Prioritizing Watershed Protection in King County

Slides:



Advertisements
Similar presentations
1 Briefing for WRIA 8 – Lake Washington/Cedar/Sammamish Watershed July 17, 2008.
Advertisements

An Overview of the 2007 WRIA 8 Implementation Survey Presented to the WRIA 8 Salmon Recovery Council January 17, 2007.
WRIA 8 Salmon Recovery Council 2007 SRFB & PSAR Grants Project Subcommittee Report & Recommendations July 19, 2007.
S trategic S ubwatershed I dentification P rocess Illinois Department of Natural Resources Conservation 2000 Ecosystems Program.
What We Heard at the November 2011 Community Workshops.
Process – Resource Evaluation Design and perform a set of geographically based resource assessments Develop a methodology for prioritizing land according.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Washington State Department of Commerce Transfer of Development Rights: A Regional Approach June 2012.
Joey Wisby GIS Manager Tennessee Chapter of The Nature Conservancy.
Using the Open Standards to Advance Puget Sound Recovery Kari Stiles, PhD Puget Sound Partnership Conservation Measures Partnership Oct 7-9, 2014.
WOODSHED ANALYSIS Mad River Valley Towns Analysis by Marc Lapin, Chris Rodgers, & David Brynn Winter/Spring 2009.
Grand Ridge – Canyon Creek Acquisition RCO # – Urban Wildlife July 2008.
By: Carrie Turner Prepared for: New Jersey Association of Environmental Authorities Annual Conference March 12, 2013 Watershed Management Planning Provides.
Capitol Hill Oceans Week Wetlands Restoration Panel June 8, 2005 JOHN H. DUNNIGAN Ecosystem Goal Lead Capitol Hill Oceans Week June 8, 2005.
Stormwater Target Watersheds: Methods and Maps February In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.
2 A J B F 5 6 E 8 C G 10 4 I 26 H D N Legend Source drains into the ditch here. Data point directly.
Setting long-range goals for Minnesota’s water resources Minnesota’s Clean Water Roadmap.
Potential Project Evaluation and Prioritization Indian and Howard’s Creeks Local Watershed Plan April 23, 2009.
Incorporating Climate Change Adaptation in EPA Region 10 Programs: An example based on a newly initiated pilot in the Office of Water and Watershed’s Total.
Green- Duwamish River Watershed
Jeremy Erickson, Lucinda B. Johnson, Terry Brown, Valerie Brady, Natural Resources Research Institute, University of MN Duluth.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Center for Watershed Protection USDA Forest Service, Northeastern Area, State and Private Forestry How to estimate future forest cover in a watershed.
Todd Ambs Water Division Administrator, WDNR October 26, 2009 Sustaining the Water Belt of North America.
Prioritizing Agricultural Lands for Riparian Buffer Placement in the Raritan Basin: A Geographic Information System (GIS) Model Project Partners: North.
Grays Harbor County Shoreline Master Program Update Our Heritage, Our Future Grays Harbor Master Builders January 9, 2012.
Ohio Balanced Growth Program October 30, 2012 Sandra Kosek-Sills PhD Ohio Lake Erie Commission.
Desktop Analysis Used To: Identify areas that meet certain criteria (e.g. contig forest 50 acres+, id gaps as well, or set lower value in urban area) Identify.
Green Infrastructure Network Design Analysis Beaufort County, North Carolina.
Introduction Leslie Kohli Administrator Springfield Township Lucas County, Ohio.
Conservation of Lake Sammamish Kokanee A Briefing for the City of Bellevue Planning Commission David St. John – Lake Sammamish Kokanee Work Group
Agenda Overview of meeting topics 9:30 AMIntroduction and Agenda Review 9:45 AMSelect Regional Allocation Option and Process Steps for 2006 SRFB Funding.
MANAGING WITH STOCKED TROUT AFM Rick Lorson Under Construction.
WRIA 9 Watershed Ecosystem Forum Adaptive Management Plan Report Presentation Large Wood, Wood Jam, & Pool Conditions in the Green River Watershed Presented.
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Lake Sammamish Kokanee: Bringing Them Back from the Brink A Presentation for the Rotary Club of Issaquah David St. John – Government Relations Administrator.
Development of Spatial Probability Models to Estimate, Integrate, and Assess Ground- Water Vulnerability at Multiple Scales Earl A. Greene and Andrew E.
PRIME WETLAND STUDY OF FITZWILLIAM – INITIAL FINDINGS Dr. Rick Van de Poll Ecosystem Management Consultants Sandwich NH.
Minnesota Hydrography Land of 10,000 Lakes (or so) Mark Olsen Minnesota Pollution Control Agency 520 Lafayette Road N. St. Paul, MN 55155
Iowa Rivers Information System Inventory, Modeling, and Evaluation of Basin, In-Stream Habitat, and Fishery Resource Relationships Kevin Kane, Iowa State.
Jeff Burkey King County Department of Natural Resources and Parks November 4, 2015.
The Cascade Agenda: A New Model for Land Conservation Narragansett Bay Estuary Program Conference May 1, 2009 John Howell Board Member Cascade Land Conservancy.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Ocean/ENVIR 260 Autumn 2010Lecture 9© 2010 University of Washington Ocean/Envir 260 Lecture #9: Unique Issues: Elwha River, Duwamish River, and San Juan.
IMPLEMENTATION UPDATE Rice County Local Water Management Plan BOARD PRESENTATION JUNE 16, 2015.
Ocean/ENVIR 260 Autumn 2010Lecture 10© 2010 University of Washington Ocean/Envir 260 Lecture #10: Priority Conservation Areas in the Puget Sound Ecosystem.
CONSERVATION AND RESOURSE PROTECTION GRANT PROGRAM NEVADA DIVISION OF STATE LANDS Question 1.
Sustainability Week BUS& 201 Business Law Shana Chung December 3, 2014.
Using RMMS to Track & Report BMP Implementation
Critical Linkages: Identifying Culvert Replacement Priorities to Maintain Connectivity of Cold Water Streams in the Face of Climate Change Scott Jackson,
Lancaster County Conservancy Long Range Protection Plan
Options for TDR in Puyallup
Henrico County Stream Assessment / Watershed Management Program
Washington County Parks and Open Spaces
North Shore Restoration Project
Combined Sewer Overflows in Seattle, WA
Hillsborough MPO School Safety Study
Watershed Literacy & Engagement
Hill Country Associates Pedernales River analysis
What’s all the fuss… What’s all the fuss about all this “GIS” stuff? What it boils down to is simply that we care about where things are.
WESt Sammamish park project
Unit: Water and the Atmosphere
Prioritizing Watershed Protection in King County
Restoration & Monitoring Prioritization Tool
Building a Community of Stewardship Through Water Monitoring
Contaminants of Emerging Concern Review Prioritization Meeting
% Riparian Natural Cover
GIS & Land Preservation
Presentation transcript:

