CEOS WGCV (IVOS) potential interactions with GSICS

Slides:



Advertisements
Similar presentations
GSICS Partnerships: CEOS WGCV IVOS, X-CAL, GRUAN
Advertisements

GRWG Report Tim Hewison 1 November Outline Status Updates – For Information only –GEO-LEO IR –GEO Solar –Lunar –Archive Re-Calibration Products.
Extract from Hot summary of the Fourth GSICS Users Workshop Fred Wu, Sebastien Wagner, Jerome Lafeuille Sopot, Poland, 4 September 2012.
WGCV issues for SIT decision/information Satish Srivastava (CSA), WGCV Chair Albrecht von Bargen (DLR), WGCV Vice-Chair Eric Arsenault (CSA), WGCV Secretariat.
Overview of progress towards a data quality assurance strategy to facilitate interoperability WGISS – May 11 th, 2009.
September, 2008 TASK DA Data Quality Assurance Strategy GEO Task DA-06-02: “This task is led by CEOS and IEEE” GOAL: “Develop a GEO data quality.
QA4EO in 10 Minutes! A presentation to the 10 th GHRSST Science Team Meeting.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
1.Bob Iacovazzi (NOAA) - Road to Pre-operational Phase Presentation 2.All – Discussion & Feedback 3.Tim Hewison (EUMETSAT) – Reminders: Korea, Conference,
Beyond the workshop: Developing inter-calibration products based on Lunar Observations Tim Hewison (EUMETSAT) [GSICS Research Working Group Chair] Special.
Thomas C. Stone U.S. Geological Survey, Flagstaff, AZ USA GSICS Research Working Group Meeting EUMETSAT 24−28 March 2014 Using the Moon as a Radiometric.
Marianne König, Tim Hewison, Peter Miu
GSICS MW products and a path forward.?
Summary Outcome of the First GSICS Users’ Workshop
Future directions of CEOS WGCV: Incoming chair perspective
Introducing Me, GSICS, and the UV Sub-Group
Manik Bali, Aleksandar Jelenak
GSICS Coordination Center (GCC) Report
Lunar Calibration Workshop Activities
Representing GSICS in other fora: CEOS WGCV & X-CAL
Introduction to the Global Space-based InterCalibration System
Workshop on best practices on pre-flight and onboard calibration
The ROLO Lunar Calibration System Description and Current Status
Microwave Sub-Group Updates
Lunar Calibration activities
Introduction of the SCIAMACHY SBAF web tool
Albrecht von Bargen, Chair CEOS WGCV DLR Agenda Item # 6 GSICS-EP 17
Update on Advancing Development of the ROLO Lunar Calibration System
Future Developments of the Lunar Calibration System
Introduction to Mini Conference & GSICS
Jo Schmetz1 on behalf of Tim Hewison1 EUMETSAT
Closing the GEO-ring Tim Hewison
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
WGCV Overview K. Thome WGISS#45 / WGCV#43
GSICS/WGCV Linkages K. Thome NASA WGCV Plenary # 44
WGCV Report Albrecht von Bargen (DLR) Kurt Thome (NASA)
Sébastien Wagner (EUMETSAT) Tom Stone (USGS)
Building-in a Validation cycle for GSICS Products
Action Item Status / CEOS Work Plan Status
Status of MODIS and VIIRS Reflective Solar Calibration
2b. GSICS Coordination Centre (GCC)
WGCV-GSICS interactions
WGCV Chair’s Report K. Thome NASA/GSFC WGCV 42
GSICS Collaboration with SCOPE-CM IOGEO
Proposal of SI-traceable IR and VIS Hyperspetral reference Workshop by GSICS/IVOS Scott NSMC/CMA.
GSICS LEO-LEO IR Sentinel-3/SLSTR-IASI Products
Data policy, data usage and dataset update
Summary 2017 GRWG+GDWG meeting Tim Hewison
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 01 January 2019 Report of GRWG: Aims of meeting Review of Actions Proposal.
Recent activities of OCR-VC
Closure of WGCV actions (CV-01; CV-09; CV-13; CV-16)
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 17 January 2019 GSICS Research Working Group Web Meeting Planning.
Working Group on Cal/Val Update
WGCV Work Plan Actions K. Thome NASA WGCV Plenary # 44
Technical aspects of the GIRO work: inputs from GRWG
IR hyperspectral comparisons
Lunar Calibration Workshop Wrap up, next steps and list of actions
GSICS Research Working Group Web Meeting :00-13:00 UTC Reference Instruments and their Traceability.
GSICS Coordination Center (GCC) Report
RadCalNet/Landnet process for adding new sites
Hot summary of the Fourth GSICS Users Workshop
Inter-band calibration using the Moon
Head of Earth Observation, Climate and Optical
Formation of IR Sub-Group and Reference Selection
Discussion on Solar Spectra for Vis/NIR Calibrations
Communication with WGCV/ MWSG
WGCV IVOS Reference Solar Irradiance Spectrum
7h: User Interaction & 2016 Users’ Workshop
WG Calibration and Validation
Lunar Calibration Workshop Activities
Presentation transcript:

CEOS WGCV (IVOS) potential interactions with GSICS Deserts (PICS) methods for cross- comparisons (Vis and IR) Moon as a calibration reference - improved models and useage LEO – LEO cross-calibration methods in general Cross-comparison tools and databases and results Pre-flight calibration workshop Use of atmospheric hyperspectral imagers for band to band correction Reference solar Irradiance spectrum and methods to convolve with instrument bands IVOS to make more visible its activities through GSICS newsletters Request for examples of Cal/Val best practise following QA4EO principles to serve as case studies Http:www.QA4EO.org Efforts to establish SI Traceable Climate and calibration sat in space Many overlaps of personnel perhaps some joint co-located meetings Assume that surface measured test-sites and associated in-situ / cross comparisons is of supporting interest to GSICS Contribution to survey on Cal/val methods: activities/priorities