News from the UWB Network

Slides:



Advertisements
Similar presentations
How to submit a Proposal Elisabeth COLINET. Conception Phase MAIN MILESTONES IN PREPARING A RESEARCH PROPOSAL Elaboration Phase Submission Phase.
Advertisements

Project Proposals Under FPx CECRA: answering INCO-2005-C-WBC/SSA-3 Malcolm Watson, MChem. Section for Chemical Technology and Environmental Protection.
André Imich, SEN and Disability Professional Adviser, DfE
12-CRS-0106 REVISED 8 FEB /3/20151 Fred Mintzer a candidate for 2016 IEEE President-Elect R4/R6 joint meeting San Diego, CA 24 January 2015 Fred.
On 22/07/ :39, Julie E Gray wrote: Dear Karen, I am interested in applying for WUN funding to allow me to visit and carry out experiments with the.
Managing an established facility: Scenarios for group work Kimmo Koski 26 October 2011.
CEENBoT ™ Educational Robotics Platform Dr. Bing Chen Computer and Electronics Engineering October 27 th, 2008.
Brown Bag Meeting  Dr. Rick Pollenz –  now Assoc. Dean, Undergraduate Studies  And Director of Undergraduate Research  Dr. Peter Harries.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
The Youth Music Programme Application and Assessment Process 2012.
Researchers on the move: international mobility for a successful career March 7th, 2013 An Jansen, Research Coordination Office.
Collaborative Counselor Training Initiative & Georgia Apply to College Program Rosalind Barnes Fowler Public Awareness & Outreach Director University System.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
Network of Excellence in Internet Science 1 st Review meeting Brussels, 12th April 2013 FP7-ICT EINS WP13 Dissemination and Cooperation.
RESEARCH AT THE UNIVERSITY OF CYPRUS. RESEARCH at UCY Research is based on two funding sources: University budget (state funding) Externally funded programmes.
WP2 Legal work Helle PEDERSEN Elisabeth KOHLER (CNRS)
STSM s Short Term Scientific Missions Report, Trieste Meeting Sep.12.
World Library and Information Congress, 72th. IFLA General Conference and Council Seoul, Korea, August 20-24, 2006 Jesús Lau, Ph.D.
Academic Research Enhancement Award (AREA) Program Erica Brown, PhD Director, NIH AREA Program National Institutes of Health 1.
2005 © SWITCH Perspectives of Integrating AAI with Grid in EGEE-2 Christoph Witzig Amsterdam, October 17, 2005.
Career Opportunities at CERN for students and recent graduates HBO lectoren visit SIA/CERN/NIKHEF Ingrid Haug Section Leader Students and Associates,
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
1. COLLEGE 2. WORLD OF WORK 3. MILITARY 4. PLANNED-GAP YEAR 5. PROPRIETARY TRAINING.
12-CRS-0106 REVISED 8 FEB 2013 Humanitarian Technology Activities 2015 IEEE Region 10 Meeting, Dhaka, 7- 8 March 2015 IEEE R10 HTA2015 Coordinator: Rajnish.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
CHARM Pre Commercial Procurement Support of Cooperative ITS Functions Ian Chalmers Highways Agency P4ITS Network Meeting Brussels Feb 2015.
2004 Forum Activities Meeting place Scientific forum events Network resource.
Status of QUACO project
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
Next Gen: Campus Collaboration. Campus Consultation – Summer through Fall 2013 – Help identify important characteristics of our Next Generation.
Universität für Bodenkultur Wien Dr. Margarita Calderón-Peter, ZIB Purpose of the fund for incentives 2.Procedure for applications for funding.
Wrap up and the road to formulation Brussels, 29 January 2016.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
CERN openlab Phase 5 Preparation (Technical) Alberto Di Meglio CERN openlab CTO office.
I n n o v a t i o n + T e c h n i k © VDI/VDE-IT Teltow/Berlin Experiences from the application procedure and the operation of an Integrated.
CSBS Faculty Workshop: Defining your Interests and Resources for Proposal Development CSBS: FRANCES SOLANO ORSP: JENNIFER REIFSNEIDER FEBRUARY 10, 2016.
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
Pre-Workshop on Intervention of Science and Technology in Traditional Crafts Date : 14 th Dec Venue : Seminar Hall, First Floor of S & H Building.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Robust and Adaptive Approaches to Scene and Object Recognition: An example of a successful cooperative Project Horst Bischof Inst. f. Graphics and Vision.
MICE Project in the US: Completion of Efforts
Project Planning Committee Closing Report (Session #76)
APS Strategic Plan Steering Committee
Student Information System (SIS) Project
STIMULATE/INASP Workshop: Accessing Information in Developing Countries - Introduction Accessing Information in Developing Countries.
What’s new at CCGI? October 2017.
WMO Global Multi-Hazard Alert System
IEEE Career Resources and Benefits
Activities of the UNECE-UNODC Task Force on Victimization Surveys
<month year> doc.: IEEE < e>
Faculty Activity Reporting
Results of the 2nd year of the program Title
Possible liaison motion for IEEE as an IMT-2020 technology
How to apply.
SFC2007 Project Status ESF Committee 22 September 2006
Authentication Cluster
Authentication Cluster
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
GN2 JRA5 Roaming and Authorisation Jürgen Rauschenbach, DFN-Verein
QoLT project review plan
Gavilan Guided Pathways Update Fall 2017
Erasmus+ KA2 project: Enhancement of study programs in Public Health Law, Health Management, Health Economics and Health Informatics in Montenegro Administration,
SCALING UP CAPACITY ENHANCEMENT: BID, BIFA AND SUPPLEMENTARY FUNDING
May 19 doc.: IEEE /424r1 July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4a Opening/Closing.
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
Next steps for European Consortium
Implementing the ESPON 2013 Programme
OBJECTIVES AND STRUCTURE OF THE MEETING
Presentation transcript:

News from the UWB Network News from prototype development Publications IEEE ICUWB 08 deadline Feb 10, 2008 Nanotera initiative C. Dehollain participates in proposal 1

Next Meetings MICS scientific conference January 21-23, 2007 All PhD students and faculty funded by MICS expected to participate Final version of demo I will give a report on the work of the UWB network Please send me any graphical + video material before Dec 19 at the latest 2

MICS Phase 2: Prototype Development We need to define the goals of the prototype development effort for the coming 2 years; final decision should be made end of January Ideally, should prepare the way to MICS phase 3 Three possible directions were mentioned already Interference testbed Mobile robots with ranging collaboration with EPFL ENAC Crypto modulation / authenticated ranging collaboration with MICS Cluster 3 3

MICS Phase 3 MICS phase 2 ends October 2009 There will likely be a MICS phase 3 Of a different nature Make $$$$ value $$$$ out of the research UWB network is a large project within MICS Proposal Produce a coordinated portfolio of patents Ownership remains with home institution (EPFL, ETHZ, CSEM, HES-SO) But can be sold / licensed as a package Requests for funding in MICS phase 3 will be in priority given to groups that Have contributed to patents Plan to do more 4