TTC news December 04 Sophie Baron TTC.

Slides:



Advertisements
Similar presentations
FF - TB May 10th, L1 L0 FANOUT LOGIC ALICE general Trigger layout FEE LTU CTP L0 BUSY FEE L1 TTC vi VME BUS L2a, L2r L0 TTC ex CH A CH B L2a, L2r.
Advertisements

Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
UMD Jan Overview Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Unique board for.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Fundamental of Fiber Optics. Optical Fiber Total Internal Reflection.
INTRODUCE OF SINAP TIMING SYSTEM
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Sophie BaronTTC1 TTC status February 2005 ATLAS electronics.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
27 August cp EPTAB5 1. Electronic Systems Support EPTAB 5 27 August 2003 News & Information Chris Parkman Catherine Moine.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Work Review Angel Monera Martinez. Index Objectives Time Frame Analog Link  Analog Requirements  Miteq Characterization and tests Digital Link  Requirements.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Sophie BARON, PH-ESSLEADE, 15/06/06 1 TTC upgrade Status May 2006  Overview  AB/RF optical links  Receiver crate  Status and schedules  Documentation.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager.
GOLD TESTS (Virtex-6) ● Jitter analysis on cleaned TTC clock ( σ = 2.9 ps) ● Signal integrity: sampled in several positions along the chain ● MGT and o/e.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
16/05/03Climatic Chamber & Testbench - Sophie Baron 1 Climatic Chamber & Testbench.
F. Odorici - INFN Bologna
IFR Detector R&D status
Online clock software status
Status of NA62 straw electronics and services
Practical advices for using TCT (mostly for Particulars setups)
Upgrade activities at Clermont-Ferrand
E. Hazen - Back-End Report
CCS Hardware Test and Commissioning Plan
ILC Phase Reference Distribution R&D
RF-TTC Joint News LEADE, June 2008
Status of the Beam Phase and Intensity Monitor for LHCb
TTC UPGRADE FOLLOW-UP Sophie Baron, Angel Monera Martinez LECC 2006
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
ALICE Trigger Upgrade CTP and LTU PRR
CMS EMU TRIGGER ELECTRONICS
Old ROD + new BOC design plans
Fiber Installation for RUN 3&4
TTC System Status May 2007 System overview Production Status
TTC system for FP420 reference timing?
QUARTIC TDC Development at Univ. of Alberta
Strategy for long-term support of the TTC system
TTC Information Meeting
Trigger system Marián Krivda (University of Birmingham)
Fiber Based Synchronous Timing System
Optical links in the 25ns test beam
RoD set-up for the TileCal testbeam, 2003 period.
Trigger issues for the CALICE beam test
LHC Fast Timing Commissioning
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
Fiber Optic Transmission
TTC Fiber Distribution
Presentation transcript:

TTC news December 04 Sophie Baron TTC

Summary TTCrq TTCoc TTCex TTC fibres TTC relocation TTC commissioning TTC upgrade Sophie Baron TTC

TTCrq Activity Dips problem, by Paulo: Prototype status (1): Production tests passed Jitter analysed Sophie Baron TTC

TTCrq Prototype status (2) Preproduction: Temperature test running – 2 prototypes validated Radiation tests scheduled for the 14th of December on 2 of these boards (F. Anghinolfi). Main targets: LVDS driver and regulator. Preproduction: 200 boards for urgent needs 50 for Atlas ~80 for CMS 10 for Alice PCB & assembly at Barco (Belgium) Scheduled for mid January Modifications of the previous version: If there is some interest, we can arrange a way to upgrade the old versions of the TTCrq at Millerin’s workshop Sophie Baron TTC

TTCoc Problem description: Single mode laser source receiver TTC crate TTCex TTCoc 1-16 or 1-32 MultiMode Fibers MultiMode Fiber Single mode laser source Multimode system (including the coupler) Sophie Baron TTC

TTCoc Consequences: Insertion loss can be from -17 up to -5 dB on the outputs of the same 1/16 coupler (specs -14dB) The signal timing is very sensitive to the motion of the first MM patch (between the laser and the coupler) Multimode attenuators are not efficient because the signal is not really a multimode signal Singlemode attenuator effect is ~x3 because of the diameter change We can not specify the maximum spread of the coupler for this type of use Sophie Baron TTC

TTCoc Possible solutions (1): MM source Mode scrambler on the output of the laser source Example from Newport – to be inserted on the input of the coupler Figure 5: Mode scrambler from Newport Newport Price: 794 CHF. Proposed solution from FCI: “special jumper” to be inserted on the output of the laser pigtail. Forces single mode signal (very directional and concentrated) to travel through multiple paths and have a broader and more even spatial distribution in the jumper fiber prior to reaching splitter. 117€ and no need to change the couplers. Samples have been ordered. Sophie Baron TTC

TTCoc Possible solutions (2): Offers: Single mode fibres up to the coupler, and then: SM2SM coupler + SM fibres up to the TRR SM2MM coupler + MM fibres up to the TRR. Samples ordered at Fibernet by Atlas. Offers: SM2SM 16 SM2SM 32 SM2MM 16 SM2MM 32 Scrambler + MM2MM 16 Scrambler + MM2MM 32 Fibernet 840$ 633€ 1380$ 1041€ 880$ 664€ 1420$ 1071€ Comcore (China) 480$ 362€ 799$ 603€ FCI (CAN-CH) 876€ 1819€ 388+117= 505€ 950+117= 1067€ Comcore via Laser 2000 (F) 532€ 830€ Sophie Baron TTC

Fibres Long term tests (annual) – BA3-SR4, 18km Made by Donat Stellfeld ~ 10 ns for 18 km and 25°C outdoor variation Sophie Baron TTC

Fibres Short term tests (diurnal) Made by Donat Stellfeld ~270ps / 18km / 72 hours Sophie Baron TTC

Fibres Short term tests (diurnal) – P5-PCR-P5 - running Made by Jan Troska and Sophie Baron 200ps / 10 km / 48 hours for small temperature change (max 6°C/48h) Could probably be up to 400 ps/ 48h for wider changes - test are still running Is it a problem? Temperature compensated fibres still exist on the market : divide by 15 the change against T Sophie Baron TTC

TTCex – Clock generation Option 1: TTCex module modification to make the standalone clock fit with the TTCrq locking range (40.075-40.082MHz) VCXO voltage reference diode 6V2 => 2V4 Sophie Baron TTC

TTCex – Clock generation Option 2: New VME form-factor module with clock generator. 40.0787MHz with ECL fanout. 1 quartz 80.1574MHz : 19-50 CHF (QuartzCom-Fordahl) (features from Per Gallno) Could be done 1st quarter of 2005 Sophie Baron TTC

TTC relocation PCR - AB/CO lab – CCC Relocation in the AB/CO lab on the 10th of January for one year New fibres installed on the 15th of January PCR computer room dismantled on the 24th of January Simulated 40.078MHz will be available end of January 4 fibres available for the experiments. Possibly more punctually if needed (share with AB/CO) Sophie Baron TTC

Commissioning in the experiments OTDR requested for fibres measurements Precision? >=1 m : classical OTDR (5000-20000 €) < 1 m : photon counting technique (22000-26000 €) Wavelength? Single-mode or Multi-mode? Can be purchased by the pool Other needs? Sophie Baron TTC

TTC upgrade Define upgrade of modules with AB/CO on Q1 of 2005 Same principle VME form factor (?) Remote monitoring & diagnosis Maintenance simplified Spares easier to produce NEED TO FIND A WAY FOR: extra TTCrx chips for receivers PCR Experiments Sophie Baron TTC