GROUP 1 FINAL PRESENTATION

Slides:



Advertisements
Similar presentations
ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Advertisements

Presenter: Kenny Haulk
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
1 Labs 1 Prop-TX PA Coupler RF S W I T C H Components to be purchased Labs built 30 dB PNA Reference Input PNA RF Output RF/Attenuator Switch Controller.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Presenter: Allen Duncan April 10, Highlights of the Last Week Tested Receiver without optical link Used Al shield to determine EMI presence Conducted.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
ECE Group 2 – Presentation 8
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
GANTT CHART Text Text Example
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
ECE 4006 CAPSTONE DESIGN R.Y.M.M.Y Georgia Institute of Technology
Presenter: Chris Lambrecht
ECE 135 – Group 3 Presentation 1-2
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

GROUP 1 FINAL PRESENTATION Ragad Al-Huq Michael Fabery Mustansir Pratapgarhwala Yeonshin Won Dae-Geun Yoon

Week 1 Task Management Webmaster - Michael, Mustansir Budget Analysis and Ordering - Yeonshin Testing - Michael, Mustansir, Yoon Design – Michael, Mustansir, Ragad Building/Soldering – Yoon Alignment Tolerance & Analyisis – Mustansir, Yoon

Week 2 Test Receiver Board Results PRBS7 K 28.7

Week 3 – Optical Link Budget

Week 4 – Transceiver Schematic

Week 5 – Parts Ordered

Week 6 – Power Supply Filter

Week 7 – Final PCB Layout

Transceiver Boards Standard Design Aggressive Design

Week 8 – Receiver Testing Receiver Conservative PRBS7 Receiver Aggressive PRBS7 Conservative/Aggressive Receiver 5 dB

Week 9 – Tx Testing Conservative TX 0 dB Conservative Tx 5 dB Aggressive Tx 0 dB Aggressive Tx 5 dB PRBS7

Week 10 Loopback Testing Aggressive Design Conservative PRBS7 0 dB Aggressive PRBS7 0 dB Aggressive D21.5 5 dB

Week 10 – Alignment Tolerance Bad Results D21.5 0 dB PRBS7 0 dB K28.5 0 dB

Week 11 – Alignment Tolerance Good Results Rx 0 dB D21.5 Rx 0 dB PRBS7 Rx 0 dB K28.5

Week 12 – Shielding 1 of 3 K28.5 Before Shielding 5 dB PRBS7 Before Shielding 5 dB K28.5 After Shielding 5 dB PRBS7 After Shielding 5 dB

Week 12 – Shielding 2 of 3 K28.5 Before Shielding 10 dB PRBS7 Before Shielding 10 dB K28.5 After Shielding 10 dB PRBS7 After Shielding 10 dB

Week 12 – Shielding 3 of 3 K28.5 Before Shielding 15 dB PRBS7 Before Shielding 15 dB K28.5 After Shielding 15 dB PRBS7 After Shielding 15 dB

Alignment Tolerance

Final Gantt Chart

How Much? Quantities of 1000