ARR : 2D Direct Rainfall Testing

Slides:



Advertisements
Similar presentations
Hydrology Rainfall Analysis (1)
Advertisements

Modeling of Flood Inundation in Urban Areas Including Underground Space Kun-Yeun Han, Gwangseob Kim, Chang-Hee Lee, Wan-Hee Cho Kyungpook.
1National Pluvial Flood Map for Scotland - Pascal Lardet ISIS FAST for national and catchment scale pluvial flood modelling – Application to national pluvial.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
STUDY OF THE STORM DRAIN SEWER OF THE URBAN CATCHMENT OF LA RIERETA, SAN BOI DE LLOBREGAT, SPAIN TEAM 3: 1. Aline Veról 2. José Rivero 3. Pedro Ramos 4.
Fort Bragg Cantonment Area Background The USGS is working with the U.S. Army at Fort Bragg to develop a Storm Water Pollution Prevention Plan (SWP3). The.
Forest Hydrology: Lect. 18
Geoffrey O’Loughlin Anstad Pty Ltd ADJUSTING RAINFALL DATA FOR CLIMATE CHANGE.
2012 Southwest Wildfire Hydrology and Hazards Workshop Evan Friedman and Dr. Paul Santi Colorado School of Mines 3 April 2012.
Development of a Hydrologic Model and Estimation of its Parameters Francisco Olivera, Ph.D., P.E. Department of Civil Engineering Texas A&M University.
Synthetic Unit Hydrographs
The Effect of Soil Hydraulic Properties and Deep Seepage Losses on Drainage Flow using DRAINMOD Debjani Deb 26 th April, 2004.
Overview of the Victorian Floods Trevor White Director Operations Victoria State Emergency Service APCO CONFERENCE 2011.
URBAN STORMWATER QUALITY AND LOAD ESTIMATION FROM URBAN RESIDENTIAL AREA IN SKUDAI, JOHOR, MALAYSIA Siti Nazahiyah Bte Rahmat Faculty of Civil and Environmental.
SUSTAIN Pilot Study April 25, 2012 Curtis DeGasperi King County
Contact us: I visit website: Aditya Urban Homes at NH-24 Ghaziabad.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
Bay Area Hydrology Model Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
HEC-HMS Runoff Computation.
FIRST REPORT TEAM 1: ANA CAROLINE PITZER JACOB JAIME TORRICO ACHA JONATAN ROBERTO VANESA LUCANA BARRAL TEAM 1 STUDY OF THE DRAINAGE NETWORK OF AN URBAN.
DONG DONG-A UNIVERSITY Historical Flood in in. 2 DONG-A UNIVERSITY Online Collaboration Web Platform Web Platform was used as part of the communication.
Western Washington Hydrology Model 2005 AWRA Annual Conference Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
Considerations for the blending of multiple precipitation datasets for hydrological applications Luigi Renzullo Research Scientist CSIRO Land & Water,
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Effects of Rain Water Harvesting on the Hydrograph Tyler Jantzen May 3, 2007 CE 394K.2.
September 2005Urban Planning Carleton University 1 Functional Planning Standards & Guidelines __________________________.
The revision of Australian Rainfall and Runoff: implications for floodplain managers Tony Ladson.
Flood damage models – Scope and limitations
DIAGNOSTIC AND ASSESSMENT OF A URBAN BASIN SEWER SYSTEM at Riereta, Sant Boi de Llobregat, SPAIN AVANCE REPORT Presentation Nº 1: “HYDRO LATIN AMERICA.
Introduction to the USEPA’s Storm Water Management Model (SWMM 5.0) David Rosenberg CEE 5460 – Water Resources Engineering.
Click Here Used Cars Spokane WA
Slides for John Quinn... Here are the author’s details...
Runoff.
Routing surface runoff to a basin outlet
Definition In scientific literature there is no universal agreement about the usage of the terms: digital elevation model (DEM) digital terrain model (DTM)
HEC-HMS Simulation Adding a detention pond at the outlet
Finishing Precipitation
Home Cleaning services in Delhi Home Cleaning services in Delhi.
CE 3372 Water Systems Design
Using GIS to Plan for and Mitigate Flooding on Tribal Lands
The Advantages of a Trial Balance Software
Natural Remedies to Cure Sore Muscle
Coursework guidelines
HOME PAGE PHOTO SLIDESHOW
Rainfall-Runoff Modeling
Website: Contact No: ID:
Neat Cleaning Services and House Maid in Chicago
City Council Meeting February 16, 2010
Infiltration Indexes 1-6-Infiltration-2
State Tax Credits – Brief Overview
Flood Forecasting as a tool for Flood Management
Surface Runoff and Hydrograph Components
Preciptation.
Love Field Modernization Program
CRWR-PrePro Calculation of Hydrologic Parameters
Preciptation.
Preciptation.
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Australian Rainfall & Runoff 2016 Update
Massage therapy from massage in South Yarra is great for working out problem areas like lower back pain and chronic.
Massage In South Yarra lemongrassthaimassage.com
Body Scrub South Melbourne - Lemongrass Thai Massage
Flood Inundation Mapping
Full Body Massage Melbourne Lemongrass Thai Massage
Contact Us For Massage And Spa Services In Melbourne
Massage Near St. Kilda Road- lemongrassthaimassage.com.
Presentation transcript:

