doc.: IEEE 802.15-<15-09-0758-00-004e> <month year> doc.: IEEE 802.15-<15-09-0758-00-004e> <May 2018> Project: IEEE P802.15 Working Group for Wireless Specialty Networks (WSNs) Submission Title: [TG4z EIR Closing Report] Date Submitted: [10 May 2018] Source: [Tim Harrington] Company [Pro-ID] Address [Los Gatos, CA] Voice:[], E-Mail:[Timothy.Harrington@verizon.net] Re: [TG4z EIR Closing Report for May 2018 interim session] Abstract: [IEEE 802.15 TG4z EIR Closing Report for May 2018 interim session] Purpose: [IEEE 802.15 TG4z EIR Closing Report for May 2018 interim session] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Tim Harrington (Pro-ID)
IEEE 802.15.4z EIR Closing report <May 2018> IEEE 802.15.4z EIR Closing report May 10, 2018 Tim Harrington IEEE 802.15 TG4z EIR Chair Tim Harrington (Pro-ID)
Contributions 3 Presentations were made: Jul 12, 2010 07/12/10 <May 2018> Contributions 3 Presentations were made: 15-18-0211-00-004z-text-proposal-for- hrp-uwb-srdev-ppdu: Frank Leong 15-18-0218-01-004z-changes-proposal- for-lrp-uwb-phy: David Barras 15-18-0108-03-004z-hrp-uwb-phy- enhancements: Billy Verso Tim Harrington (Pro-ID) Page 3
Other Work 15-18-0239-01-004z-comments-on-802-11ax-cad <May 2018> Other Work 15-18-0239-01-004z-comments-on-802-11ax-cad 15-18-0254-00-004z-coexistence-brainstorming 15-18-0259-00-004z-call-for-proposals 15-18-0258-00-004z-guidelines-for-tg4z-technical-contributions Content for Baseline Draft 15-18-0211-00-004z-text-proposal-for-hrp-uwb-srdev-ppdu Tim Harrington (Pro-ID
Jul 12, 2010 07/12/10 <May 2018> Timeline Timeline: March 2018 – 2nd Call for proposals – resolved comments on PAR and CSD July 2018 – Review new proposals Align and modify current contributions Begin drafting standard September 2018 – Complete Drafting November 2018 – 1st letter ballot January 2018 – Comment Resolution Tim Harrington (Pro-ID) Page 5
July Plenary Scheduled 8 sessions Review new proposals 07/12/10 <May 2018> July Plenary Scheduled 8 sessions Review new proposals Align and modify current contributions Begin drafting standard Tim Harrington (Pro-ID) Page 6