Roof PSS Bunker Project CDR

Slides:



Advertisements
Similar presentations
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Advertisements

The Stephanie Country Mansion Dollhouse Assembly Instruction
Refractory Repair Strategies for Battery Life Extension
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Cosmic Induced Backgrounds D. Reyna Argonne National Lab.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
The Ariel Assembly Instruction By Laser Dollhouse Designs.
The Jasmine Gothic Victorian Dollhouse Assembly Instruction
Basic Building Techniques. Connecting Bricks Bricks can be connected in a variety of ways. We will look at 3 ways here: – stacked – overlapping – staggered.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Basic Building Techniques. Exploration Time Use the next 15 minutes to build. After the 15 minutes are up, everything will need to be broken apart and.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
The problem is we have new land that needs to get buildings on it.
Presented To You By BELT MAINTENANCE GROUP The Project THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR.
MNM Fatal Fall of Person Fall of Person February 21, 2014 (Kentucky) February 21, 2014 (Kentucky) Cement Operation Cement Operation Contract Laborer.
Homes. What is this type of home called? A bungalow. A bungalow has one floor. It does not have any stairs.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
Brick Wall Homework Overview Brick wall Two types of row Big Brick Row Alternate Brick Row.
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Pipe Clips.
University of Houston Passage measurements and ½ inch width 79 and ½ inch height Elevator cabin measures 56 ½ x 79 ½ inches.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
Introduction to Structures & Mechanisms
Multiplication Grids Multiplying a 2 digit number by a 1 digit number.
Technological World Linking.
The Abriana Assembly Instruction By Laser Dollhouse Designs
Multiplication Grids Multiplying a 2 digit number by a 1 digit number.
Homes.
The Garage Assembly Instruction By Laser Dollhouse Designs
Puzzle Cube Project.
Safety by Design & Engineering – Florida Footbridge
TOP WORKER COMPLAINTS ABOUT SAFETY PROGRAMS\
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
Operations, Risks & Hazards
Rock Fall Protection At Mayo A Powerhouse with Yukon Energy
The Bunker Project Overview Zvonko Lazic
Roof design Bunker Project CDR
Rad safety and activation
Instruments Shielding Project Installation
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
IKON 15 Talal Osman & Iain Sutton
Preliminary Hazard Analysis of Bunker
Neutron guide Shielding Concept
Bunker Wall Design Wall
Bunker -Target interfaces
Bunker Project Schedule/Budget
Neutronics questions from the PDR
Bunker Wall Design Wall ESS
Instruments – Bunker Wall interfaces
Rack Placement Chopper Workshop
Bunker Project Operation aspects
Bunker Project Schedule/Budget
Technical Documentation Coordinator
The Bunker Project Overview Zvonko Lazic
Bunker Project Integration/Interfaces
Test Beamline System Requirements and Charge to PDR Committee
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
Dawid Patrzalek Mechanical Design Engineer
Shielding requirements for the baseline bunker shielding (current CATIA version ) Günter Muhrer
Bunker Project Interfaces introduction
Overview of the TARGET Monolith Rough Vacuum
Polarized 3He target installation
Presentation transcript:

Roof PSS Bunker Project CDR Dawid Patrzalek Mechanical Design Engineer www.europeanspallationsource.se 21 April, 2019

Personal Safety System – design overview PSS requirements: Prevent unauthorized access into the bunker Minimize number of interlocks used

Personal Safety System – a fence In order to prevent unauthorized access onto the bunker roof, a fence and lockable stairs will be installed. Presented fence design is preliminary, and the final design will be provided together with access stair cases.

Personal Safety System – interlock design overview The interlock design uses steel lines, which go from the Monolith skirt shield wall, through the blocks in the top level, up to the interlocks which are placed on the outer blocks row of the roof.

Personal Safety System – interlock design overview

Questions and ideas Any questions or ideas?