Pilot Project Alternatives FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Operable Gates in Three Mile Slough Alt #1 Operable.

Slides:



Advertisements
Similar presentations
Denise Reed Pontchartrain Institute University of New Orleans
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Organic Carbon and Urban Sources - What Do We Know? Michael Zanoli Department of Water Resources, Division of Environmental Services, MWQI Program CBDA.
Ambient Water Toxicity in San Francisco Bay: Dr. Scott Ogle, Pacific EcoRisk Dr. Andrew Gunther, Applied Marine Sciences Paul Salop, David Bell,
Addition Facts
The Start of the rains at Moorings. Contents The data Annual values Examples of years Defining the start of the season Results omitting dry spells Adding.
ZMQS ZMQS
Climate.gov news article: The drought-busting benefits of atmospheric rivers Atmospheric rivers are the source of 30-50% of precipitation along the US.
Learning Objectives for Section 3.2
CCWD: Using DSM2 Historical July20, Two Applications of the DSM2 Historical Model: Modeling Contaminant Spills and Using Salinity Fingerprints to.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Studies in the Book of Nehemiah. The report (1:1-11) The request (2:1-10) The review (2:11-20) The repairs (3:1-32) Sheep gate (3:1-2) Fish gate (3:3-5)
Working with D-Flow Flexible Mesh in the San Francisco Estuary
U.S. Fish and Wildlife Service Cay Goude Ryan Olah Steve Detwiler Victoria Poage Derek Hilts U.S. Bureau of Reclamation Mike Chotkowski Lenny Grimaldo.
VOORBLAD.
PS-5 Test Review. Questions 1 & 2 Distance – 60m/ magnitude only Displacement 10 m east/ magnitude and direction.
COMPUTER B Y : L K. WINDOWS INFORMATION B Y : L K.
Edwards Aquifer Forecasts for 2014 Jim Winterle—EAA modeling supervisor HCP Stakeholder Committee May 28,
Upstream Boundary (Section V.1). 1. Delta boundary, daily inflow 2. Extend upstream channel by 45 miles, daily inflow 3. Hourly inflow at Freeport boundary.
Waller Creek Intake CFD Modeling and Simulation
Addition 1’s to 20.
Januar MDMDFSSMDMDFSSS
Week 1.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Atlantic Water temperature and climate in the Barents Sea in Vladimir Boitsov, Alexey Karsakov, Alexander Trofimov Polar Research Institute of.
Weekly Attendance by Class w/e 6 th September 2013.
SWRCB Modeling I Historical Modeling Tara Smith, Delta Modeling Section Department of Water Resources Tara Smith, Delta Modeling Section Department of.
. Achieving California’s Water Supply and Delta Ecological Improvement Simultaneously. Achieving California’s Water Supply and Delta Ecological Improvement.
F Sherman Island Sacramento River San Joaquin River God, United Methodists, Nature, and California Water.
Delta TRIM Hydrodynamic modeling in CASCaDE Nancy Monsen USGS/Menlo Park IEP Modeling Workshop Tuesday, May 26, 2009.
The little fish in California’s water supply: delta smelt “DRERIP” conceptual model overview Matt Nobriga and Bruce Herbold for National Academy of Sciences.
Urban Water Institute Conference August 22,
Delta Flows: Data and Calibrations Cathy Ruhl US Geological Survey California Water Science Center, Sacramento, CA.
Managing Water and Fish: The 2014 California Drought William Stelle, Jr. NOAA Fisheries West Coast Region Seattle, Washington May 2014.
Study for Fish Screens at Existing Delta Facilities Dr. Leah Orloff Water Resources Manager CUWA Board MeetingJuly 24, 2009.
Draft Recommendations of the San Joaquin Water Quality Management Group Plan for Achieving Salinity/Boron and DO Objectives Plan for Achieving Salinity/Boron.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
DSM2 Performance Measures Tara Smith CWEMF Annual Meeting February 26, 2007 Delta Modeling Section Bay Delta Office.
UNDERSTANDING THE DELTA - AN ENGINEERING PERSPECTIVE.
Project Status South Delta Improvements Program Project Status November 2003.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Changes to the 1995 Water Quality Control Plan Program of Implementation Presented by: Steve Ford Department of Water Resources.
DSM2 Analysis of Water Level and Water Quality in the South Delta Presented to California Water and Environmental Modeling Forum February 26, 2007 Fingerprinting.
SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources.
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
Economics and Inter-Disciplinary Research: California’s Delta Problems Richard Howitt AERO Conference, UC Davis October
Drought Management Sheri Looper CVP Water Resource Specialist.
Delta Cross Channel Gates. A “gate” formulation ——— Q =  A 3 √ 2g  h Matthai,H.F Measurement of peak discharge at width contractions by indirect.
CAMT, DOSS & DJFMP Triggers, Indices, and Objectives Decision Tree Diagrams.
South Delta Gates and Barriers Some Slides borrowed from Mark Holderman.
Model Description Sample Results Next Steps Monitoring Data (Initial Conditions) Hydrodynamics Water Quality USGS; DWR Monitoring Data (Initial Conditions)
Modeling Delta Flow-Turbidity Relationships with Artificial Neural Networks CWEMF Annual Meeting April 16, 2012 Paul Hutton, Ph.D., P.E.
Why We Need the California Water Fix
Presented by Jon Traum, P.E.
CWEMF Annual Meeting March 2005
Delta Water Conveyance — Water Project Operations and Risks
In-Delta Storage Program
Issue 4b - Addressing Local Degradation -
DSM2 Calibration: Optimization Weighting Scheme Using Management Objectives Marianne Guerin.
Open water area Franks Tract
A Few Model Calibration Ideas
Why We Need the California Water Fix
In-Delta Storage Program
Ajay Goyal Department of Water Resources August 9, 2007
Ajay Goyal Department of Water Resources August 9, 2007
Presentation transcript:

