Page 1 ERCOT Project Status 1 ERCOT Dynamic Ratings METF March 29, 2012.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update March 4, 2010.
Advertisements

1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
Real-Time Transmission Congestion Management & Market Effects
ERCOT PUBLIC 7/14/ Long-Term Load Forecasting Calvin Opheim ERCOT Manager, Forecasting & Analysis LTSA Scenario Development Workshop July 14, 2015.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
2007 Planning Long-Term Hourly Demand and Energy Forecast Board of Directors Meeting May 16, 2007 Bill Bojorquez.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
Reports. Report Summary Warehouse Reports Returned Material Serial Numbers Not Found This report list the serial numbers of material returned which were.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
2016 Long-Term Load Forecast
Network Model Management System (NMMS)
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Information Technology Report Dave Pagliai Manager, IT Support Services October 2015 ERCOT Public.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
MISUG TAC Update Jackie Ashbaugh ERCOT 4/7/ TAC4/7/ /31/2011 Meeting Continued to focus on the high priority items from MISUG task list:
1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010.
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 02, 2007.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
1 Market Trials Update NATF May 4, 2010.
Scheduling and Operating Transmission Devices in the Nodal Environment.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
Operations Update ERCOT Board Meeting March 18, 2003.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Prof. Alfred J Bird, Ph.D., NBCT Office – McCormick 3rd floor 607 Office Hours – Monday 3:00 to 4:00 and.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
EDS 2 Early Delivery Systems Approach March 2007.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Market Trials Open Market Participant Call
Wind Management at MISO
Update on NPRR615 PVGR Forecasting
Using Weather Information to Improve Route
John Dumas Director, Wholesale Market Operations
Congestion Management and Ramp Rate for Delivering Ancillary Services
Multiplication table. x
Emergency Preparedness and Disaster Planning
Aim: How are weather maps created?
ERS Update Mark Patterson, ERCOT Demand Side Working Group
EE362G - Smart Grids: How Smart Are We Today
Aim: How are weather maps created?
Presentation transcript:

Page 1 ERCOT Project Status 1 ERCOT Dynamic Ratings METF March 29, 2012

Page 2 ERCOT Project Status Conceptual Model

Page 3 ERCOT Project Status Dynamic Ratings – Weather Stations and Zones

Page 4 ERCOT Project Status Dynamic Ratings Weather Stations to Zone Mapping

Page 5 ERCOT Project Status Dynamic Ratings – Real Time Process Ratings may be supplied via ICCP. Three ratings (normal, emergency, and 15 minute) must be submitted for each line. If ICCP data is not supplied or if ICCP is currently unavailable, ratings from a standard table mapped to temperatures are used. Updates are made in near real-time and applied to SCED For jointly-owned lines, the most conservative value will be used.

Page 6 ERCOT Project Status Dynamic Ratings Project – Look Ahead Process All lines have static temperature versus ratings tables defined by the owning TSP. All lines use the forecasted temperature of a nearby weather station (or weather zone temperature), as assigned by the TSP. ERCOT uses its 168hr weather station forecast data updated hourly by the weather vendor for both load forecasting and dynamic ratings. The resulting temperature-adjusted ratings are used for all RUC and manual future studies performed on the power system network. For jointly-owned lines or for lines that cross multiple weather stations, the most conservative value will be used.