Arc Standing Committee

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0308r0 Submission March 2005 J. Walker, Intel Corporation, D. Stanley, Agere SystemsSlide 1 March 2005 ADS Closing Report Notice:
Advertisements

Doc.: IEEE /0333r1 Submission Mar 2009 David Bagby, Calypso Ventures, Inc.Slide ARC Standing Committee Date: Authors:
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Doc.: IEEE /1197r0 Submission Sept 2005 Tom Siep, Cambridge Silicon RadioSlide 1 Architecture Standing Committee Wireless Sub-Group Notice: This.
Doc.: IEEE /1054r1 Submission July 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-report-minutes-july-2011 Date: Authors:
Doc.: IEEE /0867r0 Submission July 2008 Darwin Engwer, Nortel NetworksSlide 1 MAC Component Breakdown Topics for Discussion Date: Authors:
Doc.: IEEE /0867r1 Submission July 2008 Darwin Engwer, Nortel NetworksSlide 1 MAC Component Breakdown Topics for Discussion Date: Authors:
May 2014 Agenda doc.: IEEE /0488r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
July 2014 Agenda doc.: IEEE /0753r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
Liaison from to Date: May 17, 2012 July 2012 Month Year
Proposal for SSPN Interface Cluster
TGad Architecture Discussion Topics
ARC-SC-agenda-Mar-2016 Date: Authors: July 2009
WG Technical Editor’s Closing Report
ARC-agenda-march-2014 Date: Authors: July 2009
WG Technical Editor’s Report
[VHT SG Approach Proposal]
Arc Standing Committee
TGp Closing Report Date: Authors: July 2005 Month Year
Task Group ac Process Overview
Task Group Process Overview
WG Technical Editor’s Report
ARC SC Closing Report – July 2013
Arc Standing Committee
Arc Standing Committee
ARC-agenda-report-minutes-july-2011
WG Technical Editor’s Report
ARC Standing Committee
Arc Standing Committee
Arc Standing Committee
Arc Standing Committee
IMT-2020/5G SC Proposal Date: Authors: July 2016
IEEE r: Fast BSS Transition TG Agenda
EC Update on TV Whitespace ECSG
Sept 2008 Closing Plenary Motions
Sept 2008 Closing Plenary Motions
Task Group Process Overview
TGu Agenda Date: Authors: May 2005 May 2005
WG Editor’s Meeting (May ‘10)
IEEE TGz September Agenda
ARC-agenda-mar-2015 Date: Authors: July 2009
[place presentation subject title text here]
Stephen McCann, Siemens Roke Manor
Arc Standing Committee
IMT-Advanced Status Report
ARC-agenda-may-2014 Date: Authors: July 2009
ARC-agenda-july-2015 Date: Authors: July 2009
ARC Recommendation: MIB Attribute Types & Usage
IMT-2020/5G SC Proposal Date: Authors: July 2016
July 2009 Closing Plenary Motions
ARC-agenda-july-2015 Date: Authors: July 2009
P4001 Meeting #3 Hyperspectral Stds.
WNG SC Agenda Date: Authors: July 2016 July 2013
Arc SC Chairs’ Report Jacksonville, FL, US May ‘08
WG11 Snapshot May 08 Date: Authors: Name Company Address
ARC-agenda-sep-2014 Date: Authors: July 2009
ARC-agenda-may-2013 Date: Authors: July 2009
ARC-agenda-november-2013
Arc SC Chairs’ Report Denver, CO, US July ‘08
ARC-agenda-july-2013 Date: Authors: July 2009
WG Technical Editor’s Report
The Need for an AP Functional Description
WNG SC Agenda Date: Authors: July 2016 July 2013
Shared Infrastructure
ARC-agenda-report-minutes-july-2011
TGu Agenda Date: Authors: May 2005 May 2005
ARC-agenda-sep-2015 Date: Authors: July 2009
Liaison from to Date: September 20, 2012 September 2012
Wireless Architectural Thoughts
Presentation transcript:

802.11 Arc Standing Committee July 2008 doc.: IEEE 802.11-08/0xxxr0 July 2008 802.11 Arc Standing Committee Date: 2008-07-15 Authors: David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.

Agenda and working document July 2008 doc.: IEEE 802.11-08/0xxxr0 July 2008 Abstract Agenda and working document for ARC SC, July 2008, Denver. David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.

IEEE P802.11 Architecture Committee July 2008 IEEE P802.11 Architecture Committee Agenda & working document for July 2008 sessions. David Bagby, Calypso Ventures, Inc.

July 2008 doc.: IEEE 802.11-08/0xxxr0 July 2008 Arc Agenda – July 2008 Admin Attendance Policies Meeting goals Focused discussion topic: MAC block diagrams Ref this document Doc 08/xxxx (Darwin Engwer, Nortel) Q&A David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.

Attendance Reminder to attendees to sign in for .11 attendance credit July 2008 Attendance Reminder to attendees to sign in for .11 attendance credit David Bagby, Calypso Ventures, Inc.

IP policy A SC is covered by the WG IP policy announcements. July 2008 IP policy A SC is covered by the WG IP policy announcements. Even though we don’t have to read the policy to SC attendees, all attendees are reminded that the policies are in effect and apply to SC sessions. David Bagby, Calypso Ventures, Inc.