ARR : 2D Direct Rainfall Testing Rob Swan Rhys Thomson

Supported By 2 2/05/2019

Overview The Questions: How does current best practice hydrological modelling for urban catchments compare with FFA? How do the results compare for models established independently?

Overview Background on the Catchments WA Vic Sensitivity Testing Assumptions Results Vic Sensitivity Testing

Study Areas

Study Area - WA Area = 8.2 ha TIA = 2.9ha

Area = 201.8 ha TIA = 121.5 ha Study Area - Vic

Available Information Data Set Victoria WA Pits and Pipes Only the trunk drainage system available, minimum 450mm diameter pipes The majority of pit and pipe data is available. Terrain LiDAR Aerial Photo Yes Flow gauge record length 1977 to 2012 (35yrs) 1983 to 1993 (10yrs)

WA – FFA Analysis

Vic – FFA Analysis

2D Direct Rainfall Testing Three modellers 2 based in NSW 1 Based in Victoria Their Mission: To create a Direct Rainfall model for each catchment, using best practice parameters Testing undertaken using 1987 IFDs

Assumptions - WA Parameter Modeller 1 Modeller 2 Modeller 3 Software Tuflow SOBEK Grid Size 2m Buildings Buildings “nulled”, rainfall increased to compensate Buildings raised (by 3m) Buildings “raised” (by 3m) Roughness Roads 0.018 0.015 Urban/ Residential 0.08 0.05 0.03 N/A 0.02 Open Space

Assumptions - WA Traditional Hydrology XP-SWMM model RORB model Both single catchment Losses Modeller 1 Modeller 2 Modeller 3 Tuflow XP-SWMM RORB SOBEK Scenario 1 Scenario 2 IL – imp (mm) 1 10 (1.5) 1.5 CL – imp (mm/hr) 2 (0) IL – per (mm/hr) 20 N/A (20) 30 CL – per (mm/hr) 3 N/A (5)

Results

WA-Results

Modeller 3 Currently looking for a good home Has computer, will model

Assumptions - Vic Allocated micro-sub areas Parameter Modeller 1 Scenario 1 Scenario 2 Software Tuflow SOBEK Grid Size 2m 3m Buildings Modelled with property roughness Buildings “raised” (by 3m) Buildings “nulled” Roughness Roads 0.018 0.015 Urban/ Residential 0.1 0.05 0.04 Medium Veg N/A 0.06 Open Space 0.035 0.03 Commercial Car Park 0.02

Assumptions - Vic Traditional Hydrology RORB model Used a previous established model, but converted to use IL/CL Losses Modeller 1 Modeller 2 Modeller 3 Tuflow RORB SOBEK Scenario 1 Scenario 2 IL – imp (mm) 7 (1.5) 1.5 CL – imp (mm/hr) 2 (0) IL – per (mm/hr) 15 N/A (15) CL – per (mm/hr) 2.5 N/A (4)

Results - Vic

Results - Vic

Sensitivity - Vic Modeller 3 Scenario 3 Scenario 4 Pre-wetted catchment to account for depression storage Scenario 4 Initial losses adjusted to account for depression storage

New IFDs Typical Changes Vic WA For less 1 hour duration, generally less than 5% difference (reduction) WA For 30min, less than 10% generally (reduction)

Contacts Email: arr_admin@arr.org.au Website: www.arr.org.au