UNC Modification Proposal 0229

Slides:



Advertisements
Similar presentations
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
In a not gate, if the input is on(1) the output is off (0) and vice versa.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0220 – “Invoicing Arrangements for Late Payments” National Grid (Distribution) Comments Chris Warner.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Demand Estimation Sub-Committee Climate Change Datasets - update 22 nd September 2014.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
PN UNC Workgroup Settlement topic 4 th October 2011.
UNC Modification Proposal 0229 Guidelines document.
UNCC 11 November 2013 Request for Clarification on AUG Rules Fiona Cottam.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
AND Gate Inputs Output Input A (Switch) Input B (Switch) Output Y (Lamp) 0 (Open) 0 (OFF) A B Lamp.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
UNC Modification Proposal 0192 National Grid Distribution Proposal 0182: “ Introduction of DNO obligations to facilitate resolution of unresolved USRVs”
Gas Performance Assurance Framework 11 th January 2013.
User Pays User Committee 12th November 2013
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Pentalateral Energy Forum & European Commission Meeting
Ofgem RIA – UNC Modification Proposal 0229
EXPERT SYSTEM OF THE HUNGARIAN SAPARD PAYMENT AGENCY.
Review of System Alerts
Modification Proposal 0192 – Draft Business Rules.
Chris Warner Network Code Manager
iGT Agency Services Background
Code Governance Review UNC Modification Proposals
Assignment Workshop 2 16th September 09, Solihull.
Definition of Project and Project Cycle
XRN 4695 Supporting Document High Level Plan
CSS Update for CoMC 19th September 2018
Theft on Shipper-less Sites
7th July 2011 Transmission Workgroup - Elexon
Chris Warner UNC Modification Panel 21 December 2017
Development of Firm Monitor & GBA
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
UNC Modification Proposal 0172 National Grid Distribution
UNC Modification Proposal 0362
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Topic raised at July 2009 Distribution Workstream
xoserve core + user pays discussion
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
MOD Deemed applications – User pays initial thoughts.
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
UNC Modification Proposal 0202 National Grid Distribution
PN UNC Workgroup Settlement Overview
Part of knowledge base of fuzzy logic expert system for exercise control of diabetics
Proposed Transitional Gas Exit Arrangements
PN UNC Workgroup (Settlement topic)
Modification proposal 330
Mark Freeman 29th January 2007
Proposer: Debbie Brace Panel Date: 20th March 2014
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
User Pays Principles and Governance
Options for Procurement of Gas Meter Temperature Lab Tests
DNO Obligations to Facilitate Resolution of Unresolved USRVs
DSS Concepts, Methodologies and Technologies
Entry Capacity Transfers - Constrained Period
UIG Task Force Progress Report
Gas Information Review Proposal UNC 0140
Dis 1208: Mod The ability and requirement for Users and Transporters to raise issues to be considered by the Allocation of Unidentified Gas Expert.
Modification 440 Project Nexus iGT Single Service Provision
UNC Modification 0229 Role of the UNC Committee
Transmission Workstream 05 November 2009
Presentation transcript:

UNC Modification Proposal 0229 Chris Warner

Modification Proposal 0229 Sympathetic to aims of Proposal: Allocation of Unallocated Gas Expert (AUGE) Allocation of Unallocated Gas Statement (AUGS) – logical approach Logic suggests that Users should have obligation to appoint an independent agent to become the AUGE Clarification of inputs from DNOs required i.e. data support, etc Identification of AUGS outputs to DNOs required together with invoicing instructions DNO support funded under User Pays

Modification Proposal 0229 If DNO responsible for AUGS, we would use xoserve xoserve develops AUGS based on expertise and information at hand. Reserves the right to use other sources Preparation of methodology based on ‘Reasonable Endeavours’ Sign off, revalidation process, triggers – need identification. User Pays Illogical and inefficient for DNOs to have obligation to appoint external agency. xoserve completely impartial in energy apportionment Unnecessary data ‘hand offs’ Potential for confusion of roles - data sourcing and interpretation (interface between xoserve and AUGE)