- TFC status - Switch / RS

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
LHCb DAQ Review, September LHCb Timing and Fast Control System TFC Team: Arek Chlopik, Warsaw Zbigniew Guzik, Warsaw Richard Jacobsson, CERN Beat.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
TFC Partitioning Support and Status Beat Jost Cern EP.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Federico Alessio Zbigniew Guzik Richard Jacobsson TFC Team: A Super-TFC for a Super-LHCb - Top-down approach -
Upgrade to the Read-Out Driver for ATLAS Silicon Detectors Atlas Wisconsin/LBNL Group John Joseph March 21 st 2007 ATLAS Pixel B-Layer Upgrade Workshop.
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
LHCb front-end electronics and its interface to the DAQ.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
SunSatFriThursWedTuesMon January
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
CERN Richard Jacobsson, CERN LEADE meeting, March 29, Physics trigger RS TFC SwitchThrottle OR/Switch VELO FEST FEOT FE Clock Orbit Clock Orbit.
CERN F. Alessio & R. Jacobsson CERN LHCb Electronics Upgrade Meeting, April 15, LHCb Upgrade Front End  Back End Readout Architecture Proposal.
18/05/2000Richard Jacobsson1 - Readout Supervisor - Outline Readout Supervisor role and design philosophy Trigger distribution Throttling and buffer control.
CERN TFC status review, January 21, TFC status review l Agenda  Overview  Common solutions  TFC simulation framework  TFC Switch ‘THOR’  Throttle.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Grzegorz Kasprowicz1 Level 1 trigger sorter implemented in hardware.
SuperB-DCH S ervizio E lettronico L aboratori F rascati 1LNF-SuperB Workshop – September 2010G. Felici DCH FEE STATUS Some ideas for Level 1 Triggered.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Common Readout Unit (CRU) workshop CERN Mars 2016
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
Status of NA62 straw readout
LHC1 & COOP September 1995 Report
E. Hazen - Back-End Report
Realising the SMP 1. Safe Machine Parameters Overview
Alberto Valero 17 de Diciembre de 2007
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
Richard Jacobsson, CERN
Christophe Beigbeder PID meeting
DCH FEE 28 chs DCH prototype FEE &
TELL1 A common data acquisition board for LHCb
Status of the Beam Phase and Intensity Monitor for LHCb
ALICE Trigger Upgrade CTP and LTU PRR
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
CMS EMU TRIGGER ELECTRONICS
MicroTCA Common Platform For CMS Working Group
TTC system and test synchronization
Trigger system Marián Krivda (University of Birmingham)
Throttling: Infrastructure, Dead Time, Monitoring
The CMS Tracking Readout and Front End Driver Testing
Status of CC-PC Evaluation Board
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
Sector Processor Status Report
TELL1 A common data acquisition board for LHCb
Presentation transcript:

- TFC status - Switch / RS RO meeting 15/11/2000 Richard Jacobsson

RO meeting 15/11/2000 Richard Jacobsson

All switches TFC switch Design will change slightly: - Sandwich idea dropped --> no intermodule bus - ECS interface on each switch - Fitted on FB board instead of VME --> More board space --> More front panel space - Everything 5V - Verify skew and jitter - Buy MUXes TFC switch RO meeting 15/11/2000 Richard Jacobsson

Throttle switches RO meeting 15/11/2000 Richard Jacobsson

RS functions - Clock distribution(TTC) - L0 distribution - Trigger controller Trigger controller Throttles - ECS interface ECS interface ECS L0 - L0 distribution L1 - L1 distribution - Clock distribution(TTC) TTC encoder Ch A/B LHC clock - Auto-trigger generator Trigger generator - Reset/cmd generator Reset/command generator - “RS Front-End” RS Front-End L0/L1 DAQ RO meeting 15/11/2000 Richard Jacobsson

- Open to new technology - Aiming for flexibility in HW --> change/add/remove RO meeting 15/11/2000 Richard Jacobsson

Summary Switches settled on Readout Supervisor Review successful Some layout changes to be made Fit ECS interface Making prototypes in January-February 2001 Readout Supervisor Specifications sent to all detector people Design in progress, very productive month with Zbig Most of the important “blocks” designed (first version) and simulated. Missing: Reset controller, counters, throttle history, Random generators, RS F-E, ECS interface Looking for novelties on the FPGA side Combined simulations of several blocks to be worked on Staged review, first in March - April RO meeting 15/11/2000 Richard Jacobsson