Job Performance Requirement 10-14

Slides:



Advertisements
Similar presentations
Hose Pulls Shoulder Load ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.
Advertisements

How To Pull A Pre-Connect
How Airplanes work and how has it changed
VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step.
Fire Hose and Appliances
FIREFIGHTER I LESSON 12A. FIRE HOSE TERMS Expansion-ring gasket Expansion-ring gasket — Gasket used at the end of hose where it is expanded into coupling.
The Cleveland Load.
Loading the SAC-METRO pack. Coil the hose with the male coupling to the inside. Using a winding table or a Gnass Hose Winder to simplify this operation.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
Getting Wet Stuff to the Red Stuff For 300 Years
Fire Hose Skills Firefighter II.
Fire Hose and Appliances
ROSENBAUER REAR-MOUNT SPEED-LAYS
Blackwood Fire Company TL84 LDH Deployment/Restoration Training Module.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Pulling working lines. Step up onto the tailboard. Step up onto the tailboard.
What’s Keeping Me Up?. US Air Force C-5 The largest plane in the US Air Force.
Fire Hose, Nozzles, Streams, and Foam
Job Performance Requirement Modified Gasner Bar Pack.
Part C  Accordion load  Lay the first length of hose in the bed on edge against the partition with the coupling at the rear of the bed  At the front.
Ropes and Knots Skill Drills.
Job Performance Requirement 14-2 Shoulder Carry. JPR 14-2A A The shoulder carry is useful for operations when firefighters will carry a ladder a good.
Job Performance Requirement Removing the Windshield and Roof.
Job Performance Requirement Soft-Sleeve Hydrant Connection.
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
Job Performance Requirement Removing Tempered Glass.
Job Performance Requirement Tying a Rescue Knot.
Job Performance Requirement Horseshoe Load.
The Westampton Rolls How to Pack and Pull the Westampton Rolls Hose Load.
Job Performance Requirement Setting Up for a Drafting Operation.
Job Performance Requirement 7-1 Donning SCBA  Over the Head Method.
Fire Attack and Foam (Fire Fighter I)
Job Performance Requirement 10-30
STRAIGHT WALL LADDER OVERHEAD RAISE LOW SHOULDER CARRY
Module A Fire Hose And Appliances (4-12)
Job Performance Requirement 7-8
Job Performance Requirement 16-11
Job Performance Requirement 10-16
Job Performance Requirement 16-5
אביבה אלקלעי, ראש היחידה לכניסה להוראה, המכללה האקדמית אחווה
מהו הסטאז'? המכללה האקדמית תלפיות.
Job Performance Requirement 10-11
Job Performance Requirement 20-2
Job Performance Requirement 10-19
High-rise Pack Loading
Fire Hose, Nozzles, Streams, and Foam
Job Performance Requirement 15-11
Job Performance Requirement 20-1
Job Performance Requirement 16-10
Job Performance Requirement 15-13
Great! on in in front of under above next to behind between next.
Job Performance Requirement 10-15
Job Performance Requirement 10-28
Job Performance Requirement 10-31
Purple Belt Self Defense
Job Performance Requirement 16-13
Loading the SAC-METRO pack
Job Performance Requirement 10-9
Job Performance Requirement 20-5
Job Performance Requirement 16-3
Job Performance Requirement 10-27
Job Performance Requirement 16-13
Job Performance Requirement 16-8
Job Performance Requirement 16-8
Job Performance Requirement 10-33
ENGINE COMPANY OPERATIONS
Job Performance Requirement 15-3
Job Performance Requirement 10-32
Job Performance Requirement 15-14
Job Performance Requirement 2-1
Presentation transcript:

Job Performance Requirement 10-14 Advancing an Accordion Load

A A nozzle or other appliance is attached to the end of the hose and the desired amount is selected. JPR 10-14A

B The firefighter pulls the amount of hose about halfway out of the bed and places it on one shoulder with the nozzle at the bottom. Use care not to have too much of the hose in front, which could cause tripping—it is better to drag the excess behind. JPR 10-14B

C Step away from the bed. Pull additional folds and drop them to the ground. JPR 10-14C

D When the point is reached where the shoulder load is to be deployed, the firefighter allows the hose to flake off one fold at a time while moving forward. JPR 10-14D