions. The IDT provisions will apply from the IDT Start Date. Transitional Provisions are required to initiate variables and to allow a seamless transition to IDT. These Transitional Provisions will apply: prior to the IDT Start Date; or in respect of the Trading Periods of the IDT Start Date. The Transitional Provisions: must be implemented by the day prior to the IDT Start Date. have been reviewed by Participants, the Regulatory Authorities and were part of the Legal Review. Requirement for Transitional Provisions

3 The drafting includes provision for: Variables which need to be calculated prior to the IDT Start Date; Additional Interconnector Units (for those registered as Interconnector Users on the Moyle) that are required from the IDT Start Date; Credit Cover calculations for Participants with Interconnector Units which from the IDT Start Date (i.e. prior to the EA1 Gate Window Closure) must be based on traded exposure and not Undefined Exposure; Available Credit Cover sufficiency checks to be carried out from the EA1 Gate Window Closure on IDT Start Date; EA Gate Window (current) and EA1 Gate Window (IDT onwards) to be correctly aligned (i.e. 29 EA Gate Windows are open on the IDT Start Date); and WD1 MSP Software Run on IDT Start Date to be cancelled (i.e. The EA Market Schedule created prior to IDT Start Date). Transitional Provisions

4 11:00 Transitional Arrangements – IDT Start Date -1 IDT Start Date : to 9.13 – Calculate ECPI 21: – Offered Modified PQ Pairs for Interconnector Units = Accepted to 9.27 – Calculate Interconnector Unit Traded Exposure (all previous Trading Periods where Initial Settlement not completed) to 9.31 – Calculate Available Credit Cover (ready for ACC sufficiency checks from IDT Start Date) 9.6 – Trading Window for all runs for Trading Days prior to the IDT Start Date = entire Trading Day to 9.36 – Calculate Required Credit Cover using new IDT equations and issue new RCC reports. 17:00 (Pre-IDT Rules) Calculate Required Credit Cover and issue RCC reports. EA (Pre-IDT Rules) Determine Ex-Ante Indicative Schedule and SMPs for IDT Start Date Transition Start

5 08:00 11:30 09:30 Transitional Arrangements – IDT Start Date EA2 WD1 EA1 Trading Window Ending Overlap Optn Period 9.2 – Deemed registration of Interconnector Units for EA2/WD1 Gate Windows. 9.4/9.5 – No submission of COD/TOD for WD1/WD1 MSP Software Run cancelled EA1 9.3 – all Accepted COD/TOD is Accepted within the associated EA1 Gate Window IDT Start Date IDT Start IDT Start Date+1 EA2 Trading Window Ending Overlap Optn Period WD1 Start Overlap Optn Period WD1 Trading Window Ending Overlap Optn Period 06:00

6 The legal drafting and associated Plain English Document were reviewed by Participants and the Regulatory Authorities following WG10: All comments addressed by SEMO. The Transitional Provisions also formed part of the Legal Review: Legal Opinion: On the basis of the scope of work as described below, under the assumptions and subject to the qualifications and reservations set out in Schedule 1 hereto, and to any matters or documents not described to us, we are satisfied that the final form of the legal drafting for the Intra-Day Trading Modification proposal effectively and accurately reflects and implements the proposal. As opined at Section 1, we are satisfied that the final form of the legal drafting for the Intra Day Trading effectively and accurately reflects the proposal therefore, as set out in the PEDs. We also note that no material concerns were raised in the course of our review, which (as described above) was an iterative process in relation to a large number of drafting comments and not a negotiation in relation to net material aspects. Review of Transitional Provisions

7 Discussion and Vote