FlexFile 101 MARCH 2019.

Slides:



Advertisements
Similar presentations
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Accounts Receivable Presented by: Robert Myers Presented by: Robert Myers.
Advertisements

EHBs 102: Submitting Reports & Troubleshooting in EHBs.
Public Vouchers Further information is available in the Information for Contractors Manual under Enclosure 5 The views expressed in this presentation are.
UNCLASSIFIED DoD COST REPORTING OVERVIEW CSDR & EVM-CR 1.
Rutgers University Future state monthly close calendar
FY 2011 Part A Program Updates May 17, 2011 The HIV/AIDS Bureau Division of Service Systems.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
Generic GFE Implementation Toolset for Prime Contractors -IUID Guidance- –Initial population of Government Furnished Equipment Data into the IUID Registry.
Submitting IT Purchasing Statements of Work to DIR SB 20 COMPLIANCE FOR TEXAS STATE AGENCIES TECHNOLOGY SOLUTIONS FOR GOVERNMENT AND EDUCATION.
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Prepared by the Office of Grants and Contracts1 The Basics of Grants Administration.
1 Test Operations Contract RFP Volume III ITO Briefing RFP NNS09ZDA008R – TEST OPERATIONS CONTRACT (TOC) Ground rules This presentation is intended to.
Presentation to Board June 17, 2008 Presented by: J. A. Sabo, Associate Director – Leading Services & Treasurer of the Board BUDGET York Catholic.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
TEDS Texas Education Data Standards. TEDS is the new set of documented standards that will be used for TSDS PEIMS, Dashboard, Unique ID, and Core Collection.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
UNCLASSIFIED PSM Support to Cost Reporting 1. UNCLASSIFIED PSM Help Required 2 DoDI requires cost reporting on ALL Sustainment Contracts over.
1 DATA Act Information Model Schema (DAIMS) Version 1.0 Briefing June 2016.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management TALS Draft Conceptual Solution February 24, 2004.
Federal Acquisition Service U.S. General Services Administration WITS 3 Unit Pricer Training Manual August 11, 2008.
1 Voucher Management System Changes – – Tabular Form layout – Consolidated like items on same tab – Aligned UML and HAP on same row for easier input –
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
How to complete and submit a Final Report through
Operations and Supply Chain Strategies
RFP 12-58, Data Warehouse Pre-Proposal Conference
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
North Carolina Council on Developmental Disabilities
Grant Search & Submission
The Council Budget Understanding the Budget Process
Budgeting and Cost Estimation
Initial ERCOT Parking Deck Prioritization Recommendation
Forecasts and Long Term Forecasts (Formerly Planning Schedules)
Establishing and Managing a Schedule Baseline
Sourcing Event Tool Kit Multiline Sourcing, Market Baskets and Bundles
Initial ERCOT Parking Deck Prioritization Recommendation
TRAVEL SERVICES Request for Proposal
Project Integration Management
TechStambha PMP Certification Training
(Additional materials)
Introduction to project accounting
Program Management Portal (PgMP): Catalog and the Client
Training for New District Test Coordinators
Phase 2 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
A Joint Effort Between Government and Industry
FlexFiles.
COST ASSESSMENT DATA ENTERPRISE
Leading Indicators and Dashboarding for Advanced Work Packaging
SMART Benchmarking Program Site Enhancement Planning
Sustainment Reporting CADE Sustainment Reporting
Completing the State Aid Payment Request
Request for Proposal & Proposal
Campus ESSA Grant Packet Training
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Phase 2 Tollgate Review Discussion Template
New MyFD JV Feature Demo Webcast August 1, 2018
CSDR Submit-Review Website Submitter Guide
Identify Cost Assignment and Settlement
Compliance Guide Using the CSDR-SR.
Phase 2 Tollgate Review Discussion Template
Budget Piece Last update: 4/21/2014
North Carolina Council on Developmental Disabilities
Forecasts and Long Term Forecasts (Formerly Planning Schedules)
Task Order Dashboard Eric L. Gashel
Overview of The Bidder Response Form and Changes to the IT RFP Template March 8, 2019.
KEC Dhapakhel Lalitpur
The Product Service Code Selection Tool: A Quick Guide
Presentation transcript:

