Generic Revenue Driver Methodology

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

AER wrap-up Jim Cox, AER board member 1. How to make submissions We are seeking submissions on the NSW distributors’ proposals We are seeking submissions.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
European Developments Transmission Workgroup 3 rd May 2012.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Annual Review of Shrinkage and Leakage Model
EU Implementation Programme
CGR2 Summary Proposals UNC Panel 18 October 2012.
Transmission Workgroup 7th July 2011
Proposed Bay TMDL Schedule
Grid Code Development Forum – 6 September 2017
RIIO-GD1:network charging volatility
Transmission Workgroup 4th October 2012
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Allocation of Unidentified Gas Statement - Update
All Wales Safeguarding Procedures Review Project
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Process, timeline and overview
General Grants Program Process
UNC Trader User – Licence obligations
doc.: IEEE <doc#>
Revised engagement approach for draft GTAC
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Reliability Standards Development Plan
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Annual Review - Methodology Statements
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
McDonald’s calendar 2007.
Draft Capacity & Connection Plan
Strategic Planning Timeline Overview
doc.: IEEE <doc#>
Update on Exit Capacity Substitution and Revision
Transmission Planning Code Review
PARCA Timeline.
Draft Mod: Update of default System Marginal Prices
NDIA PMSC Guides Working Group
Options for the Development of a Demand Side Response Mechanism
Tropical cyclones movement
Open Letter - Summary of Responses
Review plan of the nature reporting – update 6
Transmission Workgroup July 2012
Incremental Entry Capacity Release Methodology Statement
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Project Nexus Workgroup
McDonald’s calendar 2007.
FY2019 TDHCA Emergency Solutions Grant Overview
Gas Customer Forum 28 July 2008
Update developments in Core CCR
Update developments in Core CCR
2015 January February March April May June July August September
DSC CoMC Switching Programme Update 17th July 2019
Presentation transcript:

Generic Revenue Driver Methodology May 2013

Overview We are required to have submitted a Generic Revenue Driver Methodology by 1st September 2013 following the RIIO-T1 outcome and Licence changes A draft GRDM was consulted on in October 2012 with the intention to update following final proposals Required changes; Removal of references to pipeline build complexity as this is no longer a factor in pipeline unit costs Clarification of the trigger point for calculating RDs The following slide represents a high level plan for the re-consultation to deliver this obligation.

Draft Plan Activity Detail Dates/Time Development Update methodology based on initial consultation responses and accepted final proposals May Examples Identify examples and apply methodology May/June (4 weeks) UNC Tx Workgroup Notify industry of intention to consult at June Tx Workgroup. Reminder and Q&A opportunity at July Tx Workgroup. June & July Consultation Industry consultation June/July (28 days) Revisions Update based on consultation responses July Submission Submit to Ofgem for approval July/ August Decision Authority decision September/ October Effective GRDM becomes effective – publish on NG website 1st November