Soren Dissing - EUROCONTROL

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Unmanned Aircraft Systems EUROCONTROL ATM Integration
Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
David Bowen Head of ATM Operations and Systems
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
Title 36pt Georgia Subtitle 24pt Georgia Italics Presentation Information Arial Narrow 24pt Survey of Aviation Emissions Management Measures Ted Milczarek.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Required Total System Performance (RTSP) Bernard Miaillier EUROCONTROL Agenda Item 3 EUROCONTROL.
Federal Aviation Administration AP23 briefing on D3: ASAS Concept of operations ASAS-GN Seminar 13 Nov 08, Rome By Ken Carpenter, QinetiQ.
Joint Planning and Development Office (JPDO) Col Mark Weadon Air Force Weather Deputy for Federal Programs May 17 th,
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
1 Stan Pszczolkowski FAA Technical Center (609) October 19, 2005 Federal Aviation Administration.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
How the NextGen Florida Test Bed could enable integration of Domestic and International Space Traffic airspace.
The Cost-Effective Airport Concept Frankfurt, 4th February 2014.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Impact of the IT Revolution on the Airspace System Dr. Philip Carrigan Strategic Programs Air Traffic Management Systems.
Additional aviation spectrum allocation for AM®S
FAA VoIP- Interoperability Event Summary Report
ESA Iris Programme: status
Welcome to the SESAR SWIM Master Class 2013
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Introduction of TBO within OptiFrame
NextGen and Its Impact on Performance
OPTIFRAME : Project Overview
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
OptiFrame WP1: Project Management
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Future Communications Infrastructure – An update
ASSTAR Project Overview & User Forum Objectives
The Single European Sky Implementation Programme: SESAME
Aviation Innovation for Regional Integration
FAA and JPDO ASAS Activities
Communications Operating Concept & Requirements (COCR)
Joint Planning and Development Office “Where new ideas are welcome”
Communications Operating Concept & Requirements (COCR)
Long term vision for Air Traffic Systems CARATS
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
Presentation transcript:

Soren Dissing - EUROCONTROL Communications Operating Concept & Requirements (COCR) - Status and Next Steps AGCFG/ICAO ACP WG-C Brussels September, 2006 Brent Phillips - FAA Soren Dissing - EUROCONTROL 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Outline Purpose of the COCR Producing Version 1.0 History Comment process Acceptance of Version 1.0 Development of Version 2.0 Areas for further work Conclusions 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Aircraft Traffic  Communications A Day in 2025 More than double today’s traffic Advanced ATC concept Data is Primary … T -Throughput C - Continuity I - Integrity A - Availability 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Overview of the COCR (1/3) Captures the operational requirements for Phase 1 (from now to 2020) and Phase 2 (beyond 2020) Concept in Phase 1 is drawn largely from EUROCONTROL ATM concept document for 2008-11 & 2020 and beyond Concepts in Phase 2 are based on more extensive use of Phase 1 services and NGATS operations (e.g. 4D Trajectory Management) Autonomous operations take place in some parts of the airspace Auto-EXECUTE has been added in line with NGATS concepts for wake vortex separation Based on postulated ATS operational concept using existing documentation and extending it into the future Provides traceability to information sources 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Overview of the COCR (2/3) From the operational concepts, information flows have been identified in representative test volumes of airspace i.e. ‘positions/sectors’ in Airport, TMA, En Route, & Oceanic. Airport positions & Radar sectors in Phase 1 similar to today Radar sectors larger in Phase 2, perhaps 2-3x. Airport positions pretty much the same as Phase 1 Covers all ATS and AOC air-to-ground and air-to-air voice and data communication Includes ADS-B and AOC applications Includes micro-jets & UAV’s (only ATC control element) Does not include Air Marshall, UAV Command & Control, SWIM, or spacecraft communications 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Overview of the COCR (3/3) Identifies all communication requirements based on safety and security analysis Availability, continuity, reliability and latency Requirements are technology independent Communication requirements are then used in a queuing model for communication loading (b/s per service volume) Aircraft numbers are grown over time using EUROCONTROL SAAM data in ECAC – MLM in US At the end of the document a typical example use of the results volumes in a real world environment Will help technology assessment activity 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

COCR V1.0 Summary Overall In terms of capacity, future ATS air/ground data requirements appear to be relatively modest. However, this problem has more than one dimension, as delivery of air traffic services requires simultaneous achievement of many, often challenging, requirements. The safety-driven combination of capacity, integrity, reliability, latency and coverage requirements typically dictate unique solutions for aviation. While Phase 2 requirements appear to be beyond the capabilities of systems currently deployed, numerous advanced technologies, as well as options for further evolution of today’s most capable systems, should meet all but the most demanding needs. To implement this two-phased vision affordably, careful examination of the services, especially those that drive requirements, will be necessary to balance costs and benefits. 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Current Status Version 1.0 is mature Significant feedback from industry (over 300 comments received) Comments incorporated into V1.0 COCR V1.0 distributed at the beginning of March 2006 On the EUROCONTROL website Provided to SESAR Signed by FAA senior management and on their website Input to NGATS Some outstanding issues to be resolved in a new version of the COCR 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

COCR Version 2.0 Activities to finalise COCR Version 2.0 include: Ensuring satisfactory agreement among stakeholders with some of the more stringent services and the surrounding concept of their use Capture and definition of missing services Further definition of the services to ensure a more complete understanding of their operational use Categorisation of the services into groups based on likeness Assessment of the safety and security requirements associated with each group Assessment of the associated performance requirements impact Adding an Executive Summary Respond to comments received on COCR Version 1.0 and clarify areas of ambiguity 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Phase 2 Services Better description and operational definition of Phase 2 services e.g. COTRAC Clarification of their operational use Development of specimen OSED’s to better define safety requirements & provide more accurate communication performance assumption Recognising that data services are the ‘primary’ means of communication Clarify the use of service requirements in or at the boundary of Autonomous Operations Areas Understand the ramification of the operational scenarios on the technical performance Are they realistically achievable? 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Iterative Loop Process 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Conclusions COCR Version 1.0 was a major achievement Being widely reviewed Input to SESAR and NGATS Used in technology assessment Further refinement of the COCR Concepts being reviewed in the light of safety & performance requirements Review feasibility of meeting the concept requirements Close co-operation between FAA and EUROCONTROL to complete tasks Progress will be reported to ACP and feedback sought COCR Version 2.0 targeted for completion in March 2007 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Thank You … 4/29/2019 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N