Alternative Determination of Head Impact Time (HIT)

Slides:



Advertisements
Similar presentations
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Advertisements

Ensuring Robustness via Early- Stage Formal Verification Multicore Power Management: Anita Lungu *, Pradip Bose **, Daniel Sorin *, Steven German **, Geert.
1 1 Slide © 2009 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
GTR Head restraints ES Page 1 HR-7-8 GTR Head restraints Dynamic test procedure Trigger-point in dynamic test procedure.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
1 1 Slide Hypothesis Testing Chapter 9 BA Slide Hypothesis Testing The null hypothesis, denoted by H 0, is a tentative assumption about a population.
Chapter 1 Introduction The solutions of engineering problems can be obtained using analytical methods or numerical methods. Analytical differentiation.
School of Computing, Dublin Institute of Technology.
Responding to Inspection Findings
The Data Attribution Abdul Saboor PhD Research Student Model Base Development and Software Quality Assurance Research Group Freie.
NORMAN Databases Collection of data for EMPODAT – key issues Environmental Institute, Koš, Slovakia.
Guendel – Germany – Session 5 – Paper Risk Based Asset Management Decision Support and Comparison of Solution Alternatives.
New Product Development Management NPDM 4 Mohsen SADEGHI Department of Graduate School of Management and Economics Sharif University of Technology.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
1 1 Slide IS 310 – Business Statistics IS 310 Business Statistics CSU Long Beach.
Lecture 7: Requirements Engineering
MODES-650 Advanced System Simulation Presented by Olgun Karademirci VERIFICATION AND VALIDATION OF SIMULATION MODELS.
1 Getting Started : Purposes of IS Strategic Planning.
German Electricity Association (VDEW) ·Za1 · Alexander Zafiriou German Electricity Association (VDEW), Berlin Proposal for an alternative approach.
UNIT 5.  The related activities of sorting, searching and merging are central to many computer applications.  Sorting and merging provide us with a.
Introduction to Revision of GTR 7
NEDC/WLTP correlation process Meeting of TCMV on 17 November 2015
Task Force CoRD Meeting / XML Security for Statistical Data Exchange Gregory Farmakis Agilis SA.
Algorithms For Solving History Sensitive Cascade in Diffusion Networks Research Proposal Georgi Smilyanov, Maksim Tsikhanovich Advisor Dr Yu Zhang Trinity.
The Engineering Design Process
Development of Decision Support Tools for brownfields and contaminated sites management and redevelopment [Bezama, A.; Navia, R.; Novak, J. & Lorber, K.
Marketing Plan Implementation Assessment Tool Longer Term Low PriorityDon’t Bother Immediate Impact Ease of Execution HighLow High Implementation Matrix.
Database Testing Gourav Mehta (Associate QA Engineer)
Pedestrian Safety Request For Clarification Of Test Procedures 49 th Session of UNECE GRSP, Geneva, 16 – 20 May 2011 Informal document GRSP (49th.
Introduction to Machine Learning, its potential usage in network area,
Chapter 9 -Hypothesis Testing
Slides by JOHN LOUCKS St. Edward’s University.
Red Line Customer Capacity Update
Skype 24/7 Support : BroadNet-SMS Lebanon : /1/2 Dubai : London :
OICA input on software updates to UN TF CS/OTA
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
PROBLEM SOLVING MODULE
Revitalization of gaseous transmission functions in ACRANEB radiation scheme using RRTM as database Tomas Kral CHMI.
UN Task Force on Cyber Security and OTA issues
Raytheon Parts Management
OICA Proposal: Decision on Deployed Testing of DPPS
Principles for a robust MRV System Lessons learnt from Kyoto Mechanisms Workshop 15: Accounting and accountability: Towards a credible and robust carbon.
ACEA Comments to Commission’s note of April Editing Board
Applicable Areas Business Logic Case Presentation Cost Design
Proposal for a mid vehicle concept
Summary of software update progress
Submitted by the expert from Republic of Korea
Feed-back approach on RLD
IVECO Proposal for Revised CoP Procedure
Draft WLTP Phase 2 – carryover from 1b – Annex 4 Starting note on split runs in coast down testing WLTP-14-18e Within phase 1b, practically all tolerances.
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Introduction to Revision of GTR 7
Conformity of Production (COP)
Chair: Jin Seop Park, Republic of Korea Secretary: Irina Dausse, OICA
TS Training Presented by: Internal Auditor Training.
Japan Automobile Standards Internationalization Center (JASIC)
Test Procedure of Deployable Systems for Pedestrian Protection
Collecting methodological information on regional statistics
IWG-DPPS/4/04 Proposal for System Information Requirement with regard to Deployable Pedestrian Protection Systems 4th meeting, March 2019 OICA, Paris.
Module IV Memory Organization.
Co2 veHICLE test Feedback on three options for implementation of the test The purpose of the test is to increase the credibility of the simulation based.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
(Task 43 of the IWG Task List)
Comparison of OICA and Korea Synchronisation Processes
ENabling SafE Multi-Brand Platooning for Europe
Test Procedure for Pedestrian Dummy to calculate HIT
(Task 27 of the IWG Task List)
A handbook on validation methodology. Metrics.
IWG-DPPS Investigation of Test Condition in Overshoot Duration
Presentation transcript:

