Mechanical Engineering & Technology (MET)

Slides:



Advertisements
Similar presentations
Development plan and quality plan for your Project
Advertisements

Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
UNEP Training Resource Manual Topic 12 Slide 1 Attributes of a good EIA project manager F good communicator F technical competency F problem-solver F team.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Chapter 3: Project Management Omar Meqdadi SE 2730 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
CIP Quality System for Genebank ISO 17025
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Integration Drawing Exchange Solution [IDES] Mar. 2015
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
PLM-documentation management plans & status Henrik Lindblad Group Leader PLM & Process support Oct 16, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Conventional Facilities Jan Molander Design Manager Conventional Facilities December 10, 2013.
Status of the 3D model and updates from the IKC models May 2015
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
MMT Retreat Technical Services across ESS Peter Rådahl
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Status of the design integration strategy and installation design January on.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Director’s Progress Review Closeout Meeting
ESS licensing process and Readiness Reviews
Unit 1 What is Project Management
Structure and Responsibility
Accelerator Reliability Information System
FC facilitation of Installations
Competence recognition at work
Presenter Name | Company Name
E-Business Suite Migration: from AIX to Exadata in 7 Months
Director’s Progress Review Closeout Meeting
Presenter Name | Company Name
Cell Deployment Process
Presenter Name | Company Name
Delivery of Solutions Information Management
Management System - update -
Radiation protection organisation
Mikael Jakobsson ESS Installation Manager
Supplier Quality Assurance Manual
Presenter Name | Company Name
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Presentation on CAPSTONE PROJECT presented by Cdr MD Masum-ul-Haque, (E), BN ME DEPT MILITARY INSTITUTE of SCIENCE and TECHNOLOGY (MIST)
Quality Regulation for Mechanical Equipment RESSQ – Mech
Albrecht Wirthmann ESS TF Big Data
Bunker Internal Review Welcome & Charge
Receiving Inspection on incoming goods
MET Session workshop Job description Integration Engineer
Mechanical Engineering & Technology (MET) section workshop
Presenter Name | Company Name
Charge for CSPEC Detector Construction Workshop
Licensing update ESHAC #7, October 2017
Accelerator NCFE Liaison Officer
Dawid Patrzalek Mechanical Design Engineer
Bunker Critical Design Review Welcome & Charge
New Tyre Industry Career Pathing Research 16 April 2019
Strategic Review of Ex-RDMU and Current CSRU
MRV system budget and scheduling Short overview installation
ESSNet SERV 2 Implementing Shared SERVices
General Overview of WP 12 ESS Vacuum System
SHARE Special Project Enterprise Learning Management Pilot Project Planning/Implementation Certification December 17, 2014 Requesting Agency: Cassandra.
Presentation transcript:

Mechanical Engineering & Technology (MET) Section Workshop #1 31-Jan & 01-Feb 2018 https://indico.esss.lu.se/event/975/ Dr. Eng. Nick Gazis Section Leader www.europeanspallationsource.se

ESS projects (NG) Mechanical Integration Lead Engineer nick.gazis@esss.se Mechanical Integration Lead Engineer Accelerator design & requirements Overall responsibility of 3D models for tunnel (G01) and gallery (G02) IKC design coordination and drawing exchange through CHESS (IDES project) Accelerator Installation Manager Overall responsibility of cost, scope & schedule of Accelerator Installation Generation of accelerator installation maps Generation of safety manual for Accelerator Installation On-going projects Section Leader of Mechanical Engineering & Technology (MET) section Member of TS1 at LTH Lead engineer of the Non-Destructive Testing for Machines (NDTM) project 31-Jan, 01-Feb 2018 MET section workshop

Section Tasks MET Section tasks nick.gazis@esss.se MET Section tasks Design and engineering support on the ESS machines Develop mechanical engineering technology (e.g. CM design support, NDTM, other) Train and educate MET members according to the ESS projects’ needs Share and transfer knowledge for mechanical engineering within ESS (& also outside) Develop and maintain the ESS machine digital mock-up (EPL) Needs from ESS projects - milestones for MET Create, maintain, function a mechanical design Core team (i.e. central design office) Create, maintain mechanical design processes (drawing tolerance standards, material properties, standard parts catalogue in CATIA and ESS Procurement contractors etc.) Create, maintain, function ISO drawings competence on ESS designs and reviews Emphasize and troubleshoot mechanical design technical issues Communicate requirements for support outside the section (to PLM, Integration, PIM and other) Timeline of MET Coordinate a closer collaboration for the section people to share experience Core team meeting and section meeting/workshop Set & follow-up communication with PLM, PIM, Integration Groups for specified deliverables What else? 31-Jan, 01-Feb 2018 MET section workshop