ISD SG Closing Report Date: Authors: July 2012 July 2012

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0960r1 Submission July 2012 Stephen McCann, RIMSlide 1 ISD SG Closing Report Date: Authors:
Advertisements

Doc.: IEEE /0660r0 Submission May 2015 Stephen McCann, BlackBerrySlide 1 TGaq Closing Report Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /1227r0 Submission Nov 2012 Adrian Stephens, Intel CorporationSlide Sept 2012 Motions Date: Authors:
Doc.: IEEE /0417r2 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 TGaq Comment Resolution Motions Date: Authors:
Doc.: IEEE /0757r5 Submission July 2012 Stephen McCann, RIMSlide 1 ISD Study Group Agenda Date: Authors:
July 2012 Plenary Motions Date: Authors: July 2012
IEEE 802 EC July Motions Date: Authors: Name
TGaq Closing Report Date: Authors: January 2013
Closing Report Date: Authors: July 2007 July 2007
Closing Report Date: Authors: March 2010 March 2010
TGaf Waikoloa Closing Report
Closing Report Date: Authors: July 2010 March 2010
Closing Report Date: Authors: March 2010 March 2010
PAD SG Closing Report Date: Authors: September 2012
PAD SG Closing Report Date: Authors: November 2012
PAD SG Closing Report Date: Authors: November 2012
TGae Closing Report – May 2010
Closing Report Date: Authors: September 2009 September 2009
Liaison to WFA service discovery summary
Closing Report Date: Authors: July 2007 July 2007
Figure 4-11a update Date: Authors: September 2016
ISD SG Closing Report Date: Authors: July 2012 July 2012
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
Closing Report Date: Authors: November 2009 November 2009
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
Radio Resource Measurement Closing Report to the Working Group
ISD SG Closing Report Date: Authors: May 2012 May 2012
ISD SG Closing Report Date: Authors: March 2012 March 2012
20th Anniversary Publicity
Infrastructure Service Discovery
Closing Report Date: Authors: November 2009 November 2009
TGaf San Antonio Closing Report
IEEE Fast Initial Authentication Study Group Closing Report
PAD Study Group Agenda Date: Authors: September 2012
Closing Report Date: Authors: September 2009 September 2009
TGaf Waikoloa Closing Report
Auto SG July 2016 Closing Report
QoSMAN SG Closing Report – Nov 2009
Closing Report Date: Authors: November 2010 November 2010
TGu Motions Authors: March 2010 Date: March 2010
Closing Report Date: Authors: September 2010 March 2010
TGu Teleconference Motions
Infrastructure Service Discovery
WNG SC Agenda Authors: July 2009 Date: March 2009
ISD Study Group Agenda Date: Authors: July 2012 July 2012
Nov 2011 Closing Plenary Motions
TGm Closing Report – May 2010
Motions March 2015 Date: Authors: March 2015 March 2015
Summary of PAD SG use cases
TGaf Orlando Closing Report
TGu Motions Authors: January 2010 Date: January 2010
TGaq Closing Report Date: Authors: July 2016 July 2016
Closing Report Date: Authors: July 2009 July 2009
TGae Closing Report – July 2011
DLS SG Closing Report Date: Authors: March 2007 Month Year
TGu Motions Authors: March 2010 Date: March 2010
IEEE TV White Spaces Study Group Closing Report
TGaf San Antonio Closing Report
September 2012 Publicity Date: Authors: September 2012
ISG SG Closing Report Date: Authors: January 2012
ISD Study Group Agenda Date: Authors: July 2012 July 2012
BCS SG Closing Report Date: Authors: September 2018
ISD Study Group Agenda Date: Authors: May 2012 May 2012
Closing Report Date: Authors: January 2010 January 2010
TGaq Closing Report Date: Authors: July 2015 July 2015
TGaq Closing Report Date: Authors: March 2015 March 2015
TGae Closing Report – September 2010
Presentation transcript:

ISD SG Closing Report Date: 2012-07-19 Authors: July 2012 July 2012 doc.: IEEE 802.11-12/0960r2 July 2012 ISD SG Closing Report Date: 2012-07-19 Authors: Stephen McCann, RIM Stephen McCann, RIM

July 2012 doc.: IEEE 802.11-12/0960r2 July 2012 Abstract Closing report for Infrastructure Service Discovery Study Group (ISD SG) for July 2012, San Diego, CA, USA Stephen McCann, RIM Stephen McCann, RIM

Summary Plans for September 2012 July 2012 doc.: IEEE 802.11-12/0960r2 July 2012 Summary Name change – Pre-Association Discovery (PAD) Several presentations on use cases and requirements Extensive discussion on scope, resulting in a draft scope suitable for a PAR. Minutes: 11-12-0902r0 A motion to extend the study group No teleconferences Plans for September 2012 Editing of the PAR and 5C documents Stephen McCann, RIM Stephen McCann, RIM

January 2012 doc.: IEEE 802.11-12/0960r2 July 2012 Motion Request the IEEE 802 LMSC to extend the IEEE 802.11 PAD Study Group. Note: this is to allow further work to finalise PAR and 5 Criteria documentation. Moved: Harry Worstell Second: Dwight Smith Result: 29/0/0 Stephen McCann, RIM Michael Montemurro, RIM