Course Contents Preliminary estimates Detailed estimating Culverts Bridges Buildings Roads Analysis of rates 30 April 2019
Preliminary Estimates PAE Currently FAE CCE RF LS 30 April 2019
Detailed Estimating Buildings Culverts Bridges Roads Earthworks Up to plinth level Above plinth level Culverts Bridges Roads Earthworks 30 April 2019
Analysis of Rates Total workdone Material and labour requirements Estimated cost Actual PAE or CCE or RFT 30 April 2019
Estimating Drawings Specifications Required items Detailed measurements Content Time 30 April 2019
Estimating Complete items Quantity Measurements Content calculation Rates 30 April 2019
Second Term Buildings Culverts Analysis of rates Above plinth level 30 April 2019