Course Contents Preliminary estimates Detailed estimating

Slides:



Advertisements
Similar presentations
Software for Quantity estimation and Project management.
Advertisements

1 TS&L Expectations What is included in a TS&L?. 2 TS&L Expectations Per BDDM – The end product of a TS&L design includes: TS&L Plan and Elevation.
VERSION 7 Examples of the stylish new design VERSION 7 Examples of the stylish new design 5 th December 2010 © Copyright Benchmark Estimating 2010.
Cost Estimation System Tool
Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
Project Engineering & Construction Management Solution Project Access BOQ Component 1 Model WBS BudgetSchedule PlanRequisition AdministerProcure StockVendor.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Measuring Masonry Work
Monday, April 2, 2012MAT 121. Monday, April 2, 2012MAT 121.
DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder ET 493- Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.
Project Management Requirements
CE Estimation & Quantity Surveying Prepared by Prof. S.L. DAVID ANANDARAJ.
Specification & Quantities Estimating
Offsite Detour analysis. Calculation of detour length Distance along SR = Distance along SR
Essex County Transportation Services Department Essex County Highways 2012 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
Problem -1(Material) S. V. Ltd., manufactures by mixing three raw materials. For every batch of 100 kg of BXE, 125 kg of raw materials are used. In April.
HB Koh, 20 February 2012 BFC Integrated Design Project (IDP) Faculty of Civil and Environmental Engineering Semester 1, Session 2013/2014.
 GDP 1990 = Output 1990  Prices 1990 = $5,546.1 billion  GDP 1994 = Output 1994  Prices 1994 = $6,736.9 billion This appears to be a very substantial.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Job Seeking Skills Identify jobs and job ethics associated with architectural drafting.
INTEGRATED DESIGN SYSTEM  AUTOCAD  STAAD  STR. DESIGN SYSTEM  MICRO SOFT EXCEL.
There are 2 Types of Bridge Inspectors – Class B and Class A.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Zoo IC Phase II – WTBA Staging December 16, 2014.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
INTEGRATED DESIGN PROJECT BFC 43303
Dr. Mohamed Riyazh Khan DoMS
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
The Nigerian Institute of Quantity Surveyors PRICING TENDER DOCUMENT BASED ON BESMM4 By Dr. GANIYU AMUDA YUSUF (FNIQS, RQS) Department of Quantity Surveying.
PRESENTATION ON ESTIMATE BY GROUP-II. ESTIMATE (GROUP -II) CC ROAD & BUILDINGS Sl. No. Name of the OfficialsDesiganationDistrictBlockPhone No ID.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
1 Cost Variance Rules  Explanations should use words that clearly indicate the reported category  Changes due to different change categories should not.
Arranging Bugdget Plan of Construction Cost (RAB) Calculating construction RAB of House Building, water building and Bridge By: SMK NEGERI 5 SURAKARTA.
5 – Systems of Inequalities (No Calculator)
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
The Open Road A vehicle can be a symbol of freedom, but it requires responsibility. What responsibilities come along with owning and operating a vehicle?
Construction Activity
Site Grading of Terrace
ESTIMATION AND COSTING
Slope.
office product key|
Item 21: Purchasing Power Parities
Unemployment and Its Natural Rate
Chapter 7 Signing Plan Sets
Unemployment and Its Natural Rate
Course Contents Culverts Bridges Buildings 20 November 2018.
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
ARMT Item Specifications
Unemployment and Its Natural Rate
NAME 217: Theoretical Ship Design
ITEM 5 – ACTIVITY CODING LIST
Quality-Adjusted Labour Input
Quantities and Price.
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Unit 3 Review (Calculator)
Unless provided in the caption above, the following copyright applies to the content of this slide: Published by Oxford University Press on behalf of the.
West Point Bridge Designer
ARMT Item Specifications
Unless provided in the caption above, the following copyright applies to the content of this slide: Published by Oxford University Press on behalf of the.
Student Experience Survey 2016 Preliminary Analysis
ARMT Item Specifications
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
ARMT Item Specifications
ARMT Item Specifications
ARMT Item Specifications
Action/Solution Poster
For More Details:
Siebel 1C Field Tech Repair.
Presentation transcript:

Course Contents Preliminary estimates Detailed estimating Culverts Bridges Buildings Roads Analysis of rates 30 April 2019

Preliminary Estimates PAE Currently FAE CCE RF LS 30 April 2019

Detailed Estimating Buildings Culverts Bridges Roads Earthworks Up to plinth level Above plinth level Culverts Bridges Roads Earthworks 30 April 2019

Analysis of Rates Total workdone Material and labour requirements Estimated cost Actual PAE or CCE or RFT 30 April 2019

Estimating Drawings Specifications Required items Detailed measurements Content Time 30 April 2019

Estimating Complete items Quantity Measurements Content calculation Rates 30 April 2019

Second Term Buildings Culverts Analysis of rates Above plinth level 30 April 2019