ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11

Slides:



Advertisements
Similar presentations
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Advertisements

Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Status Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 5 Vinh Nguyen February 24, 2005.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Group 2 - Project Update Feb Tyler Helble.
Presenter: Allen Duncan April 10, Highlights of the Last Week Tested Receiver without optical link Used Al shield to determine EMI presence Conducted.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
ECE 101 Innovative Education-- snaptutorial.com
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Progress Report ECE 4006 Harsh Sopory
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
1394b Design for Gigabit Optoelectronic Data Communication
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-C Presentation the almost Last (10th)
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
ECE135 Group 2 – Presentation 3
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
Group 5 – ECE 4006: Week 2 Jason Young 5/2/2019.
Project GabE ECE 135 – Spring 2005 Presentation 10
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11 PLANNED WORK week #Nov. 25th – Dec. 2nd Complete unconnectorized Assembly Continue trouble shooting Finish TX and RX alignment tolerance testing Complete TX and RX error rate testing (connectorized) Start 2nd Build ????? Start Final paper PROGRESS Connectorized RX Board Assembled and working !! Connectorized TX Board Assembled and working !! Received connectorized PD (Thank you G6 !!!) Received connectorized components (finally) from vendor TX and RX Repairs and modifications THANKS G1 !!!!! Started unconnectorized assembly Presented by: Boun Vongsamphanh

RX Changes (schematic view)

TX Changes (schematic view)

Eye diagram for G7 transmitter throughput PRBS7 K28.5 Honeywell HFE-4383-521 Peak Wavelength 850 nm Slope Efficiency 0.15 mW/mA Threshold Current 3.5 mA HOME

Eye diagram for G7 receiver throughput PRBS7 K28.5 Optoway OPDR1-GSA3 Peak wavelength 850 nm Responsivity 0.55 mA/mW Capacitance 1.5 pF “Bad” eye diagrams (showing gradual improvement during initial repairs) HOME

Both TX and RX working Eye diagram for G7 transmitter connected to G7 receiver !! PRBS7 K28.7 HOME

ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11

End of Slideshow ;)