THE STATE OF BEAM DIAGNOSTICS

Slides:



Advertisements
Similar presentations
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Advertisements

Ribbon Electron Beam Profile Monitor For Bunched Beam Tomography Muons, Inc. Innovation in research.
Requirements Structure and Status for NCFE
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
Alexander Aleksandrov Oak Ridge National Laboratory
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011.
Accelerator Project organization
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ESS Front End diagnostic
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
European Spallation Source Diagnostics Challenges Lali Tchelidze AD retreat, Lund, Sweden,
Study on IFMIF Beam-Target Interface
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
WP5 Elliptical cavities
Overview and System Design for ESS LLRF Systems
WP11: electron and proton beam testing
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Tom Shea Front End Meeting Catania
European Spallation Source
Olivier Napoly, coordinator CEA/Irfu
The European Spallation Source
The European Spallation Source
ESS Project Status Roland Garoby – Technical Director August 2018.
Beam Commissioning at ESS
Peo Gustavsson/Mats Lindroos IK Manger/Acc proj manger
Testing and deployment
Plan for controls with the digital platform
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Ion Source and LEBT control system topology, Interlock strategy
Risk, Schedule, Deliveries
ISRC and LEBT Vacuum System Design
Introduction CDR Normal Conducting Linac LLRF
A few commissioning experiences from a few hadron facilities (SNS, RHIC, AGS Booster, LANL PSR) Thomas Shea ESS.
Testing Coordination at ESS
MEBT FC, WS, SC and EMU Status
MPS commissioning at ESS
Towards final BCM firmware and interface to MPS Hooman Hassanzadegan BI forum, Nov 2018, Lund
PSS Verification and validation
Tom Shea, Andreas Jansson, Cyrille Thomas
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
European Spallation Source ERIC
BSM S. Grishin (installation manager),
APTM and GRID Beamline Elements
Beam Commissioning Planning
Accelerator NCFE Liaison Officer
Status of the ESS High Power RF Systems
Plan for early Operation
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
Accelerator Installation Schedule
SAR MEBT Bilbao March Mats Lindroos
ACCSYS Collaboration Board Triestre, 3rd october 2017
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Project Support Meeting January 9, 2019
IKC in operations and potentials for co-creation
Presentation transcript:

THE STATE OF BEAM DIAGNOSTICS Tom Shea for the ESS Beam Diagnostics Team

Accelerator Partner Institutions In-kind (main contributions) ATOMKI (RF-LPS) CEA (RFQ, SRF, Diagn) CNRS (SRF, Cryogenics) Cockcroft Inst (Diagn) Daresbury Lab (SRF, Vacuum) Elettra (RF, Magnets, PS, Diagn) ESS-Bilbao (MEBT, RF) Huddersfield Univ (RF distrib) IFJ PAN (Installations, test stand) INFN Catania (Source, LEBT) INFN Legnaro (DTL) INFN Milan (SRF) Lodz UT (LLRF) NCBJ (LLRF, gamma blockers) Tallinn UT (RF) Univ Bergen (Seconded staff) Univ Oslo (Diagn) Warsaw UT (LLRF) Wroclaw UT (Cryogenics) IK signed IK endorsed Collaboration agreement signed Collaboration agreements Aarhus Univ (Beam delivery, diagn) DESY (Diagn) Lund Univ (LLRF, RF) Uppsala Univ (Test stand) University West (Diagn) M. Lindroos, H. Danared Oct 2018

ESS Diagnostics: 22 Partners and Collaborators Aarhus University CEA Saclay, Paris CERN, Geneva Cockcroft Institute, Daresbury DESY, Hamburg Elettra – Sincrotrone Trieste ESS Bilbao INFN, Catania INFN, Legnaro Lund University University of Oslo Technical University of Denmark Science and Technology Facilities Council, Daresbury Warsaw University of Technology IMP, China J-PARC, Japan Oak Ridge National Laboratory Los Alamos National Laboratory INR, Moscow Högskola Väst, Trollhättan Stony Brook U., New York BNL, New York Tom Shea 2018-06-13, SLHiPP, Uppsala

