China MM-Wave (CMMW) Study Group March 2012 Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Advertisements

Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /1474r0 Submission Nov 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group November 2013 Closing Report.
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
Doc.: IEEE /0121r2 Submission January 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group January.
July 2012 Plenary Motions Date: Authors: July 2012
China MM-Wave (CMMW) Study Group Comments on aj PAR & 5C
VHT SG Report to EC Date: Authors: November 2008 April 2007
China MM-Wave (CMMW) Study Group IEEE aj Sept Meeting Logistic
CWPAN Response to IEEE China MM-Wave (CMMW) Study Group
China MM-Wave (CMMW) Study Group May 2012 Closing Report
NG60 SG March 2015 Agenda Date: Authors: March 2015
CWPAN Response to IEEE China MM-Wave (CMMW) Study Group
IEEE aj Process Overview
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
TGad March 2010 Closing Report
TGad September 2010 Closing Report
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
Proposed Modifications to VHT60 PAR
VHT SG September 2008 Closing Report
China MM-Wave (CMMW) Study Group - Introduction of CMMW PAR and 5C
TGad July 2009 Closing Report
TGaf Waikoloa Closing Report
March Liaison Report Date: Authors: March 2008
TGad September 2009 Closing Report
May Liaison Report Date: Authors: May 2009
VHT SG September 2007 Closing Report
TGad November 2009 Closing Report
TGad January 2010 Closing Report
November 2011 WG11 Motions for the EC
ISD SG Closing Report Date: Authors: July 2012 July 2012
Light Communications Study Group March 2018 Closing Report
Jan 2010 Closing Plenary Motions
IEEE aj Process Overview
VHT SG July 2008 Closing Report
Proposed Modifications to VHT60 PAR
TGad March 2009 Closing Report
IEEE aj Process Overview
TGad July 2010 Editor Report
China MM-Wave (CMMW) Study Group May 2012 Report
TGad May 2009 Closing Report
May Liaison Report Date: Authors: May 2009
July 2010 Closing Plenary Motions
July 2010 Closing Plenary Motions
Proposed Modifications to VHT60 PAR
Proposed Modifications to VHT60 PAR
July 2010 Closing Plenary Motions
ISD SG Closing Report Date: Authors: July 2012 July 2012
July 2010 Closing Plenary Motions
VHT SG November 2008 Closing Report
China MM-Wave (CMMW) Study Group January 2012 Report
TGad March 2011 Closing Report
VHT SG January 2008 Closing Report
China MM-Wave (CMMW) Study Group March 2012 Report
Proposed Modifications to VHT60 PAR
TGad May 2011 Closing Report
China WPAN mmWave Liaison w/
Nov 2011 Closing Plenary Motions
IEEE MEDIA INDEPENDENT HANDOVER
November 2010, Motions for the EC
China MM-Wave (CMMW) Study Group January 2012 Report
VHT SG March 2008 Closing Report
DLS SG Closing Report Date: Authors: March 2007 Month Year
TGad January 2009 Closing Report
TGp Motions for Tuesday
Simulation Scenario Floor Plans
TGax September 2017 Closing Report
China MM-Wave (CMMW) Study Group July 2012 Report
May 2008 Closing Plenary Motions
Presentation transcript:

China MM-Wave (CMMW) Study Group March 2012 Closing Report April 2007 doc.: IEEE 802.11-07/0570r0 March 2012 China MM-Wave (CMMW) Study Group March 2012 Closing Report Date: 2012-03-16 Authors: Eldad Perahia, Xiaoming Peng Eldad Perahia, Intel Corporation

Eldad Perahia, Xiaoming Peng March 2012 Abstract This document is the closing report for CMMW SG for the March 2012 session. Eldad Perahia, Xiaoming Peng

Eldad Perahia, Xiaoming Peng March 2012 Work Completed (1/3) Overview of CWPAN SG5 QLINKPAN (40-50 GHz) https://mentor.ieee.org/802.11/dcn/12/11-12-0402-01-cmmw-overview-of-cwpan-sg5-qlinkpan.ppt Request more information from CWPAN SG5 on what info is needed on details of 11ad to better define “802.11ad MAC + Modification”? Would CWPAN SG5 like a tutorial on 11ad? If so, what level of detail? Eldad Perahia, Xiaoming Peng

Eldad Perahia, Xiaoming Peng March 2012 Work Completed (2/3) Feedback from CWPAN https://mentor.ieee.org/802.11/dcn/12/11-12-0398-03-cmmw-cwpan-response-to-802-11-cmmw.ppt Chose dates for 2013 CMMW TG interim meetings PAR development discussion Reviewed https://mentor.ieee.org/802.11/dcn/12/11-12-0140-01-cmmw-ieee-802-11-cmmw-sg-par.doc Requested more information from CWPAN regarding MAC modifications Request information from Regulatory SC on 40-50GHz rules in other regulatory domains Eldad Perahia, Xiaoming Peng

Eldad Perahia, Xiaoming Peng March 2012 Work Completed (3/3) 5C development discussion Reviewed https://mentor.ieee.org/802.11/dcn/12/11-12-0141-01-cmmw-ieee-802-11-cmww-sg-5c.doc Task group logistic discussion https://mentor.ieee.org/802.11/dcn/12/11-12-0443-00-cmmw-cmmw-logistics-options.pptx Attaining/Retaining voting rights & voting on drafts Voting during Asia CMMW TG meeting Eldad Perahia, Xiaoming Peng

Eldad Perahia, Xiaoming Peng March 2012 Goals for May Review CWPAN response to questions Develop Task Group guidelines Develop PAR and 5 Criteria Eldad Perahia, Xiaoming Peng

Eldad Perahia, Xiaoming Peng March 2012 Conference call times Thursdays 19:00-20:00 ET April 19, 26, May 3 Eldad Perahia, Xiaoming Peng

Study group extension motion March 2012 Study group extension motion Request the IEEE 802 LMSC to extend the 802.11 China Millimeter Wave Study Group.   Moved by Xiaoming Peng on behalf of CMMW SG [CMMW SG vote: Moved: Xiaoming Peng, Seconded: Andrew Myles, Result: 13-0-1] Eldad Perahia, Xiaoming Peng