VLA EXPANSION PROJECT Correlator Issues.

Slides:



Advertisements
Similar presentations
1 National Radio Astronomy Observatory The EVLA -- Status, Future Rick Perley National Radio Astronomy Observatory.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Cross Correlators & New Correlators Michael P. Rupen NRAO/Socorro.
EVLA Correlator P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Technology and Functionality of the EVLA Correlator (Next Corr Workshop, June 27, 2006)
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory EVLA Goals, Progress, Status, and Projections Rick Perley Mark McKinnon.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
EVLA Correlator P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
EVLA Corr Racks/Cables etc. B. Carlson EVLA Correlator F2F Meeting Dec , 2007.
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory Correlator Status and Growth of Capabilities Michael P. Rupen Project.
Rick Perley 2 Nov 2001 EVLA Correlator Conceptual Design Review 1 Science Drivers for the EVLA Correlator Rick Perley EVLA Project Scientist 2 Nov 2001.
New Technologies for Future VLBI Correlators B. Carlson High Res. Astronomy, June 8-12, 2003 Socorro NM.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
ATCA GPU Correlator Strawman Design ASTRONOMY AND SPACE SCIENCE Chris Phillips | LBA Lead Scientist 17 November 2015.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Scientific Impact Michael P. Rupen.
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Surveying Cosmic Time with the WIDAR Correlator
EVLA Basic Operations Jim Ulvestad
Signal Processing for Aperture Arrays
EVLA Availability - or - When Can I Use It?
EVLA Project Peter Napier
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
Committee Charge Fred K.Y. Lo
Monitor and Control Software
Wireless ATM PRESENTED BY : NIPURBA KONAR.
EVLA Advisory Committee Meeting System Status
EVLA Correlator F2F Meeting Dec , 2007
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
Oxford Algorithms Workshop
PTC Setup at VLA B. Carlson
Aperture Array Station Processing
EVLA Status and Prospects
EVLA System PDR System Overview
Software Requirements
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
Some Illustrative Use Cases
EVLA Advisory Committee Meeting
Charge to the Review Panel
Prototype Correlator Testing
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Correlator Growth Path
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
Rick Perley NRAO - Socorro
Presentation transcript:

VLA EXPANSION PROJECT Correlator Issues

EVLA Phase-II Planning Meeting Outline Key WIDAR capabilities for EVLA-I “Flexibilities” Cost EVLA-II decision milestones EVLA-II: WIDAR or new design? Summary B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

Key WIDAR Capabilities for EVLA-I No. of stations: 32 (installed racks for 40; expandable to 256). Max. Bandwidth: 8 GHz in each pol’n. No. of spectral channels @ max bandwidth: 16,384. Max. No. of spectral channels: 262,144 (with ‘recirculation’). Pulsars: fast (<100 usec) phase binning, >1000 bins. Quantization: 4 or 8 bits (>105 spectral dynamic range). Best resolution: ~ 1 Hz. VLBI ready. B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA Phase-II Planning Meeting “Flexibilities” Trade No. of antennas for bandwidth. Trade bandwidth for No. of beams. Data routing supports expansion. …and much more... B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA Phase-II Planning Meeting Cost Planned deliverable for Phase-I: Full 32-station, 16 GHz with racks+power for 40 stations: ~$11.8M 27 VLA + 5 “others” Full bandwidth 27 VLA + 20 “others” @ 1 GHz 27 VLA + 10 “others” @ 4 GHz B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA Phase-II Planning Meeting Cost Correlator expansion costs for Phase-II: B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA Phase-II Planning Meeting Cost 40-station cost breakdown: Total Cost: $14.9M. Cost over Phase-I system: $3.1M. 27 VLA + 8 NMA + 10 “others” @ 4 GHz 27 VLA + 13 “others” Full bandwidth 27 VLA + 26 “others” @ 4 GHz 27 VLA + 8 NMA + 20 “others” @ 1 GHz B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA Phase-II Planning Meeting Cost 48-station cost breakdown: Total Cost: $18.4M. Cost over Phase-I system: $6.6M. 27 VLA + 8 NMA + 26 “others” @ 4 GHz 27 VLA + 21 “others” Full bandwidth 27 VLA + 42 “others” @ 4 GHz 27 VLA + 8 NMA + 52 “others” @ 1 GHz B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA Phase-II Planning Meeting Cost 64-station cost breakdown: Total Cost: $22.5-$26M. Cost over Phase-I system: $10.7M - $14M. 27 VLA + 8 NMA + 58 “others” @ 4 GHz 27 VLA + 37 “others” Full bandwidth 27 VLA + 74 “others” @ 4 GHz 27 VLA + 8 NMA + 116 “others” @ 1 GHz B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA-II decision milestones Q4 2005: Correlator production part ordering starts. Premium time to include expansion (one order, quantity price breaks, production infrastructure). Q4 2006: Production complete…testing (last chance to expand with 2nd production run). >>2007: “re-spin” of boards but retain architecture + infrastructure? B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA-II: WIDAR or new design? New design advantages: better/faster/cheaper technology. improved signal processing? (promising developments driven by SKA ‘large N’). more performance + functionality? New design disadvantages: new architecture, new infrastructure + S/W base. development time + cost. subtle limitations/side-effects? Retain WIDAR advantages: retain infrastructure + S/W base. high performance, flexible, expandable. maturity, stability, no dev. time- (lowest cost)? Retain WIDAR disadvantages: historically, new technology rapidly makes existing correlators obsolete. unable to meet unforeseen ‘new science’ requirements? cost-effective ‘on the road to the SKA’? B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting

EVLA Phase-II Planning Meeting Summary EVLA-I 32-station ‘WIDAR’ correlator ($11.8M): High performance, flexible, expandable. EVLA-II correlator: 40 stations costs additional $3.1M. 48 stations costs additional $6.6M. 64 stations costs additional $11M - $14M. Suitable for an inhomogeneous array of elements: flexible connectivity; tradeoff bandwidth for number antennas and number of beams. Build on the Phase-I infrastructure and software/hardware base. WIDAR or new correlator? Advantages and disadvantages…wait and see? B. Carlson, 2001-Aug-23 EVLA Phase-II Planning Meeting