Two methods to observe tutorial

Slides:



Advertisements
Similar presentations
Separating from SMS in Your BlackBerry 8800 Separating from SMS in Your BlackBerry 8800 In this training module you will learn how to separate.
Advertisements

Creating a UAA VPN Connection For Your Computer To Facilitate Polycom PVX – For Windows XP Last Modified On 10/25/2010 University of Alaska Anchorage,
9/16/2003; Revised 7/12/2004 DPI Vehicle Fleet Management IM-1 1 Use this procedure to extend material master data to another plant. 1.From the SAP R/3.
Material Number (DOT#) Search DPI Vehicle Fleet Management IM-5
Issuing Material to Work Orders DPI Vehicle Fleet Management
Create a Study Abroad Section
DPI Vehicle Fleet Management
DPI Vehicle Fleet Management- DR-14
The Smarter Balanced Assessment Consortium
Display Material Master DPI Vehicle Fleet Management IM-3
How to complete a Referral Form via “Student” tab
Create Odometer Measurement Documents
DPI Vehicle Fleet Management DR-21
DPI Vehicle Fleet Management DR-18
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
W/o Completing a Physical Inventory DPI Vehicle Fleet Management IA-1
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
DPI Vehicle Fleet Management DR-10
EBSCOhost Digital Archives Viewer
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
(Work Orders W/One Operation) DPI Vehicle Fleet Management TE-2
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Point of Rental Training
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Presentation transcript:

Two methods to observe tutorial Standard Method This method allows presentation to be resized to user preference. Slide Show Method (Example below) Presentation fills entire screen Click on Slide Show tab at top of screen Click icon <From Beginning> Note: Either method; to advance click the progression arrow in the bottom right corner of each slide or press the down-arrow key.

Transaction Procedures Welcome to BSIP 101 Transaction Procedures “Changing Inventory Storage Location” Instructor: Stephen Wright DPI Technical Consultant

The material for which you desire to change MUST be extended to the plant before any changes can occur. If it is not, please stop this tutorial and start the tutorial titled “Extending Material to Plant.”

Purpose: To change materials extended into inventory storage location.

One transaction is required to complete this procedure: ZMM02Z Let’s get started -

Your screen should look similar to the example at the right. From the SAP R/3 Easy Access screen box type ZMM02Z or from your favorites menu, select transaction ZMM02Z – Change Plant Material Your screen should look similar to the example at the right.

Create Material (Initial Screen) A new window opens: Create Material (Initial Screen) Enter the following: Material - Enter any valid material number. (Ex: For training purposes we selected EEA000016) Press <Enter> or Click Continue Icon to progress.

Organizational Levels A new window opens: Organizational Levels Tip: The Organizational Levels window should contain your plant data; if not return to the “Initial Setup” tutorial and complete initial setup for ZMM01Z. Tip: If the codes did not populate, but, you know them – then key them directly. With Plant & Storage Location codes entered press <Enter> or click the Continue Icon

Change Material window Saving returns you to: Change Material window Note: The DOT # will be displayed in the Material field and to the right a description of the item.

Change Material window Saving returns you to: Change Material window Click on the Drop-down menu icon Select Plant data / Stor. 1 from the dropdown list by double clicking. Enter the correct information for the Storage Bin. Click Save icon to record changes.

Questions Email: Stephen.Wright@dpi.nc.gov

Thank You! Stephen Wright Technical Consultant