Pilot Project Alternatives FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Operable Gates in Three Mile Slough Alt #1 Operable Gates in Old River Operable Gates in Holland Cut Operable Gates in False River Operable Gates in Sand Mound Slough San Joaquin River Operable Gates in False River Alt #2 Alt #3 Alt #2 Alt #4 Three Mile Sl.

FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Alt #1 San Joaquin River Operable Gates in False River Three Mile Sl. Operation Scenarios Closed 20% Open Open/Close West False River Alternative

Base False River Restriction – 20% Open False River Gate – Open/Close Operation False River Gate – Closed Year Tidally Averaged EC SWP

Year Tidally Averaged EC CVP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Old River Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Rock Slough Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Victoria Canal Base False River Gate Three Mile Slough Gate

Year 2002 – 14-Day Average EC Sacrament Emmaton Base False River Gate Three Mile Slough Gate

West False River, Tidally Average EC, Sept 1, 2002 Base Open/Close Gate Closed 20% Open

Year Tidally Averaged EC SWP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CVP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Old River Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Victoria Canal Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Rock Slough Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC SWP Base False River Gate Three Mile Slough Gate The TMS Gate diversions were able to further reduce EC at the Clifton Court intake in December 2001, a time when SWP export flows were increased.

Year 2001 – 14-Day Average EC Sacrament Emmaton Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC SWP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CVP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Old River Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Victoria Canal Base False River Gate Three Mile Slough Gate

Year 1994 – 14-Day Average EC Sacrament Emmaton Base False River Gate Three Mile Slough Gate

Three Mile Slough Gate and West False River Gate 1992 Simulations West False River gate operation begins May 1, About the time when EC for the SJR near Jersey Point begins to rise above Franks Tract EC FRG operation ends Dec 7, 1992 when central Delta begins to be flushed with fresher water from the Mokelume system. (Dont want the gate to impede the flushing of the central Delta) TMS gate was not operated. There was not the opportunity to balance the Emmaton and Jersey Point flows (net flow for the SJR at Jersey Point most always greater than the net flow for the Sacrameto R. at Emmaton).

Three Mile Slough Gate and West False River Gate 1992 Simulations The West False River gate raises EC at Emmaton a slight amount. Historically the DCC was closed a few times in late May and early June 1992 to meet Emmaton standards. The DCC may require some additional closure with the FRG operation to maintain the Emmaton EC.