In Lund – continuing to assemble the team I’m second from the left… and a bit jet-lagged…

System Leads System System Lead Aperture Monitor(fixed and moveable) Cyrille Thomas BCM (BCM, fast BCM, IS supply current) Hooman Hassanzadegan BLM (nBLM, ICBLM, X-Ray spectroscopy) Irena Dolenc Kittelmann BPM (BPM, fast BPM) Doppler EMU (Alison, slit-grid) Clement Derrez FC Elena Donegani Imaging Insertable Beam Stops LBM (BSM) NPM (IPM, BIF) Scraper(MEBT) Target Grid WS(scanning, fast) https://confluence.esss.lu.se/display/BIG/Organization+of+Beam+Diagnostics

Technical Leads Technical Area Responsible Cabling Edvard Bergman Commissioning (LEBT) Cyrille Thomas Data Management Johan Norin Electronics Clement Derrez, Hooman Hassanzadegan FPGA, digital architecture Kaj Rosengren Installation Manager Viatcheslav Grishin Laboratory Manager Mechanical Thomas Grandsaert Motion Control Clement Derrez Project Planning Protection Irena Dolenc Kittelmann, Thomas Grandsaert Radiation effects Irena Dolenc Kittelmann ,Elena Donegani Software, EPICS integration Hinko Kocevar Verification https://confluence.esss.lu.se/display/BIG/Organization+of+Beam+Diagnostics

New arrivals in Lund Maria Hoflund, student intern with Cyrille NPM (BIF) camera studies over the summer Elena Donegani, post-doc, is now System Lead for: Faraday Cups: LEBT, MEBT (Bilbao IK), and DTL. Includes local shielding and activation analysis. Insertable Beam Stops: Spoke and Medium Beta. Also includes local shielding and activation analysis. Kaj Rosengren, engineer, responsible for digital architecture and FPGA design: Assess state of digital platform for nBLM and icBLM Launch Data-on-Demand project – representing diagnostics and LLRF, and working with ICS and other stakeholders. Determine FPGA roadmap – Near and long-term strategies. Roxana Tarkeshian has accepted the Diagnostics Scientist position Starts in January Initial focus areas: ion source diagnostics, EMU, IPM

We are transitioning to the commissioning phase In papers that report on accelerator commissioning – Percentage of figures that include data from diagnostics: Spot check of papers from other facilities: approaching 100%. Most compare beam dynamics predictions to diagnostics’ measurements

First proton beam on the ESS site Charge per pulse vs. time of day measured by Beam Current Monitor

The Big Picture – paced by commissioning Beam on Dump (BOD) ISrc to DTL1 Accelerator Ready for Beam on Target (RBOT) ISrc to LEBT ISrc to DTL4 End of Construction Beam on Target (BOT) 2018 2019 2020 2021 2022 2023 2024 2025 Deploy about half of the diagnostic system types Start Of User Program (SOUP) Design and deploy the other half of diagnostic system types Update some systems based upon commissioning experience Develop deferred systems (advanced detectors, non-invasive techniques, halo techniques, target…) Developments, data analysis, machine studies, etc with goal of achieving full neutron source performance (collaboration with accelerator, target, neutron science)

Comparison ESS SNS In the past, ESS appeared too compressed. To target DTL5 + Spokes + Medium Beta Source/LEBT at Catania RFQ/MEBT/DTL1 Source/ LEBT DTL 2-4 ESS 2017 2018 2019 2020 2021 2022 SNS 2002 2003 2004 2005 2006 1 2 3 4 5 6 7 8 9 MEBT DTL 1 improve Elliptical improve Deployment at scale: superconducting linac devices In the past, ESS appeared too compressed. Now, I think that it looks achievable and similar to RHIC and SNS.

Focus Areas for 2019 Deploy normal-conducting linac diagnostic systems Wrap up most prototype testing and remaining design reviews Project management Biggest issue: Projected budget gap of 2 to 5% Soliciting ideas for cost savings/deferral Technical V 1.0 firmware and software architecture Data on demand Timing integration MPS integration Low latency link

thanks