Arc SC – Meeting Goals Short recap of May session July 2008 doc.: IEEE 802.11-08/0xxxr0 July 2008 Arc SC – Meeting Goals Short recap of May session Revision of project mixture to include both existing and “future needs” activity. Focused Discussion Topic MAC block diagrams (mixed time frames) Existing 2007 std Current TG impacts Exploratory future looking discussion What’s “upper” and “lower”? David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.

The 802.11 Arc Standing Committee: Mission July 2008 The 802.11 Arc Standing Committee: Mission Established by the new WG Chair as a Standing Committee in May 2008 Mission: The Arc group is tasked to discover, analyze, codify, and promote a common understanding of 802.11 architecture. Discover: To notice or learn, especially by making an effort; Archaic To reveal or expose; Analyze: To separate (a material or abstract entity) into constituent parts or elements; determine the elements or essential features of; Codify: To arrange or systematize; Promote: To help or encourage to exist or flourish; The Arc team utilizes 802.11 members with significant expertise, experience, and history within 802.11. David Bagby, Calypso Ventures, Inc.

Arc: Initial Activities (May 2008) July 2008 Arc: Initial Activities (May 2008) 1) What is the Architecture as of 802.11 2007? Stick strictly to “what it is”, not “what do we wish it was”. 2) What will the Arc impacts of current 802.11 TG activities? 3) Work with SGs; which portions of 802.11 Architecture they are modifying? 4) Contact point for 802.1 architecture liaison topics. David Bagby, Calypso Ventures, Inc.

Arc: Initial Activities (Feedback from May 2008) July 2008 Arc: Initial Activities (Feedback from May 2008) Attendees expressed desire to for the project mix to be multiple, smaller, shorter duration tasks. Include more “forward looking” activity A suggested forward looking example: VHT ”MAC split / reuse” David Bagby, Calypso Ventures, Inc.

July: A smaller topic, for a mixed look at history and future needs Instead of starting on project 1 (analysis of existing architecture) from May, we are going to take a single, limited architectural “chunk” topic and explore What is it in the 2007 std? (May Project 1 aspect) How will current activities impact it? (May Project 2 aspect) SG/future future needs? (May project 3 aspect + extapolations) Driven by a specific example question David Bagby, Calypso Ventures, Inc.

Division of Topic over Arc Sessions July 2008 Division of Topic over Arc Sessions Arc Session 1 2007 status Current .11 activities impact Arc Session 2 Current .11 activities impact – cont. Possible future needs David Bagby, Calypso Ventures, Inc.

Discussion Topic Ground Rules July 2008 Discussion Topic Ground Rules We are exploring - Small group, open, honest dialog There is no “right” or wrong”, we’re seeking shared understanding, (any debating points “scored” are not redeemable…) Session is not oriented toward being a tutorial, discussion presumes familiarity with 2007 contents. David Bagby, Calypso Ventures, Inc.

July Topic: Mac block diagrams Specific discussion questions: What’s inside the block? What’s “upper” and “lower”? Existing from 2007 std Current activity impacts (not in 2007) Exploratory future looking discussion David Bagby, Calypso Ventures, Inc.

MAC block diagram discussion July 2008 MAC block diagram discussion 2007 Some MAC diagrams from 2007 std Existing TG impacts To be fleshed out via interactive discussion SG/Future needs: What is “Upper” and “Lower”? Presentation 08/xxx – Darwin David Bagby, Calypso Ventures, Inc.

July 2008 802.11 2007 Diagrams David Bagby, Calypso Ventures, Inc.

July 2008 2007 figure 5-3 David Bagby, Calypso Ventures, Inc.

2007 figure 5-3 There are .11 MAC “blocks” at these locations… July 2008 2007 figure 5-3 There are .11 MAC “blocks” at these locations… There are MAC “blocks” at these locations… There are MAC “blocks” at these locations… There are MAC “blocks” at these locations… David Bagby, Calypso Ventures, Inc.

..and here in this diagram… July 2008 2007 Figure N-4 ..and here in this diagram… David Bagby, Calypso Ventures, Inc.

July 2008 2007 figure 10-1 David Bagby, Calypso Ventures, Inc.

This session, we are exploring inside this region… July 2008 2007 figure 10-1 This session, we are exploring inside this region… David Bagby, Calypso Ventures, Inc.

Some “internal MAC blocks”… July 2008 2007 figure 9-1 Some “internal MAC blocks”… David Bagby, Calypso Ventures, Inc.

One concpet for “what’s inside” July 2008 One concpet for “what’s inside” Doc 08/xxx (Darwin Engwer) David Bagby, Calypso Ventures, Inc.

Current TG impact Diagrams July 2008 Current TG impact Diagrams David Bagby, Calypso Ventures, Inc.

Current TG draft diagrams July 2008 Current TG draft diagrams TG Picture Candidates (for group discussion during July) TGk (measurements) TGn (Hi thruput) TGp (wave) TGr (roaming) TGs (mesh) TGu (ext nets) TGv (net mgmt) TGw (protected mgt frames) TGz (DLS) TGaa (Video) Others? David Bagby, Calypso Ventures, Inc.

July 2008 Future Needs Exercise David Bagby, Calypso Ventures, Inc.

“Perceived future need” July 2008 “Perceived future need” VHT sessions have talked loosely about “upper” and “lower” MAC…. What is that? David Bagby, Calypso Ventures, Inc.

Discussion experiment feedback July 2008 Discussion experiment feedback Good or bad approach? What aspects to pursue between July and Sept? David Bagby, Calypso Ventures, Inc.