Year Tidally Averaged EC SWP Base False River Gate

Year Tidally Averaged EC CVP Base False River Gate

Year Tidally Averaged EC CCWD at Old River Base False River Gate

Year Tidally Averaged EC CCWD at Victoria Canal Base False River Gate

Year Tidally Averaged EC CCWD at Rock Slough Base False River Gate

Year 1992 – 14-Day Average EC Sacrament Emmaton Base False River Gate

Year Tidally Averaged EC SWP Base Three Mile Slough Gate – 1000 cfs diversion False River Gate – 20 % Open

FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Operable Gates in False River Operable Gates in Sand Mound Slough San Joaquin River Alt #2 Three Mile Sl. Operation Scenarios 1.Closed 2.False River Gate Open on Ebb Tide East Levee + 2 Gates Alternative

2002 Tidally Averaged EC SWP Base East Levee – Open on Ebb East Levee – Closed

BaseClosed Open on Ebb East Levee + 2 Gates, Tidally Average EC, Sept 1, 2002

FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Operable Gates in Old River Operable Gates in Holland Cut San Joaquin River Alt #3 Three Mile Sl. Operation Scenario 1.Closed 2.Open Gates on Holland Cut during Ebb Tides COX: Holland Cut + Old River Gate Alternative

2002 Tidally Averaged EC SWP Base Cox Alternative – Open on Ebb Cox Alternative – Closed

BaseClosed Open on Ebb COX, Tidally Average EC, Sept 1, 2002

Three Miles Slough Alternative FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Operable Gates in Three Mile Slough San Joaquin River Three Mile Sl. Operation: Close during Portion of Ebb Tide

Three Mile Slough Gate Variable Diversion for 2002 (daily average diversion in cfs from Sacramento to San-Joaquin) June1500 July3000 August3000 September September October October November November December December

Three Mile Slough Gate Closure CLOSED OPEN CLOSED OPEN CLOSED OPEN hrs

Base False River Gate Three Mile Slough Gate One Gate Open DCC Operation One Gate Open 2002 Tidally Averaged EC SWP Period of Operation Both Gates Open

Year Tidally Averaged EC CVP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Old River Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Rock Slough Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Victoria Canal Base False River Gate Three Mile Slough Gate

Year 2002 – 14-Day Average EC Sacrament Emmaton Base False River Gate Three Mile Slough Gate

Three Mile Slough Gate Tidally Average EC Sept 1, 2002 Base Three Mile Slough Gate

Three Mile Slough Gate Variable Diversion for 2001 (daily average diversion from Sacramento to San-Joaquin)

Year Tidally Averaged EC SWP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CVP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Old River Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Victoria Canal Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Rock Slough Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC SWP Base False River Gate Three Mile Slough Gate The TMS Gate diversions were able to further reduce EC at the Clifton Court intake in December 2001, a time when SWP export flows were increased.

Year 2001 – 14-Day Average EC Sacrament Emmaton Base False River Gate Three Mile Slough Gate

Three Mile Slough Gate Variable Diversion for 1994 (daily average diversion from Sacramento to San-Joaquin)

Year Tidally Averaged EC SWP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CVP Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Old River Base False River Gate Three Mile Slough Gate

Year Tidally Averaged EC CCWD at Victoria Canal Base False River Gate Three Mile Slough Gate

Year 1994 – 14-Day Average EC Sacrament Emmaton Base False River Gate Three Mile Slough Gate

Year 1991 (Critical)-Tidally Averaged EC, SWP Base Three Mile Slough Gate – 1000 cfs diversion False River Gate – 20 % Open

Operate Three Mile Slough Gate in Lieu of Delta Cross Channel Gates

DCC Closed Three Mile Slough Gate Diversion for 2002 (daily average diversion from Sacramento to San-Joaquin)

Year Tidally Averaged EC SWP Base DCC Closed TMS Gate and DCC Closed

Year Tidally Averaged EC CVP Base DCC Closed TMS Gate and DCC Closed

Year Tidally Averaged EC Old River at Bacon Island Base DCC Closed TMS Gate and DCC Closed

Year Tidally Averaged EC CCWD at Old River Base DCC Closed TMS Gate and DCC Closed

Year Tidally Averaged EC CCWD at Victoria Canal Base DCC Closed TMS Gate and DCC Closed

Year Tidally Averaged EC CCWD at Rock Slough Base DCC Closed TMS Gate and DCC Closed

Preliminary Result Water Quality Benefits during drought

Three Mile Gate During Drought Period Base-OCAP 3 Mile Gate Operated