FlexFile 101 MARCH 2019

Agenda Implementation FlexFile 101 Agenda Implementation FlexFile and Quantity Report will replace DD 1921 Series as the default required cost reporting requirement for newly approved CSDR plans starting May 15, 2019 Some tailoring of the DID requirements may be proposed by the CWIPT (e.g. time-phasing for periods longer than a month) If there is context-specific rationale, e.g. the reporting contractor and effort being performed make it unlikely the additional insight provided will be utilized, then the CWTIP may propose to use the DD 1921 series. FlexFile Implementation Overview Legacy Reports FlexFile/-Q Data Groups FlexFile/-Q Planning, Submission, and Validation Data Access – CSDR-SR Data Access – Data and Analytics

FlexFiles/Quantity Report FlexFile Overview Legacy 1921 Reports to FlexFiles Legacy DIDs FlexFiles/Quantity Report From five DIDs to two CWBS Index and Dictionary 1921: Cost Data Summary Report 1921-1: Functional Cost-Hour Report 1921-2: Progress Curve Report 1921-5: Sustainment Functional Cost-Hour Report

Legacy CCDR Reports DD 1921 Series

DD 1921: Cost Data Summary Report FlexFile Overview DD 1921: Cost Data Summary Report Key Takeaways: Costs and units by WBS Reporting Contractor Profit/Loss or Fee Key Data Fields: Nonrecurring/Recurring Reporting by WBS

DD 1921-1: Functional Cost-Hour Report FlexFile Overview DD 1921-1: Functional Cost-Hour Report Key Takeaways: Enables three types of analysis: Labor vs material Hours vs dollars Engineering vs Manufacturing Key Data Fields: Nonrecurring/Recurring Reporting by WBS Standard Functional Categories

DD 1921-5: Sustainment Functional Cost-Hour Report FlexFile Overview DD 1921-5: Sustainment Functional Cost-Hour Report Key Takeaways: Format the same as 1921-1, with sustainment functional categories Enables touch vs support labor analysis Key Data Fields: Nonrecurring/Recurring Reporting by WBS Standard Functional Categories

DD 1921-2: Progress Curve Report FlexFile Overview DD 1921-2: Progress Curve Report Key Takeaways: Cost reporting by unit, lot, or sub-lot Enables learning curve analysis Key Data Fields: Recurring direct costs Reporting by WBS Standard Functional Categories Sequencing

Approved Data Requirements The FlexFile Approved Data Requirements

Approved FlexFile Data Requirements FlexFile Overview Approved FlexFile Data Requirements Data Group A Data Group B Data Group C Report Metadata Approved Plan Number Submission Event Period of Performance Reporting Organization As of Date Date Prepared more in the DID… DD Form 2794 Data Elements WBS Element Order/Lot End Item Definitions and Remarks WBS Element Definitions Remarks by WBS Element Summary Remarks The core of the FlexFile is providing dollars and hours at the account level in contractor native categories, time phased. Insight into contractor’s native Functional Categories Account level reporting at or below the WBS Data time-phased monthly or to align with contractor’s financial calendars Continuity with prior reports by requiring the legacy government tags Data Group D Data Group E Data Group F Summary Elements Order/Lot Subtotal General and Administrative Undistributed Budget Management Reserve Facilities Capital Cost of Money Contract Fee Contract Price Actuals To Date (ATD) Account Reporting Period CLIN Nonrecurring or Recurring Functional Category / Overhead Standard Functional Category Unit/Sublot WBS Element Order/Lot and End Item ATD (Dollars and Labor Hours) Allocation Methodology Allocation Method Data Group G Greatest value to cost estimator, in many cases, will be the additional insight requested in Group E Legacy Element Forecasts At Completion (FAC) FAC (Dollars) FAC (Labor Hours)