Alternative Determination of Head Impact Time (HIT) Dirk-Uwe Gehring BGS Böhme & Gehring GmbH 4th meeting of TF-DPPS, Berlin, Germany, 21-23 November 2017

Motivation Two issues where the head impact time (HIT) is necessary: Requirement for active bonnets: The total response time (TRT) of the deployable bonnet system must be compared with the HIT of the pedestrian Physical testing with activated deployable system: HIT is necessary for the correct timing between activating the bonnet deployment and triggering the headform propulsion system. Determination of HIT only possible during simulation TF-DPPS Meeting Minutes of Sept 9, 2017: „There was no suggested alternative to replace the simulation method for HIT” But: Verification of simulation difficult for third parties (technical services, authorities, etc.) Usually vehicle simulation model not provided by OEM If vehicle simulation model provided by OEM: No possibility to verify the properties of the provided model with reasonable efforts

Considerations Currently no possibility to measure the exact HIT for any possible impact point in physical tests Exact HIT measurement not necessary: Evidence is needed that HIT is less than TRT HIT mainly depending on bonnet leading edge height (BLEH), bonnet angle (BA*) and the wrap around distance (WAD) of the test point A database consisting of the BLEH, BA, WAD and HIT for a high number of test points on different vehicles could provide a possibility to approximate the HIT for a new vehicle/test point Several vehicles with deployable bonnets currently on the market HIT for numerous test points already at manufacturer‘s databases * BA is determined by a line between a point on the bonnet leading edge reference line and a point on the bonnet rear edge, with both points at the same Y-position

Solution Establishment of a database consisting of datasets with BLEH, BA, WAD and HIT, no vehicle type information necessary Filling of the database with data provided by vehicle manufacturers and possibly other sources (authorities, technical services, consumer organisations, …) Creation of an algorithm to determine the HIT based on the BLEH, the BA and the WAD of a test point Usage of the database in order to achieve a close approximation of a realistic HIT after stating BLEH, BA and WAD of test point

Procedures Issue 1: TRT vs. HIT: TRT is measured, e.g. by video analysis of impact tests with a pedestrian object (e.g. dummy, legform, …) Measurement of WAD of the test point as well as BLEH and BA at the Y-position of the test point HIT is obtained by means of the database Comparison of HIT and TRT If TRT > HIT, the test is performed with activated bonnet Issue 2: Triggering in activated tests: Propulsion system is triggered accordingly

Advantages The comparison between HIT and TRT as well as all headform testing can be performed without simulation, i.e. without information exchange between OEM and test institute (although desirable) The HIT-related parameters for headform testing can also be obtained easily Decision between testing in deployed state or with activated bonnet Triggering time information for the headform propulsion system Database can always be checked, verified and updated Datasets will be added continuously to improve the approximation If necessary, a correction factor (5%?) can be added for the first (5?) years of implementation

Thank you