Presentation to Orleans Levee District Lake Pontchartrain And Vicinity Levees LPV101 - 104 20 September 2006 Presentation to Orleans Levee District Lake.

Slides:



Advertisements
Similar presentations
Evolving a Knowledge-Driven Global eServices Model John Fronius Director, Knowledge Systems Customer Support Division May 23, 2006.
Advertisements

EL PASO COUNTY FACILITIES MANAGEMENT DEPARTMENT DIRECTOR MONNIE GORE.
Analyzing the MAC-level behavior of wireless networks in the wild Ratul Mahajan (Microsoft Research) Maya Rodrig, David Wetherall, John Zahorjan (University.
30/11-1/12/061 Submitting a successful proposal to Marco Polo.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Service Credit Online Certification and Correction Training By Paula C. Rhodes Created by: Martha Rosa Updated: 04/20/2007.
5/12/061 Modeling, Simulation, and Analysis of Variable Frequency Transformers Brian C. Raczkowski Peter W. Sauer.
Rev VETERAN-OWNED BUSINESS Presented by: Florida Procurement Technical Assistance Center Program.
11/2/06 Micro-Enterprise: Realizing the Dream or Making Money and Having Fun!
Inner Harbor Navigation Canal Lock Replacement Project.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
CICLO DI PROGETTO Prof. Luca Brusati Lezione 06 Lunedì 31 marzo 2008 Anno accademico Università degli Studi di Trieste Facoltà di Scienze Politiche.
Lake Ponchartrain Normal WS EL = 0.0 Normal Operation Before Gates City of New Orleans Storm Water Pumping Station Levee Top of Levee EL = 11.5 Maximum.
Created 01/14/061 IDEA CHANGES! Margaret Jakobson-Johnson Managing Attorney Protection and Advocacy, Inc. San Diego Regional Office
CCTI HSTW Making High School/ Community College Transitions: Combine HSTW and CCTI Southern Regional Education Board Gene Bottoms Senior Vice President.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
Cowlitz Regional Trails Plan. Introduction Cowlitz County Parks Facilities Plan Cowlitz County Parks Facilities Plan Cowlitz County Bikeway Plan Cowlitz.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
HSDRRS Wave Overtopping Risk Reduction for Return Events Greater than 100 yr. By: John Monzon, P.E. Flood Protection Division Chief and Rickey Brouillette,
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Duane Hill, District Engineer
6 th Street Water Main And Street Reconstruction 2013.
New Orleans Levee Failure Physical Modeling Mateo Arimany Albert Bleakley February 2010.
Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection Project, TAMUG Bill Merrell, George.
New Orleans’ Levee Failures Chalston Layacan Elizabeth Lenker Jamie Mellies.
Geographic Inquiry: Why did New Orleans Flood?.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Support to Gulf Coast Recovery U.S. Army Engineer Research and Development Center Coastal.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
US Army Corps of Engineers BUILDING STRONG ®. Slide 2.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
TROPICAL STORM LEE September 1-6 After Action Report.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Lake Pontchartrain & Vicinity LPV- 03.2B, West Return Floodwall,
US Army Corps of Engineers BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System CPRA Team New Orleans 17 May 11.
Southside Flood Protection
History Established in 1909
US Army Corps of Engineers BUILDING STRONG ® Kansas Citys, Missouri and Kansas Flood Risk Management Project Presentation to Kansas City Industrial Council.
Greater New Orleans Area Hurricane & Storm Damage Risk Reduction System Smart Rivers Conference, Opening Plenary Session Col. Edward Fleming Commander,
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for.
Comprehensive Plan Advisory Panel September 19, 2007.
Hurricanes. Katrina approaching New Orleans August 2005.
North Section 1 st Avenue to RR North Section NP to RR South Section 1 st Avenue to 4 th Street Levee South Section 1 st Avenue to 4 th Street Levee.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers 1 Coastal Protection and Restoration Advisory Committee 3 April 2006 D
City of San Mateo Flood Control Efforts & Needs. Preliminary FIRM (2008)
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Presentation to the Little Rock SAME Small Business Symposium by LTC Mark Jernigan Deputy Commander, New Orleans District April 28, 2009 Presentation to.
New Orleans Hurricane Protection System Overview by Mike Park HPS Program Manager Task Force Hope U.S. Army Corps of Engineers March 19, 2008.
The Engineering Response to Flooding 1. Inland Flooding – Ohio River.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
I-84 Waterbury Project Project Overview July 2017.
Measure A Financial Oversight Committee August 7, 2013
25th Avenue Grade Separation
25th Avenue Grade Separation
Fab-Five Projects New Orleans FY19-FY23
URBAN TRAIL PROJECT UPDATES
Estler Lake Dam Rehabilitation
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
Challenges and Opportunities in Addressing Climate Change
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Presentation to Orleans Levee District Lake Pontchartrain And Vicinity Levees LPV September 2006 Presentation to Orleans Levee District Lake Pontchartrain And Vicinity Levees LPV September 2006

One Team: Relevant, Ready, Responsive, Reliable 19 September 062 Goal Provide protection from storm surge that has a one percent probability of occurring in any year. Phase One: Raise levees to the authorized elevation and perform other critical work. Phase Two: Raise the levee system, including floodwalls, ramps, and gates, to the authorized or 100 year level, whichever is higher.

