Advocacy Plan Introduction

Slides:



Advertisements
Similar presentations
Implications for Think Tanks Need to be able to: –Understand the political context –Do credible research –Communicate effectively –Work with others Need.
Advertisements

What is an M and E Plan?. Organizing the Work of M and E An M and E System -- the 12 components as a whole – Sets out broad vision at national level An.
Education Policy Advocacy Objectives: 1.To learn why advocacy is one of the roles of CSOs. 2.To learn the process for developing an effective strategic.
Cutting Topics into Manageable Steps STRATEGIZING FOR CHANGE Globalization Human Rights Climate Change Hate Crimes Immigration HIV/AIDS Poverty Obesity.
Logic Modeling for Success Dr Kathryn Wehrmann Illinois State University.
Evaluating Physical Activity Intervention Programs Thomas Schmid, PhD Physical Activity and Health Branch CDC Atlanta, Georgia, USA.
ENACTUS TRAINING Steps to condcut a needs analysis Developed by D Caspersz & D Bejr, 2013.
Conducting the IT Audit
Committee Planning and Budgeting Tool: Outlining the Roles and Responsibilities of Selected Committee Support Personnel A Presentation to Committee 8 July2014.
Nine steps of a good project planning
One Voice – One Plan Office of Education Improvement and Innovation MI-CSI: Do Stage Implement Plan and Monitor Plan.
The County Health Rankings & Roadmaps Take Action Cycle.
© 2008, Johns Hopkins University. All rights reserved. Documenting the Quick Win The Quick Win Step 1: Formative Step Step 2: Process Activities Step 3:
Indo-Gangetic Basin Impact Pathways Workshop 30 June - 2 July, 2006 Himalaya Hotel, Kathmandu, Nepal Boru Douthwaite and Cristina de Leon CPWF-BFP Impact.
Fundamentals of Evaluation for Public Health Programs ROBERT FOLEY, M.ED. NIHB TRIBAL PUBLIC HEALTH SUMMIT MARCH 31,
Objectives: 1. To learn why advocacy is one of the roles of CSOs. 2. To learn the process for developing an effective strategic advocacy campaign 3. To.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
17. STEP 5: MONITOR, EVALUATE & ADAPT 1 Essential EAFM Date Place 17. Steps 5.1 & 5.2 Monitor, evaluate & adapt Version 1.
For use with Strategic Electronic Marketing: Managing E-Business Copyright 2001 South-Western College Publishing Introduction Slide: 1 Introduction: Strategic.
“The great end of education is to discipline rather than furnish the mind; to train it to the use of its own powers, rather than fill it with the accumulation.
Presage Seminar MED Programme – Final application 2 nd call for proposals Information and Publicity section Marseille, December 2nd, 2009 Sonia Levavasseur,
ESPON 2013 Programme Info Day 11 September 2013 Call for Proposals for Transnational Networking Activities by ECPs (22 August – 18 October 2013) Inspire.
NUTRITION CLUSTER ADVOCACY TOOLKIT
Summary FACT Trajectory & preparatory Workshop FACT lessons learnt Workshop Agriterra.
Why Practical Design…Why NOW… 1 Practical Design in ODOT (Tab 2) ? Training ? 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
Developing Corporate Communication Strategy & Communication Plans
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Final Year Project 1 (FYP 1) CHAPTER 1 : INTRODUCTION
OCLC Online Computer Library Center 1 Putting Advocacy Plans into Practice.
ISLLC Standard #6 ISLLC Standard #6 Implementing Educational Policy Name Workshop Facilitator.
Tools and Instruments Wiki This presentation: 1. Justification 2. First attempts 3. Why a ‘wiki’? 4. The set-up of the wiki 5. The further development.
Session 2: Developing a Comprehensive M&E Work Plan.
Introduction Social ecological approach to behavior change
LB160 (Professional Communication Skills For Business Studies)
MA-PAL TASK 1 LEADERSHIP THROUGH A VISION FOR HIGH STUDENT ACHIEVEMENT.
MGT 420 Week 2 Learning Team Part 1 BJB Manufacturing Company Quality Management Initiative Proposal To purchase this material click below link
PSY 405 Week 1 Individual Introduction to Personality Paper Prepare a 1,050- to 1,400-word paper in which you examine personality theory. Address the following.
Introduction Social ecological approach to behavior change
Introduction to advocacy
HOW TO WRITE PROJECT PROPOSAL – FORM AND STYLE
Disaster and Emergency Planning
SWOT Analysis Overview Hotel Level SWOT Analysis Template
Strategic Planning for Learning Organizations
BUS 475 genius Education Begins/bus475genius.com
Our Understanding of Institution/Capacity Building
SFHN Quality Academy 2017: Title
Advocacy and CampaiGning
How to do an Internal Audit
“Unpacking” our modules-building modules that meet LDC criteria
Title: Owner: Ver: Date:
Documenting Success and Overcoming Failure
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Planning a Learning Unit
Monitoring and Evaluation using the
HEADLINE – Make it interesting
Essentials of Oral Defense (English/Chinese Translation)
5.3 Using the Theory of Change Throughout the Project Cycle
CATHCA National Conference 2018
GENERAL INTRODUCTION TO ADVOCACY
Good practice in preparing an application
Nutrition Cluster Advocacy
Overview of Business Area Strategy and Products and Services
EVALUATION OF COUNTERMEASURES PDCA
Business Administration Programs School of Business and Liberal Arts Fall 2016 Assessment Report
Assessment of current management plan (EoH Tool 5)
EVALUATION OF COUNTERMEASURES PDCA
Policy Advocacy What is Policy Advocacy?
Learning Goals: By the end of today's lesson, you will be able to:
Presentation transcript:

