News Learned at the OU workshop that we need further split of releases

Slides:



Advertisements
Similar presentations
Physics with SAM-Grid Stefan Stonjek University of Oxford 6 th GridPP Meeting 30 th January 2003 Coseners House.
Advertisements

DEVELOPING SUPPORT NETWORKS GPCA WORKSHOP March , 2012.
4/2/2002HEP Globus Testing Request - Jae Yu x Participating in Globus Test-bed Activity for DØGrid UTA HEP group is playing a leading role in establishing.
McFarm: first attempt to build a practical, large scale distributed HEP computing cluster using Globus technology Anand Balasubramanian Karthik Gopalratnam.
February 12, 2002 DØRACE 1 Grid activities in NIKHEF Willem van Leeuwen.
OSG Grid Workshop in KNUST, Kumasi, Ghana August 6-8, 2012 following the AFRICAN SCHOOL OF FUNDAMENTAL PHYSICS AND ITS APPLICATIONS July 15-Aug 04, 2012.
DOSAR SURA Cyberinfrastructure Workshop: "Grid Application Planning & Implementation" Texas Advanced Computing Center (TACC) University of Texas at Austin.
High Energy Physics At OSCER A User Perspective OU Supercomputing Symposium 2003 Joel Snow, Langston U.
Remote Production and Regional Analysis Centers Iain Bertram 24 May 2002 Draft 1 Lancaster University.
DØSAR, State of the Organization Jae Yu DOSAR, Its State of Organization 7th DØSAR (3 rd DOSAR) Workshop University of Oklahoma Sept. 21 – 22, 2006 Jae.
Status of DØ Computing at UTA Introduction The UTA – DØ Grid team DØ Monte Carlo Production The DØ Grid Computing –DØRAC –DØSAR –DØGrid Software Development.
CHEP 2003Stefan Stonjek1 Physics with SAM-Grid Stefan Stonjek University of Oxford CHEP th March 2003 San Diego.
Installation Sites. Active SAM-Grid Sites  The following sites are actively used for different types of jobs Monte Carlo – production of simulated events.
The Texas High Energy Grid (THEGrid) A Proposal to Build a Cooperative Data and Computing Grid for High Energy Physics and Astrophysics in Texas Alan Sill,
Jan. 17, 2002DØRAM Proposal DØRACE Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Remote Analysis Station ArchitectureRemote.
DØ RAC Working Group Report Progress Definition of an RAC Services provided by an RAC Requirements of RAC Pilot RAC program Open Issues DØRACE Meeting.
Career Exploration Lesson 8. Check-in: Completed your draft business plan Raise your hand if you have done this Take a new team picture Logo update: ready.
DØ RACE Introduction Current Status DØRAM Architecture Regional Analysis Centers Conclusions DØ Internal Computing Review May 9 – 10, 2002 Jae Yu.
Status of UTA IAC + RAC Jae Yu 3 rd DØSAR Workshop Apr. 7 – 9, 2004 Louisiana Tech. University.
Submitting jobs to the grid Argonne Jamboree January 2010 R. Yoshida (revised March 2010) Esteban Fullana.
Status of Grid-enabled UTA McFarm software Tomasz Wlodek University of the Great State of TX At Arlington.
Spending Plans and Schedule Jae Yu July 26, 2002.
26SEP03 2 nd SAR Workshop Oklahoma University Dick Greenwood Louisiana Tech University LaTech IAC Site Report.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 status, news, actions EGEE’07 Gergely.
DØSAR a Regional Grid within DØ Jae Yu Univ. of Texas, Arlington THEGrid Workshop July 8 – 9, 2004 Univ. of Texas at Arlington.
The Experiments – progress and status Roger Barlow GridPP7 Oxford 2 nd July 2003.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
From DØ To ATLAS Jae Yu ATLAS Grid Test-Bed Workshop Apr. 4-6, 2002, UTA Introduction DØ-Grid & DØRACE DØ Progress UTA DØGrid Activities Conclusions.
Brock/MSU2/12/2DØRACE Workshop The question I was assigned: “Is remote analysis compatible with DØ US HEP sociology?” slides at :
THEGrid Workshop Jae Yu THEGrid Workshop UTA, July 8 – 9, 2004 Introduction An Example of Existing Activities What do we want to accomplish at the workshop?
