Incorporating lot sizing into MRP

Slides:



Advertisements
Similar presentations
Chapter 14 – Resource Planning (MRP and ERP)
Advertisements

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
4. Production and Material Planning
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.
RESOURCE PLANNING SYSTEMS
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Material Requirements Planning
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Operations Management Material Requirements Planning
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
© Wallace J. Hopp, Mark L. Spearman, 1996, Material Requirements Planning (MRP) Unlike many other approaches and.
1 Material Requirements Planning or as we in the business like to call it - MRP Constrained Lot Sizing.
3rd Session: Chapter 2: Inventory Control From EOQ to ROP continued Chapter 3:The MRP Crusade TM 663 Operations Planning September 19, 2011 Paula Jensen.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
Orange County Convention Center Orlando, Florida | June 3-5, 2014 Planning Board Experiences – Scheduling and More Julie Lushbough and Veronica Morris.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Session 3 University of Southern California ISE514 September 1, 2015 Geza P. Bottlik Page 1 Outline Questions? Sales and Operations Planning Examples Qualifiers.
Production Planning and Control
Activity Scheduling and Control
RESOURCE PLANNING SYSTEMS
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
Aggregation To combine the creation of many similar products into one relevant measure of activity for the organization. Click here for Hint heuristic.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
Material Requirements Planning
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Nervous In management science, a condition in which a small change to input data can create major revisions to the conclusions suggested by a particular.
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
The Production Cycle Chapter 14.
The Material Requirements Planning Process
Enterprise Resource Planning, 1st Edition by Mary Sumner
AXUG Partner Showcase – Introducing Preactor
LSM733-PRODUCTION OPERATIONS MANAGEMENT
Concepts in Enterprise Resource Planning Third Edition
FDFPLSCP4A Manage and schedule production
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
Logistics 'Logistics is that part of the supply chain process that plans, implements and controls the efficient, effective flow and storage of goods, services.
RESOURCE PLANNING SYSTEMS
PRODUCTION ACTIVITY CONTROL (PAC)
aggregation To combine the creation of many similar products
Material Requirements Planning and Enterprise Resource Planning
MRP and ERP.
Chapter 5 Master Production Scheduling
CHAPTER 14 MRP and ERP.
MATERIAL Requirements planning MRP
Chapter 7 Capacity Planning and Management
Manufacturing Planning and Control
Material Requirements Planning (MRP)
CHAPTER 6- AGGREGATE PLANNING AND INVENTORY MANAGEMENT
MRP and ERP.
OUTLINE Questions? Quiz Discuss homework New Homework Start MRP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Operations Management
Planning and Scheduling in Manufacturing and Services
Enterprise Resource Planning, 1st Edition by Mary Sumner
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Incorporating lot sizing into MRP Lot sizing rule applied in MRP can lead into Lumpy demand structure as we go down in BOM Lumpy demand structure can cause serious capacity and inventory problems.

Problems in MRP 1 Capacity Infeasibility 2 Biased long lead times MRP assumes fixed lead times regardless of the lot sizes, this implies infinite capacity. 2 Biased long lead times MRP assumes constant lead time Production control managers gives lead times much longer than average manufacturing time to hedge against uncertainties. Result is large amount of inventories 3 Ignored uncertainties Demand, supply, and internal uncertainties.

W.J. Hope and M.L. Spearman, Factory Physics Problems in MRP 4 Rolling horizon effects The MRP is implemented for the first period and the planning is redone at the beginning of the next period after adding one more period to the panning horizon The decisions implemented may not be the best after adding the next period to the planning horizon 5 System nervousness The changes in the schedules due to the change in master production schedule (forecast updates, late delivery of raw material and parts, equipment failures, unpredictable yields). Frozen zones (firm orders); Not to allow any changes in some initial periods (e.g. 3 weeks) in MPS W.J. Hope and M.L. Spearman, Factory Physics

Capacity Constraints Often, capacity constraints prohibit implementation of a lot-sizing solution Example Demand: 108 148 150 98 65 300 Optimal Solution: 256, 0, 313, 0, 0, 300 What if our maximum capacity is 300 units per period? We assume that we have to meet demand

Capacity Solution First check overall feasibility considering capacity. Sum of requirements over a number of periods can never be bigger than the sum of capacity over those same periods. If it is bigger, then we cannot meet demand.

Capacity Solution- feasibility check 1 2 3 4 5 6 Total Req. Total Cap. 108 148 150 98 65 300 869 1800 569 1500 504 1200 406 900 256 600

Solution to Capacity Problem Simple procedure: Determine which periods will be over capacity and move the requirements backward in time preferable to the closest production period where there is enough capacity preferably as a complete lot if possible. Try to improve the solution; eliminatee some lots and shift their production backward, completely. Better procedure: Incorporate capacity constraints into algorithms.

Manufacturing Resources Planning (MRPII) In addition to MRP logic, MRPII considers Adjusting Master Production Scheduling (MPS) Rough Cut Capacity Planning (RCCP) Quick check of the capacity of a few key resources to ensure the feasibility of MPS Capacity Requirements Planning (CRP) Detailed check of the capacity using the schedules produced by MRP. If a work center is overloaded, over loading is solved by shifting the lot to earlier/later periods, lot splitting, rerouting etc. W.J. Hope and M.L. Spearman, Factory Physics

MRP II Planning Hierarchy Long-term planning Demand Forecast Aggregate Production Planning Master Production Scheduling Material Requirements Job Pool Release Dispatching Capacity Requirements Rough-cut Capacity Resource Routing Data Inventory Status Bills of Material Closed-loop MRP Intermediate- term planning Short-term control From : http://www.factory-physics.com

Solving capacity problems Overlapping Sends part of the work to following operations before the entire lot is complete, this reduces lead times. Order or lot splitting Breaking up the order into smaller lots and running some parts earlier (or later) in the schedule Operations splitting Sends the lot to two different machines for the same operation Shorter throughput time but increased setup costs Rerouting the operation Selecting another work-center for the operation

Capacity planning;order splitting Split and shift the lot forward, make sure that due date is met Shift the lot backward Capacity of a work center in hours 1 2 3 4 5 6 7 1 2 3 4 5 6 7 Period (weeks) Period (weeks)

Extensions of MRPII Enterprise Resource Planning In addition of MRP, ERP involves supply chain management, customer relationship management, Human resource management, Finance and accounting. Distribution resource planning MRP implementation in multi level supply chain, considering all levels. It is a time phased stock replenishment plan for all levels in a supply chain.

Enterprise Resource Planning (ERP) An extension of the MRP system to tie in customers and suppliers Allows automation and integration of many business processes from supplier evaluation to customer invoicing. Shares common data bases and business practices Produces/uses information in real time Allows collection of key performance indicators and generations of many reports.

ERP Modules http://www.esds.co.in/blog/basic-modules-of-erp-system/#sthash.NAbW25yp.dpbs

ERP and MRP

SAP’s ERP Modules