Cal DQM Report 11/26/03 – 12/03/03.

Slides:



Advertisements
Similar presentations
R. Zitoun, Stony Brook and LAPP CTF Meeting10 February Much Noise About Nothing? Robert Zitoun Stony Brook and LAPP CTF Meeting February 10, 2003.
Advertisements

Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
RECENT CAL PROBLEMS (including DQM person confusions) and DQM SHIFT TODO REMINDER T. Schörner-Sadenius Hamburg University CAL Meeting, 11 January 2005.
Ricardo GoncaloZEUS Week - London June Neutral Current 99/00 e + p Analysis Status Ken Long Matthias Moritz Henning Scnurbusch Ricardo Gonçalo Thanks.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
1 TPC online  offline calibration November 2002.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
CAL and SUBCOMPONENTS STATUS OVERVIEW T. Schörner-Sadenius Hamburg University, on behalf of the CAL group ZEUS Meeting DESY 28 February – 4 March 2005.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
CAL OVERVIEW and DATA QUALITY REPORT T. Schörner-Sadenius Hamburg University ZEUS Meeting DESY 28 February – 4 March 2005.
Calibration of the ZEUS calorimeter for electrons Alex Tapper Imperial College, London for the ZEUS Collaboration Workshop on Energy Calibration of the.
CAL DQM February 2004 Thomas Schörner-Sadenius DESY, 25 February 2004.
Friday Oct 30Monday Nov Data09_cos Data09_calophys Data09_cos Data09_calophys Data09_calophys Some of the last.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
SLAC, HiRes T-461: “FLASH” part 1 Justin Findlay.
CAL OVERVIEW and DATA QUALITY REPORT T. Schörner-Sadenius Hamburg University ZEUS Meeting Padova, October 2004.
CAL DQM REPORT T. Schörner-Sadenius Hamburg University CAL/HES Meeting, 4 January 2005.
RUN COORDINATOR’S REPORT 1-8 May 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 8 May 2006.
CAL CALIBRATION Overview and Stability Thomas Schörner-Sadenius Hamburg University ESCALE Meeting DESY, 7 June 2005.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Jennifer Thompson Western Michigan University Fermi National Accelerator Lab PST Program July 29, 2008 Mentors: Steve Hahn and JJ Schmidt.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
CAL SHIFT MARCH 2004 Thomas Schörner-Sadenius Hamburg University CAL Meeting DESY 24 March 2004 Think carefully whether you consider being on shift.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
DQM SHIFT TODO REMINDER T. Schörner-Sadenius Hamburg University CAL Meeting, 18 January 2005.
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Cal DQM Report 3/03/04 – 3/10/04. What was done March 3-4: Access March 5-6 : Machine studies.
CAL DQM January 2004 Thomas Schörner-Sadenius DESY, 28 January 2004.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Calorimeter Status Electronics Installation and Commissioning
Calibration Status Energy Calibration Stabilities/instabilities
2009: restart the system: few observations. Hw maintenance week:
20 Oct 2014: HV Trip? K. Andeen 21 Oct 2014.
Week coordinator report - C. Marchand
CAL DQM Report June 2nd – June 9th.
Online Calibration Online calibration: validation: L3fCalCalibTool –
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Cal DQM Report July 7 – July 14, 2004.
Status report Minjung Kim
E. Garutti - Main Meeting
Current status Minjung Kim
Laser Software Status and Comments on Concerns
B904 Status Report by Fred B.
Presentation transcript:

Cal DQM Report 11/26/03 – 12/03/03

“Mained” new calib version 3301 What was done Nov. 26 Used cal_quick calib #46204 to update bad channels and UNO scale factors “Mained” new calib version 3301 Total number of CAL bad channels for version 3301 is 296 They break down as follows: FCAL BCAL RCAL Total FEC 30 20 6 56 UNO 48 97 22 167 Qinj 8 3 43 54 PED 14 5 0 19 Total 100 125 71 296 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b 11 16 14 560E 12 1 7 0 4005 UNO mean is too low b 11 16 20 560F 12 1 7 1 4005 UNO mean is too low 1 holes Total number of SRTD bad channels for version 3301 is 5 Ca Crt Crd Chn PMT Code Message r 6 14 1 944 22 Pipeline pedestal spread r 6 14 2 958 23 Buffer pedestal spread r 6 14 3 96C 22 Pipeline pedestal spread r 6 14 4 980 23 Buffer pedestal spread r 6 14 11 8EA 47 Buffer gain Total number of FNC bad channels for version 3301 is 0 Total number of PRES bad channels for version 3301 is 1 r 11 2 43 10E0 61 Alpha high gain Total number of PRT bad channels for version 3301 is 0 Total number of LED bad channels for version 3301 is 0 Total number of BPRE bad channels for version 3301 is 0 Total number of TDI bad channels for version 3301 is 0

What was done Nov. 27 FEC Updated bad channels, version 3302 Total number of CAL bad channels for version 3304 is 235 They break down as follows: FCAL BCAL RCAL Total FEC 37 2 7 46 UNO 49 87 24 160 Qinj 4 2 1 7 PED 17 5 0 22 Total 107 96 32 235 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b 11 16 14 560E 12 1 7 0 4005 UNO mean is too low b 11 16 20 560F 12 1 7 1 4005 UNO mean is too low 1 holes Total number of SRTD bad channels for version 3304 is 5 Ca Crt Crd Chn PMT Code Message r 6 14 1 944 65 Nonlinearity r 6 14 2 958 65 Nonlinearity r 6 14 3 96C 22 Pipeline pedestal spread r 6 14 4 980 42 Pipeline gain spread r 6 14 11 8EA 65 Nonlinearity Total number of FNC bad channels for version 3304 is 0 Total number of PRES bad channels for version 3304 is 1 r 11 2 43 10E0 65 Nonlinearity Total number of PRT bad channels for version 3304 is 0 Total number of LED bad channels for version 3304 is 0 Total number of BPRE bad channels for version 3304 is 0 Total number of TDI bad channels for version 3304 is 0 Nov. 27 FEC Updated bad channels, version 3302 Created FEC version 3303 Updated bad channels to get version 3304 1 round of trimming “Mained” version 3304 Updated UNO scale factors

