What’s happening in la Habra?

Slides:



Advertisements
Similar presentations
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Advertisements

AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Presented by: SAGE KAMIYA, P.E., PTOE
Slide 1. Slide 2 Introduction How did you get to school as a child?
Emerging Transportation Technologies in Virginia Ken Earnest Assistant Division Administrator Operations Division.
Divya Nagananda and Dr. Emelinda M. Parentela California State University, Long Beach June 26, 2012 Santa Barbara ITE 2012 An Evaluation of Bike Lanes.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
CIVITAS PLUS INTELIGENT TRAFFIC MANAGEMENT AND CONTROL IN THE CITY OF SKOPJE Lovren Markic, Site Leader Athens 24 April 2012.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Vision Zero Enforcement Report Chief Gregory P. Suhr Commander Ann Mannix Captain Tim Oberzeir May 2015.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Special Event Operations City of Daytona Beach Traffic Engineering.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Small Cost – Big Impact: Lessons in Low-Cost Safety Improvements Gustave Scheerbaum, PE Complete Streets Safety Engineer ARLE Grant Programs Manager City.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
STAFF’S FINDINGS OF INCONSISTENCY Section 30233(a) Wetland Fill Staff’s basis for denial centers on the determination if the project meets the incidental.
Bicycle Facilities Design Lecture 25 Norman W. Garrick.
Complete Streets Training Module 4b – Designing for All Users.
Pedestrian Facility Improvement Program
Community Based Transportation Plan
Elizabeth G. Jones Assoc. Professor of Civil Engineering and
Arizona Forward Update
Rotary Presentation April 28, 2016
Affordable Housing and Sustainable Communities (AHSC) Program
Rock Creek East II Livability Study
Saving the King Street Bicycle Boulevard
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
STREETS, PEDESTRIANS AND BICYCLES
32 Transportation Midway City 2016 General Plan
The Central Avenue Connector Trail
Reducing GHG emissions from Transportation using Smart Growth
Project Management Team Meeting #3
Intelligent Transportation Systems
Ride with the wind Michael Truong.
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
HSR Crossing Safety Update Elliot A
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Pedestrian & Bicyclist Crash Analysis
WTOC Pic of area WTOC (Signals) 5 SCATS Operators Monitoring 6am-8pm
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
An ACSLite Case Study Riva Road in Annapolis, MD
Transportation Research Board 2004 Annual Meeting
Rules of the Road.
Unit 2: Signs, Signals, and Roadway Markings
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
Senate Concurrent Resolution # 13
Early Voting Starts Oct. 20 | Election Day Nov
City of Wilmington Bike Plan Update
Using CMFs in Planning for Virginia’s Project Funding Prioritization
Elements of Effective Signal Maintenance
ITE Midwestern District Conference June 20, 2017
Proposed FY Capital Improvement Program (CIP)
School of Civil Engineering
Protected Bicycle Lanes Finally Pedal Their Way to KC…
MPO Board Presentation
Design Standards.
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Magnolia Grove Civic Club
Project Location: 35th Ave HSIP8
Module 6 A 21st Century Transportation Network
Presentation transcript:

What’s happening in la Habra? City Projects What’s happening in la Habra? 3/28/2019

La Harrrrrrrrbra?

What’s happening in La Habra? Bikeway Master Plan Complete Streets Master Plan Systemic Safety Analysis Report Program (SSARP) Imperial Highway RTSSP Traffic Management Center (TMC) ITS Upgrades

What’s happening in La Habra? Union Pacific Bike Trail (OC Loop) Lambert Road (Repave) Idaho Street (Repave) Splash Pads Future

Bikeway Master Plan Completed in 2017 Prioritized Bicycle Corridors General Plan 2035 Class I – 1.1 mi (4.7 mi) Class II – 2.5 mi (4.2 mi) Recently Added 5.5 mi Class III – 14.4 mi (6.3 mi)

Complete Streets Master Plan Completed in 2019 Active & Safe Streets General Plan 2035 Complete Streets Act 2008 Improve Health Improve Safety Walkable Neighborhoods

Systemic Safety Analysis Report Program (SSARP) Currently On-Going (July 2019) Awarded 2 HSIP Grants Reduce Pedestrian Collisions Primary Collision Factor (PCF): Unsafe Speed & Automobile right-of- way Safety Countermeasures: Hardware Upgrades & Protected Turns