One Team: Relevant, Ready, Responsive, Reliable 19 September 063 Overall map

One Team: Relevant, Ready, Responsive, Reliable 19 September 064 Project Reaches Multi-district teams led by: LPV101 – St. Louis District LPV102 – Memphis District LPV103 – St. Paul District LPV104 – Rock Island District LPV Gates – Vicksburg District

One Team: Relevant, Ready, Responsive, Reliable 19 September 065 Project Reaches – LPV101 Location: 17th Street Canal to Lakeshore Drive Levee: 325 feet Floodwall: 2,600 feet Ramps and gate structures: No ramps, 7 gates

One Team: Relevant, Ready, Responsive, Reliable 19 September 066 Map of LPV101

One Team: Relevant, Ready, Responsive, Reliable 19 September 067 Project Reaches – LPV102 Location: Lakeshore Drive to Orleans Avenue Canal Levee: 6,500 feet Floodwall: None Ramps and gate structures: 1 ramp, 1 gate

One Team: Relevant, Ready, Responsive, Reliable 19 September 068 Map of LPV 102

One Team: Relevant, Ready, Responsive, Reliable 19 September 069 Project Reaches – LPV103 Location: Orleans Avenue Canal to London Avenue Canal Levee: 7,190 feet Floodwall: 2,330 feet Ramps and gate structures: 4 ramps, 1 gate Sector gate on Bayou St. John

One Team: Relevant, Ready, Responsive, Reliable 19 September 0610 Map of LPV103

One Team: Relevant, Ready, Responsive, Reliable 19 September 0611 Project Reaches – LPV104 Location: London Avenue Canal to IHNC Levee: 9,400 feet Floodwall: 3,400 feet Ramps and gate structures: 4 ramps, 5 gates

One Team: Relevant, Ready, Responsive, Reliable 19 September 0612 Map of LPV104 - West

One Team: Relevant, Ready, Responsive, Reliable 19 September 0613 Map of LPV104 - East

One Team: Relevant, Ready, Responsive, Reliable 19 September 0614 Phase One Construction Levees: Raise existing levees to authorized grade Floodwalls: Modify I-walls if necessary. Concrete pad for scour protection of I-Walls Embankment berm for I-Wall stability Scour protection at I-Wall transitions into levee Gates and ramps: Remove gate at Topaz Street and replace with earthen embankment

One Team: Relevant, Ready, Responsive, Reliable 19 September 0615 Phase Two Construction Levees: Raise levees to 100 year level of protection Floodwalls: Raise or replace walls to provide 100 year level of protection. Scour protection at transitions wall to levee. Raise or replace Sector Gate Structure at Bayou St. John to provide 100 yr level of protection Gates and ramps: Reconstruct gates to provide 100 year level of protection Raise ramps at Canal Boulevard, Lakeshore Drive at Rail Street, Lake Terrace Drive at Bayou St. John, and Lakeshore Drive at intersection with Lake Terrace Drive at London Canal

One Team: Relevant, Ready, Responsive, Reliable 19 September 0616 Construction Schedule

One Team: Relevant, Ready, Responsive, Reliable 19 September 0617 Quality Control and Quality Assurance Processes Independent Technical Review (ITR) Value Engineering (VE) Biddability, Constructability, Operability and Environmental (BCOE) Review

One Team: Relevant, Ready, Responsive, Reliable 19 September 0618 LPV101 Key Design Issues: Floodwall Alignment at Marina Gate L4 relocation Pedestrian Gate L1B abandonment Pump station culvert modification Possible replacement of Gate L1A with ramp

One Team: Relevant, Ready, Responsive, Reliable 19 September 0619 LPV102 Key Design Issues: Topaz St. Gate Closure Canal St. Ramp Raise Parking Lot South of Topaz Gate

One Team: Relevant, Ready, Responsive, Reliable 19 September 0620 LPV103 Key Design Issues: Ramp, Lakeshore Drive at Rail Street Ramp at Lake Terrace Drive Ramp, Lakeshore Drive at London Canal Sector gate at Bayou St. John

One Team: Relevant, Ready, Responsive, Reliable 19 September 0621 LPV104 Key Design Issues: Ramp alternatives at Lakeshore Drive, Franklin Avenue, and Camp Leroy Johnson Drive UNO floodwall Naval Reserve Center alignment Real estate and utilities

One Team: Relevant, Ready, Responsive, Reliable 19 September 0622 Gates Feedback needed to proceed Gate alternatives due to levee / floodwall modifications New gate(s) Relocate L4 Remove L6 Remove L9A Remove L9B Remove L9C Remove L10 Confirm design parameters