CEMSIS FIKS-CT-2000-00109 Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, wp6_beg037_v0_2_fisa 2003 slides.ppt.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
 Road Safety the European Union Policy Carla Hess European Commission, Directorate General for Mobility & Transport Road.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
No: 1 CEMSIS wp6_beg010_v0_1_fisa slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk Pavey,
Introduction to Software Quality Assurance (SQA)
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
No: 1 CEMSIS 1 WP3 - Use of pre-developed products Key issues N. Thuy EDF R&D.
Tom MAZOUR IAEA, Division of Nuclear Power
IAEA - Department of Nuclear Safety & Security
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
No: 1 CEMSIS wp6_beg037_v0_2_fisa 2003 slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk.
1 Introduction to Software Engineering Lecture 1.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
27/3/2008 1/16 A FRAMEWORK FOR REQUIREMENTS ENGINEERING PROCESS DEVELOPMENT (FRERE) Dr. Li Jiang School of Computer Science The.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 Post FISA-2003 Workshop Cost Effective Modernisation of Systems Important to Safety CEMSIS (Luxembourg, 13 Nov. 2003) Regulatory Aspects F. Seidel (Federal.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
No: 1 CEMSIS wp6_beg022_v0_4_intro slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
 ROAD SAFETY: the European Union Policy European Commission, Directorate General for Mobility & Transport «Road Safety.
Kick Off Meeting Largs, Scotland
Transmitted by the representative of the
Session 3 General RIA Training 6–8 July 2009 EuropeAid/125317/D/SER/TR
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Documentation needed to support a software safety case P.-J. Courtois
Evaluation of Priority Gender Equality
EIA approval process, Management plan and Monitoring
Integrated Management System and Certification
Software and Systems Integration
EERA e3s and Energy Consumers
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
National Contact Points (NCP) Training
Safety Culture Services
Food Production Systems
ASSTAR Project Overview & User Forum Objectives
BU IS GIG Chemical, Oil & Gas
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Eurostat Quality Management (in the ESS context)
Gender Equality Ex post evaluation of the ESF ( )
FOOD AND VETERINARY OFFICE
Communication and Consultation with Interested Parties by the RB
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
Investing in ES Research: MARKET , FUNDING , POLICIES
URBAN STREAM REHABILITATION
Safety Management System Implementation
AMICI WP1 – Management, coordination and dissemination
Development of a protocol for identification of reference conditions, and boundaries between high, good and moderate status in lakes and watercourses (REFCOND)
Functional Safety Expert
CORA ESSNet COmmon Reference Architecture starting ...
Leading Practice Implementation Guide
Portfolio, Programme and Project
The European Statistics Code of Practice - a Basis for Eurostat’s Quality Assurance Framework Marie Bohatá Deputy Director General, Eurostat ... Strategic.
Leading Practice Implementation Guide
European Commission, DG Environment Air & Industrial Emissions Unit
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
National Commission for Nuclear Activities Control
Fitness Check EU Water Policy
ESS.VIP Validation Item 5.1
Guidelines on the Mid-term Evaluation
Wind energy & EU legislation for Nature conservation
Training module 8 Adoption of territorial assessment tools
ESSNet SERV 2 Implementing Shared SERVices
© Fresh Thoughts Consulting
Meeting Water Directors
Presentation transcript:

CEMSIS FIKS-CT-2000-00109 Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, wp6_beg037_v0_2_fisa 2003 slides.ppt

wp6_beg037_v0_1_fisa 2003 slides.ppt CEMSIS Objectives Programmable Instrumentation and Control (I&C) safety systems (e.g. protection) safety-related systems (e.g. control, data presentation) Common approach to development and safety justification maximise safety minimise cost Modernisation/Refurbishment analogue/discrete logic replacement with computer-based systems wp6_beg037_v0_1_fisa 2003 slides.ppt

‘Stakeholders’ in CEMSIS Nuclear Plant Operators British Energy (co-ord.) UK electricity generation Electricite de France F electricity generation British Nuclear Fuels UK nuclear fuel processing Suppliers & System Integrators Framatome ANP DE C&I supplier CarlBro (Sycon International) SE system developer Safety Authorities & Assessors AV Nuclear B inspection & licensing Adelard UK safety consultancy SKI SE inspection & licensing Academic: TU Lund SE research & education wp6_beg037_v0_1_fisa 2003 slides.ppt

wp6_beg037_v0_1_fisa 2003 slides.ppt Key Issues Harmonisation & Structuring of Safety Justification approaches Definition of Requirements for Systems Important to Safety Use of Pre-Existing Software in Systems Important to Safety potentially including class A systems Use of Languages & Tools in Systems Important to Safety wp6_beg037_v0_1_fisa 2003 slides.ppt

