<month year> DCN k January 2011

Slides:



Advertisements
Similar presentations
Doc.: b Submission May 2004 Robert Poor, Ember CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE Submission Slide 1 NOTE: Update all red fields replacing with your information; they are required. This is a manual update in appropriate.
Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE Submission Jan 2016 Al Petrick, Jones-Petrick and AssociatesSlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
TGv Closing Report March 2008
IEEE TGa Project Timeline
IEEE P Working Group for Wireless Personal Area Networks
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
TGax March 2017 Closing Report
IEEE P Working Group for Wireless Personal Area Networks
July 2014 doc.: IEEE November 2017
TGad September 2010 Closing Report
January 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
Submission Title: TG4m 4TV Closing Report for May 2013
doc.: IEEE <doc#>
doc.: IEEE <doc#>
TGaf Waikoloa Closing Report
January 2017 doc.: IEEE January 2017
平成30年12月 doc.: IEEE /424r1 November 2007
Submission Title: [Proposed project timeline]
May 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted: [
doc.: IEEE <doc#>
doc.: IEEE <doc#>
TG4k Project Time line (draft)
TGae Closing Report – May 2010
TGs Montreal Closing Report
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
IEEE ah Timeline Projection
TGaf Indian Wells Closing Report
doc.: IEEE <doc#>
SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
November, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2015]
802.11bd Timeline Date: Authors: January 2019
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
IEEE P Working Group for Wireless Personal Area Networks
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comment.
January 2017 doc.: IEEE January 2017
TGaf Waikoloa Closing Report
Jan 2016 doc.: IEEE Jan 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison.
Sheung Li Task Group J Chairperson January 16, 2004
January 2000 doc.: IEEE /020r0 January 2000
IEEE SGa Project Timeline
May 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted: [
IEEE Revision Timeline
September 2009 Closing Report
Tge draft ballot information
Timeline for the Light Communications TG
November 2010 Closing Report
July 2014 doc.: IEEE /29/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comments.
TGae Closing Report – July 2011
TG 1 November Session Opening Report
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comment.
TGaf San Antonio Closing Report
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
July 2014 doc.: IEEE /21/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comments.
04 June 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4g SUN Timeline Proposal] Date Submitted:
TGae Closing Report – November 2011
IEEE aj May Closing Report
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
May 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing Report] Date Submitted: [May 2009]
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
TGax November 2017 Closing Report
TGbd Closing Report – Vietnam
Presentation transcript:

<month year> DCN 15-11-0119-01-004k January 2011 NOTE: Update all red fields replacing with your information; they are required. This is a manual update in appropriate fields. All Blue fields are informational and are to be deleted. Black stays. After updating delete this box/paragraph. <Shu Kato, NICT> <author>, <company>

Task Group 802.15.4k Timeline (draft) January 2011 Task Group 802.15.4k Timeline (draft) January 20, 2011 Shu Kato (NICT) <Shu Kato, NICT>

Purpose Draft TG4k Timeline assuming following January 2011 Purpose Draft TG4k Timeline assuming following Working in parallel for CFA and CFP Less than 300 technical comments as the outcome of the Letter Ballot Two recirculation for Letter Ballot comment resolution over 6 months One Sponsor Ballot recirculation over 4 months <Shu Kato, NICT>

January 2011 Important Time Frames for TG Timeline - Depending on how many technical comments received at the first Letter Ballot - 1. Examples taken i. Completed: TG3c (from March 2005 to September 2009: 4.5 years) ii. In progress: TG4f (12, 2008~ ), TG4g (12, 2008~ ), 2. Important time frames Time TG formed Time for CFA Time for Tech Guidelines Time for CFP Time for Final Proposal Time for Baseline Document completion Time for Letter Ballot resolution Time for Sponsor Ballot resolution Time for Revcom approval <Shu Kato, NICT>

January 2011 Past /Current Task Group Performance Examples TG3c (2005/3 – 2009/9) / TG4f (2008/12~) / TG4g (2008/12~) Important time frames to be considered: TG3c / TG4f / TG4g Time for CFA: - / 2 / - Time for Tech Guidelines: - / 6 / 4 Time for CFP issued: 22 / 6 / 2 Time for Final Proposal: 4 / 4 / 6 Time for Baseline Doc. completion: 10 / 14 / 6 Time for Letter Ballot resolution: 14 (about 500 tech. comments, 3 recirculation) / Nov., 2010 ~ (first LB comment (134 Tech. comments) resolution be completed in Jan., 2011) / Mar., 2010~ (first LB failed(about 1400 tech. comments), 2nd LB comment (713 tech. comments) resolution be completed in Mar., 2011) vii. Time for Sponsor Ballot resolution: 4 ( 1 recirculation) / - / - viii. Time for Revcom approval: 2 / - / - <Shu Kato, NICT>

January 2011 802.15.4k Timeline (draft) Assumptions: two LB recirculation and one SB recirculation <Shu Kato, NICT>