DØRACE Workshop Jae Yu Feb.11, 2002 Fermilab Introduction DØRACE Progress Workshop Goals Arrangements.
UTA MC Production Farm & Grid Computing Activities Jae Yu UT Arlington DØRACE Workshop Feb. 12, 2002 UTA DØMC Farm MCFARM Job control and packaging software.
Feb. 14, 2002DØRAM Proposal DØ IB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) Introduction Partial Workshop Results DØRAM Architecture.
The State of DOSAR DOSAR VI Workshop at Ole Miss April Dick Greenwood Louisiana Tech University.
Feb. 13, 2002DØRAM Proposal DØCPB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Partial Workshop ResultsPartial.
Be* Broadband Member Services Participatory Design Workshop.
VOX Project Status T. Levshina. 5/7/2003LCG SEC meetings2 Goals, team and collaborators Purpose: To facilitate the remote participation of US based physicists.
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome (John W.) - Session Chair:
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome Womersley 9:10-9:30 DØRACE.
McFarm Improvements and Re-processing Integration D. Meyer for The UTA Team DØ SAR Workshop Oklahoma University 9/26 - 9/27/2003
II EGEE conference Den Haag November, ROC-CIC status in Italy
Apr. 25, 2002Why DØRAC? DØRAC FTFM, Jae Yu 1 What do we want DØ Regional Analysis Centers (DØRAC) do? Why do we need a DØRAC? What do we want a DØRAC do?
July 10, 2002DØRACE Status Report, Jae Yu DØ IB Meeting, OU Workshop 1 DØ RACE Status Report Introduction Software Distribution (DØRACE Setup) Hardware.
Best 20 jobs jobs sites.
PROTO-GRID Status of Grid-enabled UTA McFarm software Tomasz Wlodek University of the Great State of Texas At Arlington.
Money! How to spend more of Debian's money Steve McIntyre Debian Project Leader 30 th July 2009.
BALANCING CAREER AND BEING IN RELATIONSHIP
Grid Operations Centre Progress to Aug 03
ATLAS Cloud Operations
OUHEP STATUS Hardware OUHEP0, 2x Athlon 1GHz, 2 GB, 800GB RAID
Survey on User’s Computing Experience
School versus Work Expectations
Hellas Grid Task Force - Target
CERN openlab for DataGrid applications
Data Acceptance and De-Accessioning Plans
PROJECT SCOPE Scope : SMT Machine in both plant I and plant III.
Knowledge Sharing Centre
Funding innovation Christian kumar
News p has no fetchpkgs.sh and fetchprod.sh shell script in the .../D0reltools/ These are missing due to the switch over to the new distribution.
Around the room Orders of operations.
Remote SAM Initiative (RSI) – Proposed Work Plan
Grid activities in NIKHEF
DØ RAC Working Group Report
Proposal for a DØ Remote Analysis Model (DØRAM)
SAM Offsite Coordination
News New Updated DØRACE setup instruction to reflect the download split available on the web Three new sites are at various stages Princeton: Phase IV.
Chapter 9 Career Planning.
HEP Data Grid for DØ and Its Regional Grid, DØ SAR
Computer Network Information Center, Chinese Academy of Sciences
Presentation transcript:

News Learned at the OU workshop that we need further split of releases People spend too much time fighting with network stability Support for RH6.x  Prague group has performed a testing of the compatibility between Debian and RH7.x Practical use of Grid using McFarm Louisiana Tech. Univ. up and running Tata  Four production nodes ready but still having some problems McFarm job submission to be released to FNAL DØGrid team for testing Finance committee meeting on July 12th at FNAL RAC ideas well accepted Karlsruhe is the first pRAC site (Christian) UK and French institutions showed strong interest DØ Management is forming a Task Force for this work No meeting on Aug. 15 (not sure about Aug. 29. Will let you know) Meeting room at FNAL will change to DØHouse from Aug. 12. No change in the VRVS Saturn virtual room or time Aug-01-2002 DØRACE, OU Workshop J. Yu, News