Approved -Q Data Requirements FlexFile Overview Approved -Q Data Requirements Data Group A Data Group B Data Group C The Quantity Report ties the necessary quantity information to the FlexFile: Units to date should reflect an actual count of physically completed units Allow sequencing quantities to be optional through Planning process for each End-Item as not all End Items may require sequencing (e.g., Kits) Sequencing was allowed for lower level WBS elements in legacy 1921-2, but FlexFile does not sequence WBS elements (only End Items) To Date and In Process to be defined by contractor in the Remarks section Report Metadata Approved Plan Number Submission Event Period of Performance Reporting Organization As of Date Date Prepared more in the DID… Government Furnished Equipment WBS Code/Level/Name Order/Lot End Item Quantity at Completion Delivered Quantity At Completion Internal Quantity At Completion Co-production or Concurrent Quantity At Completion Government Furnished Equipment At Completion Remarks Data Group D Data Group E Legacy Element Assessed Quantity to Date Quantity Completed To Date Quantity In Process Remarks Sequencing (as required by Plan) First Unit Number Last Unit Number Is Internal

Summary: FlexFile Reporting Requirements FlexFile Overview Summary: FlexFile Reporting Requirements Legacy Reporting DIDs Reporting Elements Submission mechanism Formats available to analysts CWBS 1921 1921-1 1921-2 1921-5 WBS NR/R Standard Functional Category Unit/Sublot Cost Reporting ATDs and FACs To Date Quantities At Completion Quantities Sequencing Definitions XML DD Forms generated by cPet desktop or web 1921 DD Forms Excel flat file FlexFile and Quantity Report will replace DD 1921 Series All of the elements found in the DD 1921 Series can be found in the FlexFile and Quantity Report FlexFile/Quantity Report DIDs Reporting Elements Submission mechanism Formats available to analysts FlexFile Quantity Report All Legacy reporting elements Account End Item and Order/Lot CLIN Functional (Internal) Category Functional (Internal) Overhead Category Time-phasing Allocation Methodology GFE units JSON Data Model or Excel-Compatible Format 1921 DD Form Excel flat File For one submission, the contractor will submit a FlexFile and a corresponding Quantity Report (if applicable) The CWBS Dictionary is part of the FlexFile DID and must be submitted with every FlexFile

The FlexFile Planning Process

Contract Award and Validations FlexFile Overview Planning Process Flowchart Pre-Plan Plan Development Approval Contract Award and Validations RFP Identified RFP Release Contract Award Initial Plan Drafted Service Component POC Program Office DCARC/CAPE Review OSD CAPE Program Office Approves Service Cost Center POC CWIPT Review DCARC Contractors SCC Director Review CWIPT DCARC Director Review DDCA Director Review Dissemination to CWIPT Dissemination to Contractors Post Award Conference Validation of Cost Reports The overarching CSDR planning process does not change when implementing a FlexFile, but some additional considerations exist...

Planning Considerations FlexFile Overview Planning Considerations Figure 1 - DD Form 2794, Supp. (SCOPE DEF) The following considerations should be included in addition to existing CSDR planning guidance Define End Item and Order/Lot (see Figure 1) FACs broken out by Nonrecurring/Recurring and the Standard Functional Category Quantity Report requires that reporting elements are selected and that GFE are properly identified (see Figure 2) Quantity Report also requires that sequencing be selected by Order/Lot and End Item Figure 2 - DD Form 2794, Pg 1 (REPORTING) Planning Upload Submit Validation CSDR Process

DD 2794 (CSDR Plan) Comparison FlexFile Overview DD 2794 (CSDR Plan) Comparison 2015 DD Form 2794, Pg 1 Metadata from the top of Pg 1 of the 2015 CSDR plan has it’s own page as part of the FlexFile CSDR plan. FlexFile DD Form 2794, Pg 1 (Metadata)

