Safety, reliability and maintainability

Slides:



Advertisements
Similar presentations
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Zone 1 & 21 Universal Access Point Enclosure System I Copyright Extronics Ltd Zone1 & 21 Universal Access Point Enclosure System.
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
BHEL – Electronics Division, Bangalore
AS-i, The Simplest Automation Networking Solution Dated: 10/30/2008.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
International Scientific & Technical Conference
June 2008 R&D Center / BCS HW Team Introduction to iPECS P5 Hardware.
December 3, 20031Muon Integration Meeting B. Schmidt Introduction: The present architecture of the Muon System is based on the assumption that the maximal.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status of NA62 straw electronics Webs Covers Services Readout.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
Aug 23, 2006 One-vs-Two Tunnel Tradeoffs (America’s Specific) Chris Adolphsen With contributions from the Civil Group, John Carwardine, Ray Larsen and.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
. PR.E 6 rev. 1.1The content of this presentation in confidential Teleco S.p.A. RP 926 and RP 926S presentation (2/4 wire G.shdsl regenerator)
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
CML 700i measuring light curtains Integrated interfaces and control unit for even simpler operation Leuze electronic | CML 700i product launch | Status:
BCM electronics: status and plans BI forum (Feb. 10 th and 11 th 2016) Hooman Hassanzadegan ESS, BI section 1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
HMS Status Steven Lassiter Jan 20, 2017.
Considerations from machine protection and the ELQA teams
Update of MVD services and requests
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
- PANDA EMC Readout System
Injectors BLM system: PS Ring installation at EYETS
Ideas and design concepts, and challenges
T1 Electronic status Conclusions Electronics Cards:
The ELENA BPM System. Status and Plans.
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
XFEL Vacuum System Commissioning
WP02 PRR: Master Oscillator and RF Reference Distribution
MicroTCA Common Platform For CMS Working Group
Ongoing BE-BI developments going to be exposed to radiation
Linac 4 Devices Controls and Monitoring Status
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Programmable Logic Controllers (PLCs) An Overview.
Computer Repair & Maintenance
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Electron Beam Systems ETC and Methodology
ESS BCM Firmware 1.
Krzysztof Czuba ESS LLRF Quarterly Meeting
Risk, Schedule, Deliveries
Remote Handling Workshop Introduction
PSS0 Design & Concept of Operations
Towards final BCM firmware and interface to MPS Hooman Hassanzadegan BI forum, Nov 2018, Lund
Electronics, motion control and verification
Response to the BCM PDR recommendations
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Safety, reliability and maintainability Hooman Hassanzadegan ESS BI section BCM CDR meeting, ESS-Lund 12-13 June 2017

Safety The ACCT system is in general not supposed to pose a risk to personnel safety. Main considerations are: ACCT cables will be fire-resistant and non-PVC. A faulty flanged BCM after being replaced with a new one should be handled with special care due to radiation (same for any linac component that will be exposed to the beam). ACCT front-end electronics uses a screw-terminal for the mains connection (230 V). The front-end will be mounted in a proper enclosure, preferably 3-4 m above the floor. This will then mitigate the risk of an electric shock.

Reliability 1 Main considerations: An attempt has been made to prototype, test and verify all parts of the system including the sensor, cables, customized modules, readout electronics, firmware and software well in advance of final installation. Significant amount of time has been given to new developments, test, trouble shooting and modifications. Design of the in-house-developed modules will be checked and verified (or modified if needed) once more by an external partner with significant experience in electronics. Customized parts including FW, SW and HW need to successfully pass acceptance tests before an official delivery takes place. This includes both internal and external developments. Moreover, the complete system will be tested and verified before installation in the linac. An attempt has been made to maximize synergy with other systems that have similar requirements. That includes the readout electronics and main cables that will be same/similar to those used in the BPM and LLRF systems. Readout electronics have been tested and verified over the last 4 years. Troublesome modules have been replaced with other types.

Reliability 2 Main considerations : New developments are being done in collaboration with some partners who have significant experience in this field. Electronics sanity checks at different levels are foreseen before and during beam operation. This can be useful in detecting faulty parts. Some parts of the system will be redundant. That includes the readout electronics in the warm linac and the ACCT-E / AIU power supplies. The readout electronics will be based on uTCA.4 standard. This will provide extra features for system reliability including IPMI. The aim is to have a fail-safe system. BCM electronics will be installed out of the tunnel. Rad-hard sensors, cables and connectors will be installed in the tunnel.

Maintainability Main considerations: Care has been taken to have easy access to the sensors and the signal ports. The use of patch panels near the toroid and on top of the BCM rack will facilitate maintenance. The BCM electronics (FE, AIU, uTCA) are all modular. This will make it easy to replace a faulty part. Sufficient spare parts are being foreseen for the electronics. The BCM-specific FW is independent of the platform. It is foreseen to develop the next versions of the integration FW in-house. Also, it is planned to develop some new features (ex. the optical link) in-house.