Roxburgh Dam Combined Discharge of Spillway and Sluice into the same Chute Peter Silvester – Civil Engineer Contact Energy Grant Webby – Principal Hydraulic.

Slides:



Advertisements
Similar presentations
Who Wants To Be A Millionaire?
Advertisements

Lecture 8: Design of Erodible Channels
School of Civil Engineering/Linton School of Computing, Information Technology & Engineering Lecture 10: Threshold Motion of Sediments CEM001 Hydraulic.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Welcome to Who Wants to be a Millionaire
Sources of water (RAIN)
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
4. What is the boundary between two drainage basins called?
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
The Future of Wixom Lake
ORDER OF OPERATIONS LESSON 2 DAY 2. BEDMAS B – Brackets E – Exponents D – Division from left to right M – Multiply from left to right A – Add from left.
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Flood Profile Modeling with Split Flows and Weirs
1 A new concept for lifting spillway gates Bryan Leyland MSc, FIEE, FIMechE, FIPENZ Consulting Engineer New Zealand
Change of the flow state
Spillways Abdüsselam ALTUNKAYNAK, PhD Associate Professor,
The Probable Maximum Flood (PMF) is an event calculated by FERC to occur once every 10,000 years By comparison, the flood of September, 1986 was a 100-year.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Difference, Product and Quotient Functions
Probabilistic Volatility in the Western Interconnection Matthew Elkins.
Energy & Green Urbanism Markku Lappalainen Aalto University.
10 Year Old Topic 2 9 Year Old Topic 4 8 Year Old Topic 5 8 Year Old Topic 6 7 Year Old Topic 7 7 Year Old Topic 8 6 Year Old Topic 9 6 Year Old Topic.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Click your mouse to move the card ahead! Work with a buddy using two Abacuses. First click and follow along using your abacus. After each click talk about.
Week 1.
Let’s take a 15 minute break Please be back on time.
We will resume in: 25 Minutes.
Shiretoko Model Plans. Model Plan during Bear Activity Period (for groups of 20 or less) Alternative Course Day 1 12:40 Depart Utoro lunch location 12:50.
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 2-Year Flood (2320 cfs) Lady Bird Lake Inflow (1.25 ft/s) 9/9/20081ALDEN.
Sept 4, 2008CVEN 4838/5838Slide #1 Lecture 4 Spillways and Outlet Works.
Elements of Dam Engineering
1 I. Water Supply Networks and Facilities Topic I.4. River Water Intakes: Kinds and Structures Water Intake Kinds General classification: I. According.
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
Presented by:- 21. Kunal Kaklij. 22. Ritesh Kedare. 23. Kuldeep Kharjul. 24. Salman Khatik.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
Head works.
DAMS Dept. Of Civil Engineering
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Water resources engineering Giannis Kleopa. What is a water resources engineering? Water resources engineering is the profession that is responsible for.
Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 500-Year Flood (11,270 cfs) Lady Bird Lake Inflow (3.5 ft/s) at.
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
1. A generating station which utilized the potential energy of water at a high level for the generation of the electrical energy is known as a hydro-electric.
Control Structure Types
1  Cavitation در لغت به معنی حفره و بریدگی می باشد و یکی از پدیده های بسیار مهم در علم هیدرولیک می باشد.
HYDROLOGY & WATER RESOURCES ENGINEERING TYPES OF SPILLWAYS
1 Spillway Weirs and its Role in Dam Protection Husam Khaled Al Mubark Abdel Aziz Al Mesnd Roume Al Roume Abdullah Al Qashami Civil and Environmental Engineering.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
McNary Juvenile Fish Emergency Bypass System
Presentation transcript:

Roxburgh Dam Combined Discharge of Spillway and Sluice into the same Chute Peter Silvester – Civil Engineer Contact Energy Grant Webby – Principal Hydraulic Engineer Opus International Consultants

Roxburgh Dam - Location

Roxburgh Dam Commissioned 1956 50m high concrete gravity 320 MW power station Mean flow 507 cumecs PMF 7,000 cumecs

Roxburgh Dam Spillway Three Spillway Gates 15.2m wide x 13.4m high. Discharge capacity 4,750 cumecs Two diversion sluices 7.1m wide x 8.7m high. Discharge capacity 2,900 cumecs. Combined total discharge capacity 7,650 cumecs.

Roxburgh Dam Spillway Spillway chute 3 dewatered

Diversion Sluices Sluices 7.1m wide 8.7m high

Spillway – Sluice Long Section

Physical Hydraulic Model University of Auckland Tests covered: Sluice only operation - 25 Spillway only operation - 25 Combined operation - 125 Total tests 175

Physical Hydraulic Model Observations

Physical Hydraulic Model Results Maximum pressures along sluice

Physical Hydraulic Model Rooster Tails Sluice only operation

Gate Tests Jan 2013 Sluice 2 opened 6.77m (78%). Discharge 862 cumecs.

Sluice Gate Test

Conclusions Physical hydraulic model investigations supported by prototype testing have successfully proved for the Roxburgh Dam case that simultaneous discharge from a spillway gate and a low level sluice gate into the same chute is feasible and will produce smooth merged flow lines. For sluice only operation the discharge will not pressurise the sluice tunnel. Spillway only operation will pressurise the sluice tunnel only at high lake levels and gate openings greater than 40%. Combined spillway and sluice operation will pressurise the sluice tunnel only at high lake levels and spillway gate openings greater than 40%. The water levels induced in the sluice gate chamber by the back pressure from spillway only or combined spillway and sluice operation are unlikely to flood the middle gallery in the dam where the sluice gate controls are located. However further prototype tests are desirable to confirm the extreme water level values observed in the model tests. Although the sluice is back pressured by the spillway the discharge from the sluice is not reduced. ‘Rooster tail’ behaviour along each side wall at the sluice exit into the spillway chute could threaten the access bridge to the power station under high sluice only flow conditions at a high lake level. Roxburgh Dam can safely pass the PMF inflow using the combined discharge from both the spillway and sluice gates fully open at a lake level of RL 132.3m (I.e. with 1.2m freeboard).