Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June , Santa Barbara, CA SR 46 Improvement PSR/PDS Study.
Great Western Corridor Feasibility Study
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
38 th Street to Kessler Boulevard Traffic Engineering Review Summary For Historic Midtown Initiative (HARMONI) By HNTB Corporation June, 2010.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Waterbury Branch Line Improvements opportunities to support sustainable development Tom Maziarz, Chief of Planning Connecticut Department of Transportation.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Unconventional Arterial Intersection Design University of Maryland Advanced Transportation Day Aug. 28th 2014 Traffic Safety and Operations Lab University.
Module 5 Displaced Left Turn (DLT) Intersections
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Problem 1: Determination of Facility Types for Analysis.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Presentation to Traffic Working Group February 6, 2014.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Visit Our Website at: Click to edit Master title style.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
NC-54 at Farrington as Offset Intersection
Chelan County Transportation Element Update
Integrating Transit and Highway Solutions In High Volume Corridors
Nixon Road Corridor Study: Findings & Options
(Expressway Traffic Management System)
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Mesoscopic Modeling Approach for Performance Based Planning
Fordham at Columbia as a Grade-Separated Intersection
Light Rail Enhancement Project
Evaluation and Re-Design Haifa and Yafa Streets.
Project Management Team Meeting #3
Homeowners Update Meeting
District 3 Complete Streets Projects
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
Bill Good Chief Operations Officer
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Slugging in the I-395 Corridor
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Proposed Driscoll Expansion Brookline, Massachusetts
Fordham at Columbia as a Grade-Separated Intersection
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance and better accommodate pedestrians Minimize potential construction costs

Study Area Our study area is the section of NC 54/US 15-501 between Raleigh Rd and NC 86 (South Columbia St) and includes: US 15-501 & Raleigh Rd (Interchange) US 15-501 & Old Mason Farm Rd US 15-501 & Manning Dr US 15-501 & South Columbia St (Interchange)

Study Area Chapel Hill US 15-501 Raleigh Rd NC 54 Manning Dr Old Mason Farm Rd NC 86 US 15-501

Preliminary Assumptions – Raleigh Rd Study Scenarios: Existing Year (2016) No-Build Future Year (2030) Build Peak Hours: Weekday AM Weekday PM Annual growth rate of 1%

Design Concept – Raleigh Rd

Preliminary Results & Observations – Raleigh Rd Two proposed signals on Raleigh Rd and one on NC 54/US 15-501 south of Raleigh Rd all intersecting with ramps Proposed signals are operating at LOS C or better during weekday peak hours Improves safety at interchange by eliminating weave segments on Raleigh Rd Better accommodates pedestrians by providing crosswalks/ped phasing at signals on Raleigh Rd Old Mason Farm Rd/Carmichael Ct intersection is operating at LOS E during the AM peak and LOS F during the PM Not really a short term option, need to do something different

Design Concept – Old Mason Farm Rd Concept re-routes traffic to spread the impact over 2 intersections. Short Term solution (access changes), Long Term solution (Continuous Green T) Short term, close off access and put in new two phase signal, longer term go to Continuous Green T US 15-501 Farm Rd Old Mason

Design Concept – Manning Dr Concept re-routes traffic to spread the impact over 2 intersections. Short Term solution (access changes), Long Term solution (Continuous Green T) Manning Rd US 15-501 Kings Mill Rd Short term, close off access and put in new two phase signal, longer term go to Continuous Green T

Corridor Approach Synchronized Street concept on US 15-501; between Manning Dr & Old Mason Farm Rd US 15-501 IF you don’t want to close approaches can go to more of a traditional superstreet Old Mason Farm Rd

Preliminary Assumptions – NC 86 Study Scenarios: Existing Year (2014) No-Build Future Year (2040) Build Peak Hours: Weekday AM Weekday PM Utilizing volumes from US 15-501 Widening – Project Level Traffic Forecast (U-5304)

Design Concept – NC 86 Evaluating grade separated intersection idea that was developed by Dr. Hummer Will analyze after concurrence with Hummer’s concept