DD 2794 Comparison 2015 DD Form 2794, Pg 1 FlexFile Overview DD 2794 Comparison 2015 DD Form 2794, Pg 1 If the CWIPT is requiring FlexFiles: Indicate the LOWEST LEVEL of the WBS in column 12a (ACTUALS TO DATE (ATD)) where actual cost data is required Indicate EVERY element for column 12e (AT COMPLETION COSTS) where forecasted data is required Indicate which elements require quantity report data in box 13a FlexFile DD Form 2794, Pg 2 (Reporting)

DD 2794 Comparison 2015 DD Form 2794, Pg 1 FlexFile Overview DD 2794 Comparison 2015 DD Form 2794, Pg 1 If the CWIPT is requiring 1921s: Indicate which forms would be required for each WBS element where actual and forecasted data is required Column 12a (ACTUALS TO DATE (ATD)) would act as the 1921 column Every element requires a CWBS Dictionary definition so the CWBS Dictionary requirement will be indicated on Submission Events page FlexFile DD Form 2794, Pg 2 (Reporting)

DD 2794 Comparison 2015 DD Form 2794, Pg 2 FlexFile Overview DD 2794 Comparison 2015 DD Form 2794, Pg 2 FlexFile DD Form 2794, Pg 3 (Events) FlexFile and Quantity Data Reports will be submitted together FlexFiles and Quantity Data Reports will typically be submitted annually or at a greater frequency

FlexFile Overview DD 2794 Comparison If the CWIPT is requiring FlexFiles, the Scope Def page is required Indicate the Order/Lots and End Items that the contractor will be tagging the reported dollars and hours to Require Unit Reporting in box 18c if the CWIPT required unit cost reporting, similar to the 1921-2 requirement Indicate that Unit Reporting is required in the FlexFile instead of a 1921-2 See the implementation guide for more information regarding these two fields FlexFile DD Form 2794, Pg 5 Supp. (Scope Def)

Submission and Validation The FlexFile Submission and Validation

Submission/Validation Considerations FlexFile Overview Submission/Validation Considerations Submission Considerations The starting point for submission allows industry to submit the reports in an Excel-Compatible file instead of the JSON Data Model. The data model is final and industry may choose to submit according to the JSON Data Model. If submitting in an Excel-Compatible format, DCARC will ensure that it maps to the data model for CADE ingestion. This may require some coordination between the DCARC and contractor. The DCARC will then submit the JSON Data Model for validation. Validation Considerations DCARC will ensure compliance with DID Approved CSDR plan Equivalent of Legacy 1921 validation rules External stakeholders may also consider any of the additional insight provided in the FlexFile format when conducting their reviews. Planning Upload Submit Validation CSDR Process

FlexFile Overview Submission Options Contractor will have option to submit Excel-compatible file or in JSON Data Model Once submitted, Legacy validation process takes place with DCARC administering Validation Error Report Submit FlexFile JSON Data Model? Finalize Report Government validates report and provides industry a Validation Error Report Yes No DCARC uploads submitted data in JSON Data Model. May require coordination with contractor. Planning Upload Submit Validation CSDR Process

The FlexFile Data Access

An analyst can access a FlexFile in the CSDR-SR in four primary ways… Implementation Overview Data Access – CSDR-SR An analyst can access a FlexFile in the CSDR-SR in four primary ways… Export Excel Data Model Template FlexFile data provided in Excel data model structure Export Pivot Data Actual dollars and labor hours according to the data elements in Data Group E of the approved FlexFile DID Formatted File Export Excel version of formatted 1921 DD Form Export to Excel Excel flat file with Metadata, Remarks, and Definitions equivalent to that provided in the 1921 DD Form 1 1 2 2 3 4 3 4

Utilize filters to narrow search results > select submission event. Implementation Overview Data Access – Data and Analytics FlexFiles can be accessed using the Browse CSDR Submissions feature in Data & Analytics Utilize filters to narrow search results > select submission event.