CIOMS Cumulative Glossary

Slides:



Advertisements
Similar presentations
Update on NERC Project Assess Transmission Future Needs – TPL-002, footnote b Chifong Thomas July 17-18, 2012.
Advertisements

Doc.: IEEE /0085r2 Submission July 2011 Gerald Chouinard, CRCSlide Response to Comments received on the proposed a PAR and 5C Date:
TINA G. BUTCHER NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (NIST) WEIGHTS & MEASURES DIVISION (WMD) SEPTEMBER 2011 TALKING FREIGHT SEMINAR Developing.
Process: Pathway to Common Terms Goal: Standardize on 5-6 common definitions to be put forth as FEAPO wide agreed upon terms and definitions. Proposed.
U.S. Department of the Interior U.S. Geological Survey USGS National Hydrography Dataset Stewardship in West Virginia George Heleine USGS NHD POC Region.
Setting the success criteria to evaluate project success Tiina Lell
Evaluation and Attitude Assessment BME GK-12 Fellows 12/1/10, 4-5pm 321 Weill Hall Tom Archibald PhD Student, Adult & Extension Education GRA, Cornell.
Charting a course PROCESS.
Software Process Model
Technology Guide Three Cloud Computing. Plug IT In OUTLINE TG 3.1 Introduction TG 3.2 What Is Cloud Computing? TG 3.3 Different Types of Clouds TG 3.4.
Project WECC-0100 Update Reliability Subcommittee February 2014.
1 Prototype a Performance Management System for Linking Performance Measurement and Case-based Knowledge David Kuo Vincent Yang.
Some of the best books of  &mid= A23D2FC75CD A23D2FC75CD7.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
© University of Strathclyde Martin Fitchie University of Strathclyde Research Presentation Day 2004 Integrating Tolerance Analysis and.
COST C21 Kick-off meeting Urban Ontologies for an improved communication in urban civil engineering projects TOWNTOLOGY Project.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
CEOS Self-Study Preliminary Ideas on Implementation: Toward a Refined CEOS Michael H. Freilich Incoming Chair, CEOS-SIT
Project Charter START IT! By Catherine B. Calio, PMP
This is Not a Book About …. Author: Illustrator: Class: Date:
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
WRITE DOWN AS MANY GAMES AS YOU CAN IN 30 SECONDS.
UCU Conference – 3 December 2009 A Presentation on the Findings of the Review of Governance in FE Allan Schofield
1 55 th IETF Atlanta,GA 55 th IETF meeting, Atlanta,GA PWE3 ATM, and Ethernet encapsulation PWE3 Control Protocol Updates Luca Martini, Level3 Communications.
©Ian Sommerville 2007COTS-based System Engineering Slide 1 COTS-based System Engineering.
1 Project Integration Using MS Project PMI Scheduling Forum June 2, 2009 Presented by: Ric Albani.
Wrap-up and Next steps Donatella & Bri
Presented by: Jean Moore, Dr PH Director
Fees Briefing Paper Chishala Kateka, IESBA Member and Fees Working Group Chair IESBA Meeting March 13-15, 2017.
CS 389 – Software Engineering
Establishing and Managing a Schedule Baseline
Paul Ammann & Jeff Offutt
IT Professional Perspective IT Strategy, Policy and Governance
Data Managers’ Forum What’s in it for us?
Performance Management Goal Setting Development Plan Goals
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Validation & conformity testing
Chapter 2 – Software Processes
API 17Q – Subsea Equipment Qualification
Return to First Principles
Flood Risk Management Towards a New Paradigm
Values In Action.
ASEAN Guidelines on Harmonisation of Standards
M&E in Project Cycle Management
SMART Objectives Are in addition to day-to-day accountabilities
بسم الله الرحمن الرحيم القيد المدني في فلسطين.
Software Engineering Rekayasa Perangkat Lunak
Software Engineering Rekayasa Perangkat Lunak
Monitoring &Evaluation in Project Cycle Management
Review & maintenance of IAEG Glossary
WS-RX TC Process for Specification Development
Review of OAD – Proposed Planning
RadCalNet/Landnet process for adding new sites
Dr Panos Tsintis Senior Advisor - CIOMS Berlin - October 2018
Project WECC-0100 Update Reliability Subcommittee
“Guiding principles for patient participation in the generation of benefit-risk data”: Chapter Outline Leo Russo on behalf of the Group 2 Topic 3 sub-team.
Sub-team 2: Patient involvement in the design, implementation and evaluation of additional risk minimization measures Stella Blackburn, Mary O’Hare, Leo.
Non Functional Topic 6th December 2011
Patient involvement in developing crisis/time-bound communications
CIOMS Working Group XI – Patient Involvement
Rekayasa Perangkat Lunak
Q. 9/4 Study Group 4 Ken Smith Rapporteur Verizon Communications, Inc.
Comments on SIEC by the Expert Group on International Economic and Social Classifications UNSD.
Atlas A bound collection of maps.
Reminders As always, grab your independent reading book.
Question: Think Talk Idea Talk Idea Talk Idea Notes: We Understand.
IEEE MEDIA INDEPENDENT HANDOVER
Values In Action.
Green Document for WG 47 on Fires in Tumble Dryers
Presentation transcript:

CIOMS Cumulative Glossary Stella Blackburn, Panos Tsintis Stephen Heaton

Need It is difficult to have one source book/reference with all definitions aligned and agreed upon by different stakeholders Earlier CIOMS book´definitions are not always referred to in current regulatory environment Definitions appear to be evolving, and CIOMS can possibly contribute to alignment

Scope Incorporate all available CIOMS WG glossaries into one book The working glossary will demonstrate the evolution of some CIOMS definitions Standalone? Web?

The problem with “standard“ definitions

Actions WG to determine which definitions are current WG to determine which definitions need updating according to accepted references WG to create new definitions based on lack of reliable references Maintance of glossary will be needed