Prioritizing Watershed Protection in King County By: Olivia Wright Objective: The purpose of this project is to assess the conditions of the watersheds in King County and evaluate which watershed should have the highest priority for protection. The study used GIS analysis of 303d listed streams, National Wetland Inventory (NWI) and public park coverage, and developed land use to rank the conditions of King County’s watersheds, with the value of 1 signifying the greatest concern and 8 as the lowest. The analysis also took into account the feasibility of restoration in the watershed by looking at the percentage of wetlands and public parks within the boundaries that may cause permitting issues and potentially increase the cost of watershed restoration. Results: The table shows the results of the analysis. The parameters were ranked based on the percent of coverage in each watershed, taking into account watershed health and watershed restoration feasibility. By summing the rankings of the parameters by watershed, the Cedar River/Lake Washington Watershed is determined to have the highest priority for watershed protection and potential restoration due to the health of the watershed and the amount of wetlands within its boundaries. Watershed Name Watershed Area (acres) 303d Stream Area (acres) Percent 303d Streams 303d Ranking Developed Area (acres) Percent Developed Developed Ranking NWI and Park Area (acres) Percent Park and NWI Park and NWI Ranking Sum of Rankings Final Watershed Prioritization Cedar River / Lake Washington 234,206.79 8,458.28 3.61% 1 60,228.99 25.72% 3 18,159.10 7.75% 4 8 Duwamish - Green River 314,223.32 8,394.99 2.67% 51,741.37 16.47% 5 15,085.26 4.80% 9 2 Central Puget Sound 59,006.73 1,721.65 2.92% 18,490.54 31.34% 7,055.97 11.96% 6 10 Puyallup River 8,178.21 51.19 0.63% 3,305.22 40.42% 659.12 8.06% 11 Sammamish River 108,448.83 1,437.96 1.33% 26,803.07 24.71% 16,965.19 15.64% 7 15 White River 76,657.65 147.55 0.19% 3,980.31 5.19% 4,077.81 5.32% Snoqualmie River 426,818.36 979.36 0.23% 13,110.78 3.07% 27,704.30 6.49% 16 Skykomish 173,264.58 260.97 0.15% 1,892.30 1.09% 149,486.52 86.28% 24