Imperial Highway RTSSP Currently On-Going (May 2020) La Habra, Fullerton, Brea, Placentia, Yorba Linda, and Caltrans Reduce delay, GHG, and increase travel speeds TMC, FO Communication, and CCTV Upgrades 46 signals (~10 mi) $3.45 M

Traffic Management Center (TMC) Currently On-Going (June 2019) 4 Screen Video Wall Video Server Clock Server Soundbar Field Laptop SNMP Server/Client

Traffic Management Center (TMC) Currently On-Going (June 2019) 4 Screen Video Wall Video Server Clock Server Soundbar Field Laptop SNMP Server/Client

ITS Upgrades 2070 ATC Controllers (2070-1C Module - MaxTime) SPaT Compatible (Connected Vehicle) MaxView ATMS Moxa Switches (Edge & Hub) 332 Cabinets Cohu Rise CCTV Cameras Iteris Video Detection (Bike)

ITS Upgrades 2070 ATC Controllers (2070-1C Module - MaxTime) SPaT Compatible (Connected Vehicle) MaxView ATMS Moxa Switches (Edge & Hub) 332 Cabinets Cohu Rise CCTV Cameras Iteris Video Detection (Bike)

ITS Upgrades 2070 ATC Controllers (2070-1C Module - MaxTime) SPaT Compatible (Connected Vehicle) MaxView ATMS Moxa Switches (Edge & Hub) 332 Cabinets Cohu Rise CCTV Cameras Iteris Video Detection (Bike)

ITS Upgrades 2070 ATC Controllers (2070-1C Module - MaxTime) SPaT Compatible (Connected Vehicle) MaxView ATMS Moxa Switches (Edge & Hub) 332 Cabinets Cohu Rise CCTV Cameras Iteris Video Detection (Bike)

ITS Upgrades 2070 ATC Controllers (2070-1C Module - MaxTime) SPaT Compatible (Connected Vehicle) MaxView ATMS Moxa Switches (Edge & Hub) 332 Cabinets Cohu Rise CCTV Cameras Iteris Video Detection (Bike)

Union Pacific Bicycle Trail (OC Loop) From this…

Union Pacific Bicycle Trail (OC Loop) To this…

Union Pacific Bicycle Trail (OC Loop) 3.1 mi from west city limit to The Tracks at Brea R/W acquisition from UPRR Northern 15’ of UPRR R/W ATP Cycle 1, 2, 3A Grant Funding for R/W ~$3.1 M OC Loop (66 mi) connection segment A

Lambert Road (Repave) Completed in 2018 Worst Road in La Habra Added Class II Bike Lanes (~5 mi) Installed Wrong Way Signs $5.6 M

Lambert Road (Repave) Completed in 2018 Worst Road in La Habra Added Class II Bike Lanes (~4.5 mi) Installed Wrong Way Signs $5.6 M

Lambert Road (Repave) Completed in 2018 Worst Road in La Habra Added Class II Bike Lanes (~4.5 mi) Installed Wrong Way Signs $5.6 M

Lambert Road (Repave) Completed in 2018 Worst Road in La Habra Added Class II Bike Lanes (~4.5 mi) Installed Wrong Way Signs $5.6 M

Idaho Street (Repave) Completed in 2018 Added Class II Bike Lanes (~1 mi) $800K Reduced street crown from 12% to 7% Replaced Water Main

Idaho Street (Repave) Completed in 2018 Added Class II Bike Lanes (~1 mi) $800K Reduced street crown from 12% to 7% Replaced Water Main

Idaho Street (Repave) Completed in 2018 Added Class II Bike Lanes (~1 mi) $800K Reduced street crown from 12% to 7% Replaced Water Main

Splash Pads Currently On-Going $1.2 M Grant

Splash Pads Currently On-Going $1.2 M Grant

Future Connected Vehicles/Autonomous Vehicles Citywide Fiber Optic Communication Network Uninterruptible Power Supply (UPS) Units LED Safety Lighting OC Loop Connection Passenger Rail Service?

Thank You

Michael Plotnik, TE Traffic Manager mplotnik@lahabraca Michael Plotnik, TE Traffic Manager mplotnik@lahabraca.gov (562) 383-4162