What was done Nov. 28 No cal_quick calib, no beam loss Nov. 29 Nov. 30 Total number of CAL bad channels for version 3305 is 272 They break down as follows: FCAL BCAL RCAL Total FEC 37 2 7 46 UNO 52 92 24 168 Qinj 15 19 2 36 PED 17 5 0 22 Total 121 118 33 272 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b 11 16 14 560E 12 1 7 0 4005 UNO mean is too low b 11 16 20 560F 12 1 7 1 4005 UNO mean is too low b 3 1 13 706C 25 7 6 0 4005 UNO mean is too low b 3 1 19 706D 25 7 6 1 3005 DSP Qinj mean too low 2 holes Total number of SRTD bad channels for version 3305 is 5 Ca Crt Crd Chn PMT Code Message r 6 14 1 944 65 Nonlinearity r 6 14 2 958 65 Nonlinearity r 6 14 3 96C 22 Pipeline pedestal spread r 6 14 4 980 42 Pipeline gain spread r 6 14 11 8EA 65 Nonlinearity Total number of FNC bad channels for version 3305 is 0 Total number of PRES bad channels for version 3305 is 1 r 11 2 43 10E0 65 Nonlinearity Total number of PRT bad channels for version 3305 is 0 Total number of LED bad channels for version 3305 is 0 Total number of BPRE bad channels for version 3305 is 0 Total number of TDI bad channels for version 3305 is 0 Nov. 28 No cal_quick calib, no beam loss Nov. 29 Nov. 30 cal_quick calib # 46253, updated B.C’s and UNO scale factors “mained” version 3305

What was done Total number of CAL bad channels for version 3308 is 238 They break down as follows: FCAL BCAL RCAL Total FEC 37 2 7 46 UNO 52 89 23 164 Qinj 9 4 2 15 PED 9 4 0 13 Total 107 99 32 238 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b 11 16 14 560E 12 1 7 0 4005 UNO mean is too low b 11 16 20 560F 12 1 7 1 4005 UNO mean is too low 1 holes Total number of SRTD bad channels for version 3308 is 5 Ca Crt Crd Chn PMT Code Message r 6 14 1 944 65 Nonlinearity r 6 14 2 958 65 Nonlinearity r 6 14 3 96C 22 Pipeline pedestal spread r 6 14 4 980 42 Pipeline gain spread r 6 14 11 8EA 65 Nonlinearity Total number of FNC bad channels for version 3308 is 0 Total number of PRES bad channels for version 3308 is 1 r 11 2 43 10E0 65 Nonlinearity Total number of PRT bad channels for version 3308 is 0 Total number of LED bad channels for version 3308 is 0 Total number of BPRE bad channels for version 3308 is 0 Total number of TDI bad channels for version 3308 is 0 Dec. 1 Tried to do a trimming without recent FEC-problems occurred with the auto script. Updated ADC to Volt constants “Mained” version 3308 Updated UNO scale factors

What was done Dec. 2,3 Cal_quick calib version #46320 Total number of CAL bad channels for version 3309 is 247 They break down as follows: FCAL BCAL RCAL Total FEC 37 2 7 46 UNO 54 93 23 170 Qinj 11 4 2 17 PED 10 4 0 14 Total 112 103 32 247 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b 11 16 14 560E 12 1 7 0 4005 UNO mean is too low b 11 16 20 560F 12 1 7 1 4005 UNO mean is too low 1 holes Total number of SRTD bad channels for version 3309 is 5 Ca Crt Crd Chn PMT Code Message r 6 14 1 944 65 Nonlinearity r 6 14 2 958 65 Nonlinearity r 6 14 3 96C 22 Pipeline pedestal spread r 6 14 4 980 42 Pipeline gain spread r 6 14 11 8EA 65 Nonlinearity Total number of FNC bad channels for version 3309 is 0 Total number of PRES bad channels for version 3309 is 1 r 11 2 43 10E0 65 Nonlinearity Total number of PRT bad channels for version 3309 is 0 Total number of LED bad channels for version 3309 is 0 Total number of BPRE bad channels for version 3309 is 0 Total number of TDI bad channels for version 3309 is 0 Dec. 2,3 Cal_quick calib version #46320 Updated B.C.’s and UNO scale factors Mained version 3309

Called on the 26th 10pm, hot cell in BCAL Problems Called on the 26th 10pm, hot cell in BCAL Informed CFLT expert Called again on the 27th 4am, same hot cell Problem seemed to correct itself Before and after pictures of runs 46220 (with hot cell) and 46221 (hot cell gone) come next. I am showing BHAC energy and hits because I think it is most clear in these plots

Called on the 29th 6:30pm, slow control warning cal HV 22 Problems Called on the 28th 11pm, slow control warning, many problems with the HV Called Allesandro, he asked the shift crew to restart slow control, errors are gone Called on the 29th 6:30pm, slow control warning cal HV 22 Informed Allesandro, warning still on slow control, same as last week I think. Called on the 1st, 11am, for crate error. Vladimir called at the right moment, so I asked for his help and he fixed it.

DQM monitoring Other than the few runs at the beginning of the week with the hot cells, all the plots looked fine for the rest of the runs Except for the corruption histos for run 46264. (next slide) There is an error in the adamo tables for these runs.