Advocacy Plan Introduction An advocacy plan, or strategy, does not need to be a heavy document. On the contrary, instead of having a pile of papers in the archive, the plan should be a ”living” and ”dynamic” guide, which can help you to plan and implement tactical advocacy actions. The more experience you get, and the more knowledge you get about the context, the more quickly you will learn to revise and adjust your plans. Below you will find a few areas which are good to address when you develop your plan. 1) What is the problem? Describe the problem you want to address. You can for example use a problem tree, or narrative description. The problem will be closely linked to the mandate of your organization, and you may be able to skip this exercise. 2) What is the solution? Describe your advocacy goal, or what you want to achieve. You can for example use a solution tree, or a narrative text. 3) What is the context? Consider the political and, if relevant, cultural and social, context. Analyze power relations, e.g. who has the power to make decisions with relevance for the goal of your advocacy plan? Use, for example, a chain of influence, or other tools of power analysis. Map, and analyze, stakeholders with a relevance for the advocacy goal. Who could be allies and who could be enemies? Consider possible risks related to advocacy, related to your advocacy goal. Identify political processes and events which could be relevant for the advocacy goal. This document is a guide and not a fixed format. Different ACT members use different concepts and wording, but the headlines presented here are always relevant to consider.

Advocacy Plan 4) Develop your plan Describe your plan, or strategy, for how to reach the advocacy goal. You can, for example, use theory of change or other tools to develop realistic pathways and plans. Some plans may be short and focused on a specific event, while others may be bigger, stretching over several years. Consider messaging, methods and timing, and the possible need for research and documentation. 5) Implement your plan Implement the activities you have planned, and monitor the effect as well as the context. Celebrate successes and learn from mistakes. Then, revise your plan by returning to the top. Is there still a problem? Should the proposed solution be adjusted or changed? Have there been changes in the context? Is there a need for changes in the plan? A revision of a plan does not necessarily lead to production of a new document. A revision can also be a moment to reconsider the context and the need to adjust activities. Finally, be patient. In most cases it take a long time to have success. This document is a guide and not a fixed format. Different ACT members use different concepts and wording, but the headlines presented here are always relevant to consider.

Proposed format Problem Solution Context Advocacy Goal: Power and politics: Stakeholders: Processes and timeline: Risks: This document is a guide and not a fixed format. Different ACT members use different concepts and wording, but the headlines presented here are always relevant to consider.

Proposed format Plan Advocacy targets (whom to target): Pathway (advocacy activities, including possible research and documentation, related to advocacy targets as well as stakeholders and timeline described above): Advocacy messages: Monitoring plan: This document is a guide and not a fixed format. Different ACT members use different concepts and wording, but the headlines presented here are always relevant to consider.