ORION ALTERNATIVE SCHOOL NEIGHBORHOOD MEETING MAY 8, 2017
ORION ALTERNATIVE SCHOOL EXISTING CONDITIONS
ORION ALTERNATIVE SCHOOL LPA MASTER PLAN
ORION ALTERNATIVE SCHOOL PHASE 1 SCOPE “Blue Line”
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE
ORION ALTERNATIVE SCHOOL PRIORITIZED COST
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTIONS
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 1
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 1
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 2
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 2
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 3
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 3
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 4
ORION ALTERNATIVE SCHOOL MEASURE T REVISED PROGRAM SCOPE: PROPOSED OPTION 4
ORION ALTERNATIVE SCHOOL CHALLENGES AND CONSIDERATIONS Phase I kindergarten work will remove one classroom from total classroom count. Phase I introduction of Student Support Center will eliminate needed library. Cloth shade structure not a priority for campus. Multi-use modernization needed to add storage so that the space can be better utilized.
ORION ALTERNATIVE SCHOOL QUESTION ANSWER SESSION Questions?