CEMSIS Modernisation Context Regulator Final Licensing / Approval Safety Justification Regular communication and informed comment User requirements process Requirements document SIS specification Tendering Negotiation & Acceptance Amended SIS Safety Justification Plan Discuss/ Agree Normal operation and maintenance Acceptance & Phased Introduction Utility 4 Project viability Pre-qualification (independent assessor) 1 2 Test and Verification SW Development SIS Implementation Decomposition & Design Validation Installation & Site Commissioning 3 Supplier Key: = Work Package Number wp6_beg037_v0_1_fisa 2003 slides.ppt

Work Packages and Deliverables Safety Justification Survey and Framework Framework WP1 WP5 Public Domain Example Report Case Studies: UK: fuel reprocessing F: PWR I&C replacement SE: safety monitoring + Public Domain Example Requirements Capture Survey and Lifecycle Guidelines WP2 Pre-Existing S/W Strategy & Techniques Guidelines WP3 Languages & Tools Review and Evaluate WP4 WP0,6 Management and Dissemination wp6_beg037_v0_1_fisa 2003 slides.ppt

Safety Justification Framework Take account of current EU experience EC NRWG Task Force on Safety Critical Software (ARMONIA) Survey shows no systematic method used in Member States Pragmatic framework for cost-effective safety justification Elicit and organise disparate claims and evidence Allow modularity and reuse of elements of previous cases Deal with system models at different levels: plant: hazards/threats identified in a valid manner architecture and design: SIS correctly implements safety function operation: SIS behaviour remains valid wp6_beg037_v0_1_fisa 2003 slides.ppt

wp6_beg037_v0_1_fisa 2003 slides.ppt 0: initial claim 1: plant-SIS interface 2: architecture 3: design 4: operation claims evidence re-used justification Weight of evidence; Shows: - missing evidence; - evidence with the largest weight (number and levels of supported claims) wp6_beg037_v0_1_fisa 2003 slides.ppt

wp6_beg037_v0_1_fisa 2003 slides.ppt Requirements Capture Survey of requirements techniques, research and experience. 84 available techniques identified & classified in current use: interviews, documents, reviews, checklists Requirements process for refurbishment guide requirements engineering process - ‘modernisation oriented’ claim-based view - link to safety justification framework set of stakeholders or viewpoints - completeness wp6_beg037_v0_1_fisa 2003 slides.ppt

wp6_beg037_v0_1_fisa 2003 slides.ppt Requirements Process wp6_beg037_v0_1_fisa 2003 slides.ppt

Pre-existing Software Including “COTS” (Commercial Off The Shelf) Strategy: Two phases “Pre-qualification” - reduce uncertainty and delay provide evidence in advance for all applications Application Qualification - some always needed provide evidence specific to one application Types of assessment Functional - ensure features of product are adequate for safe use Dependability - evidence that the product is sufficiently reliable taking account of its safety class wp6_beg037_v0_1_fisa 2003 slides.ppt

COTS taxonomy & strategies white-box grey-box black-box experience in operation no yes no yes yes no Class A B criticality high med low complexity A-WB A-BB B-GB B-BB Properties essential to safety: characterisation functional adequacy correctness robustness maintenance Partially addressed during pre-qualification wp6_beg037_v0_1_fisa 2003 slides.ppt

Application and Evaluation Case Studies: UK Nuclear fuel reprocessing plant control BNFL I&C replacement on a French PWR EDF Safety monitoring system on a Swedish NPP CarlBro Public domain nuclear material transport example Adelard Identify safety and cost-relevant aspects safety requirements implementation options example arguments for safety justification Evaluate and refine guidance documents wp6_beg037_v0_1_fisa 2003 slides.ppt

wp6_beg037_v0_1_fisa 2003 slides.ppt Continuing Influence Public and Limited Circulation Deliverables Use within members organisations and member states Dissemination by web-site http://www.cemsis.org Post-FISA workshop no.4, 13 November Members participation in international activities International standards, e.g. IEC 60880 and 61508 revision European Nuclear Regulators Working Group Electric Power Research Institute (EPRI) Continuing research, possibly under Framework VI wp6_beg037_v0_1_fisa 2003 slides.ppt

wp6_beg037_v0_1_fisa 2003 slides.ppt Conclusion On target to provide practical guidance illustrated with realistic examples. Key audience: Senior I&C engineers and managers of refurbishment projects Development engineers and managers in the supply industry SMEs and service companies in the refurbishment market Regulators and policy makers Impact on strategy: Accelerate inter working in member states between utilities, suppliers and regulators Help to focus national R&D efforts wp6_beg037_v0_1_fisa 2003 slides.ppt